docs(phase-01): complete phase execution
This commit is contained in:
@@ -1,7 +1,7 @@
|
||||
---
|
||||
phase: 01-framework-kernel-foundation
|
||||
verified: 2026-09-16T12:37:13Z
|
||||
status: human_needed
|
||||
status: passed
|
||||
score: 5/5 must-haves verified
|
||||
overrides_applied: 0
|
||||
human_verification:
|
||||
@@ -17,7 +17,7 @@ human_verification:
|
||||
|
||||
**Phase Goal:** The `summer` binary boots from layered YAML config, plugins self-register through one required interface plus optional capability interfaces, a typed event bus and service registry are available, and a CLI command framework with a dev watch loop exists — built only as far as the first vertical slice will need it, per the interleaved-not-sequential kernel approach.
|
||||
**Verified:** 2026-09-16T12:37:13Z
|
||||
**Status:** human_needed
|
||||
**Status:** passed
|
||||
**Re-verification:** No — initial verification
|
||||
|
||||
**MVP note:** ROADMAP marks this phase `mode: mvp`, but the phase goal is not a User Story (`gsd-sdk query user-story.validate` → `valid: false`). Direct instruction was to verify and write this report, so verification used the five ROADMAP success criteria as the contract and treated the developer as the user for flow coverage. Individual plan objectives are already in User Story form.
|
||||
|
||||
Reference in New Issue
Block a user