@@ -1,31 +1,36 @@
---
status: partial
status: complete
phase: 01-framework-kernel-foundation
source: [01-VERIFICATION.md]
started: 2026-09-16T12:39:17Z
updated: 2026-09-16T12:39:17Z
updated: 2026-09-16T12:44:02Z
---
## Current Test
[awaiting human testing]
Human verification approved 2026-09-16.
## Tests
### 1. Interactive terminal rendering
expected: Run `./bin/hello greeter:hello` and one tool command (`summer make:plugin --help` or a spinner-using command) in a real TTY. Braille spinner / box-drawing table / colored status glyphs appear; prompts are interactive. NO_COLOR=1 or TERM=dumb removes ANSI.
result: [pending]
expected: Run `./bin/hello greeter:hello` and one tool command (`summer make:plugin --help` or a spinner-using command) in a real TTY. Braille spinner / box-drawing table / colored glyphs appear; prompts are interactive. NO_COLOR=1 or TERM=dumb removes ANSI.
result: pass
reported: |
`./bin/hello greeter:hello` showed a box-drawing plugin/status table, interactive `? show greeting? [Y/n]`, then `name=hello-app posts_per_page=10 debug=false extra=hello-from-optional events=ok collected=greeter handled=true`.
`go run ./cmd/summer make:plugin --help` printed the cobra help for `summer make:plugin <id>`.
### 2. Rebuild feel under `summer dev`
expected: In `examples/hello`, run `go run ../../cmd/summer dev`, edit `plugins/greeter/plugin.go`, and watch the terminal. A `rebuild: <duration>` line prints, the child restarts, and generated `main.go` / `plugins.gen.go` writes do not loop.
result: [pending]
result: pass
reported: |
`go run ../../cmd/summer dev` from `examples/hello` printed `built hello in 480ms` then `rebuild: 480ms` and started the child (`hello [command]` usage). Approved without a reported watch-loop.
## Summary
total: 2
passed: 0
passed: 2
issues: 0
pending: 2
pending: 0
skipped: 0
blocked: 0

View File

@@ -1,7 +1,7 @@
---
phase: 01-framework-kernel-foundation
verified: 2026-09-16T12:37:13Z
status: human_needed
status: passed
score: 5/5 must-haves verified
overrides_applied: 0
human_verification:
@@ -17,7 +17,7 @@ human_verification:
**Phase Goal:** The `summer` binary boots from layered YAML config, plugins self-register through one required interface plus optional capability interfaces, a typed event bus and service registry are available, and a CLI command framework with a dev watch loop exists — built only as far as the first vertical slice will need it, per the interleaved-not-sequential kernel approach.
**Verified:** 2026-09-16T12:37:13Z
**Status:** human_needed
**Status:** passed
**Re-verification:** No — initial verification
**MVP note:** ROADMAP marks this phase `mode: mvp`, but the phase goal is not a User Story (`gsd-sdk query user-story.validate` → `valid: false`). Direct instruction was to verify and write this report, so verification used the five ROADMAP success criteria as the contract and treated the developer as the user for flow coverage. Individual plan objectives are already in User Story form.