docs(10-05): record plan 05 progress, decisions and ADMIN-06 in state, roadmap and requirements
This commit is contained in:
@@ -112,7 +112,7 @@ Requirements for v1 (the Płytarium port). Each maps to roadmap phases. "User" b
|
|||||||
- [ ] **ADMIN-03**: A relation-manager schema (search, link, unlink, manage/view lists) replaces the one `partial` field in Collections' editors tab
|
- [ ] **ADMIN-03**: A relation-manager schema (search, link, unlink, manage/view lists) replaces the one `partial` field in Collections' editors tab
|
||||||
- [ ] **ADMIN-04**: Admin CRUD endpoints per controller expose extension hooks (listExtendQuery, formExtendQuery, formBeforeCreate, formBeforeUpdate, relationExtendManageQuery), and bulk delete runs each record's lifecycle hooks
|
- [ ] **ADMIN-04**: Admin CRUD endpoints per controller expose extension hooks (listExtendQuery, formExtendQuery, formBeforeCreate, formBeforeUpdate, relationExtendManageQuery), and bulk delete runs each record's lifecycle hooks
|
||||||
- [ ] **ADMIN-05**: A settings model binds to a settings screen through the same schema pipeline (search_use_typesense)
|
- [ ] **ADMIN-05**: A settings model binds to a settings screen through the same schema pipeline (search_use_typesense)
|
||||||
- [ ] **ADMIN-06**: A minimal Vue 3 + TypeScript SPA renders login, permission-gated navigation, lists, forms and the relation manager for Albums, Artists, Collections, Genres and Styles using generated types
|
- [x] **ADMIN-06**: A minimal Vue 3 + TypeScript SPA renders login, permission-gated navigation, lists, forms and the relation manager for Albums, Artists, Collections, Genres and Styles using generated types
|
||||||
|
|
||||||
### Quality and cutover (QA)
|
### Quality and cutover (QA)
|
||||||
|
|
||||||
@@ -224,7 +224,7 @@ Which phases cover which requirements. Updated during roadmap creation.
|
|||||||
| ADMIN-03 | Phase 9 | Pending |
|
| ADMIN-03 | Phase 9 | Pending |
|
||||||
| ADMIN-04 | Phase 9 | Pending |
|
| ADMIN-04 | Phase 9 | Pending |
|
||||||
| ADMIN-05 | Phase 9 | Pending |
|
| ADMIN-05 | Phase 9 | Pending |
|
||||||
| ADMIN-06 | Phase 10 | Pending |
|
| ADMIN-06 | Phase 10 | Complete |
|
||||||
| QA-01 | Phase 2 | Complete |
|
| QA-01 | Phase 2 | Complete |
|
||||||
| QA-02 | Phase 2 | Complete |
|
| QA-02 | Phase 2 | Complete |
|
||||||
| QA-03 | Phase 2 | Complete |
|
| QA-03 | Phase 2 | Complete |
|
||||||
|
|||||||
@@ -424,7 +424,7 @@ Plans:
|
|||||||
3. The Collections form's relation manager lets an admin search, link and unlink an editor.
|
3. The Collections form's relation manager lets an admin search, link and unlink an editor.
|
||||||
4. API calls in the SPA use TypeScript types generated from the OpenAPI document, with no hand-maintained duplicate type.
|
4. API calls in the SPA use TypeScript types generated from the OpenAPI document, with no hand-maintained duplicate type.
|
||||||
|
|
||||||
**Plans**: 4/5 plans executed
|
**Plans**: 5/5 plans executed
|
||||||
**UI hint**: yes
|
**UI hint**: yes
|
||||||
|
|
||||||
Plans:
|
Plans:
|
||||||
@@ -442,7 +442,7 @@ Plans:
|
|||||||
- [x] 10-04-PLAN.md — Relation manager with picker modal, and shell polish (flyout, collapse, user menu, breadcrumbs, dark mode)
|
- [x] 10-04-PLAN.md — Relation manager with picker modal, and shell polish (flyout, collapse, user menu, breadcrumbs, dark mode)
|
||||||
|
|
||||||
**Wave 5** *(blocked on Wave 4 completion)*
|
**Wave 5** *(blocked on Wave 4 completion)*
|
||||||
- [ ] 10-05-PLAN.md — Unit tests last: Vitest and Go coverage, assembled acceptance, check-phase10.sh gate and security evidence
|
- [x] 10-05-PLAN.md — Unit tests last: Vitest and Go coverage, assembled acceptance, check-phase10.sh gate and security evidence
|
||||||
|
|
||||||
### Phase 11: Jobs, realtime and search infrastructure
|
### Phase 11: Jobs, realtime and search infrastructure
|
||||||
|
|
||||||
@@ -547,7 +547,7 @@ Phases execute in numeric order: 1 → 2 → 3 → 4 → 5 → 6 → 7 → 8 →
|
|||||||
| 7. User plugin and authentication | 8/8 | Complete | 2026-09-23 |
|
| 7. User plugin and authentication | 8/8 | Complete | 2026-09-23 |
|
||||||
| 8. OAuth2.1 authorization server | 10/10 | Complete | 2026-09-23 |
|
| 8. OAuth2.1 authorization server | 10/10 | Complete | 2026-09-23 |
|
||||||
| 9. Backend admin authentication and schema pipeline | 12/12 | In Progress| |
|
| 9. Backend admin authentication and schema pipeline | 12/12 | In Progress| |
|
||||||
| 10. Admin Vue SPA | 4/5 | In Progress| |
|
| 10. Admin Vue SPA | 5/5 | In Progress| |
|
||||||
| 11. Jobs, realtime and search infrastructure | 0/TBD | Not started | - |
|
| 11. Jobs, realtime and search infrastructure | 0/TBD | Not started | - |
|
||||||
| 12. Płytarium API — Collections and Albums | 0/TBD | Not started | - |
|
| 12. Płytarium API — Collections and Albums | 0/TBD | Not started | - |
|
||||||
| 13. Płytarium API — wishlist, notifications, CSV, credentials, public routes | 0/TBD | Not started | - |
|
| 13. Płytarium API — wishlist, notifications, CSV, credentials, public routes | 0/TBD | Not started | - |
|
||||||
|
|||||||
@@ -3,17 +3,17 @@ gsd_state_version: "1.0"
|
|||||||
milestone: v1.0
|
milestone: v1.0
|
||||||
current_phase: 10
|
current_phase: 10
|
||||||
current_phase_name: Admin Vue SPA
|
current_phase_name: Admin Vue SPA
|
||||||
status: executing
|
status: verifying
|
||||||
stopped_at: Completed 10-04-PLAN.md
|
stopped_at: Completed 10-05-PLAN.md
|
||||||
last_updated: "2026-09-27T15:28:59.994Z"
|
last_updated: "2026-09-27T16:23:56.300Z"
|
||||||
last_activity: 2026-09-27
|
last_activity: 2026-09-27
|
||||||
last_activity_desc: Phase 10 plan 04 relation manager and shell polish completed
|
last_activity_desc: Phase 10 plan 05 unit tests, assembled acceptance and phase gate completed
|
||||||
state_head: 445404e394d21c39b855d7a0a672885e49756a00
|
state_head: 3bdf6c930123167d85f615cdca458598cc42e023
|
||||||
progress:
|
progress:
|
||||||
total_phases: 15
|
total_phases: 15
|
||||||
completed_phases: 8
|
completed_phases: 8
|
||||||
total_plans: 72
|
total_plans: 72
|
||||||
completed_plans: 71
|
completed_plans: 72
|
||||||
milestone_name: milestone
|
milestone_name: milestone
|
||||||
---
|
---
|
||||||
|
|
||||||
@@ -30,8 +30,8 @@ See: .planning/PROJECT.md (updated 2026-09-16)
|
|||||||
|
|
||||||
Phase: 10 (Admin Vue SPA) — EXECUTING
|
Phase: 10 (Admin Vue SPA) — EXECUTING
|
||||||
Plan: 5 of 5
|
Plan: 5 of 5
|
||||||
Status: Ready to execute
|
Status: Phase complete — ready for verification
|
||||||
Last activity: 2026-09-27 — Phase 10 plan 04 relation manager and shell polish completed
|
Last activity: 2026-09-27 — Phase 10 plan 05 unit tests, assembled acceptance and phase gate completed
|
||||||
|
|
||||||
Progress: [██████████] 100%
|
Progress: [██████████] 100%
|
||||||
|
|
||||||
@@ -124,6 +124,7 @@ Progress: [██████████] 100%
|
|||||||
| Phase 10 P02 | 50min | 3 tasks | 63 files |
|
| Phase 10 P02 | 50min | 3 tasks | 63 files |
|
||||||
| Phase 10 P03 | 23 min | 3 tasks | 64 files |
|
| Phase 10 P03 | 23 min | 3 tasks | 64 files |
|
||||||
| Phase 10 P04 | 21min | 2 tasks | 42 files |
|
| Phase 10 P04 | 21min | 2 tasks | 42 files |
|
||||||
|
| Phase 10 P05 | 53 min | 3 tasks | 76 files |
|
||||||
|
|
||||||
## Accumulated Context
|
## Accumulated Context
|
||||||
|
|
||||||
@@ -331,6 +332,10 @@ Recent decisions affecting current work:
|
|||||||
- [Phase 10]: Admin OpenAPI declares search, sort, dir, page and per_page on the linked and candidate relation routes
|
- [Phase 10]: Admin OpenAPI declares search, sort, dir, page and per_page on the linked and candidate relation routes
|
||||||
- [Phase 10]: Collapsed rail: Enter or ArrowDown opens the SectionFlyout and moves focus into it; click still navigates; expand button only for a manual collapse
|
- [Phase 10]: Collapsed rail: Enter or ArrowDown opens the SectionFlyout and moves focus into it; click still navigates; expand button only for a manual collapse
|
||||||
- [Phase 10]: logout(router) always clears user, navigation and settings and ends on the login route, even when POST /auth/logout fails
|
- [Phase 10]: logout(router) always clears user, navigation and settings and ends on the login route, even when POST /auth/logout fails
|
||||||
|
- [Phase 10]: Phase 10 gate allow-lists exactly the two pre-existing fonoteka parity failures by package and test name and refuses once either passes
|
||||||
|
- [Phase 10]: Field controls import components/form/control.ts; registry.ts re-exports it (breaks a registry/control import cycle)
|
||||||
|
- [Phase 10]: Tailwind skips admin/tests so test code never changes boardwalk/dist
|
||||||
|
- [Phase 10]: Framework tests use neutral acme names; the hygiene stage refuses application names in summercms.go admin, boardwalk, cabana and phrasebook
|
||||||
|
|
||||||
### Pending Todos
|
### Pending Todos
|
||||||
|
|
||||||
@@ -353,6 +358,6 @@ Items acknowledged and carried forward from previous milestone close:
|
|||||||
|
|
||||||
## Session Continuity
|
## Session Continuity
|
||||||
|
|
||||||
Last session: 2026-09-27T15:28:59.674Z
|
Last session: 2026-09-27T16:23:55.972Z
|
||||||
Stopped at: Completed 10-04-PLAN.md
|
Stopped at: Completed 10-05-PLAN.md
|
||||||
Resume file: None
|
Resume file: None
|
||||||
|
|||||||
Reference in New Issue
Block a user