docs(10-05): record plan 05 progress, decisions and ADMIN-06 in state, roadmap and requirements

This commit is contained in:
Jakub Zych
2026-09-27 18:24:07 +02:00
parent 3bdf6c9301
commit 473a454c29
3 changed files with 20 additions and 15 deletions

View File

@@ -112,7 +112,7 @@ Requirements for v1 (the Płytarium port). Each maps to roadmap phases. "User" b
- [ ] **ADMIN-03**: A relation-manager schema (search, link, unlink, manage/view lists) replaces the one `partial` field in Collections' editors tab
- [ ] **ADMIN-04**: Admin CRUD endpoints per controller expose extension hooks (listExtendQuery, formExtendQuery, formBeforeCreate, formBeforeUpdate, relationExtendManageQuery), and bulk delete runs each record's lifecycle hooks
- [ ] **ADMIN-05**: A settings model binds to a settings screen through the same schema pipeline (search_use_typesense)
- [ ] **ADMIN-06**: A minimal Vue 3 + TypeScript SPA renders login, permission-gated navigation, lists, forms and the relation manager for Albums, Artists, Collections, Genres and Styles using generated types
- [x] **ADMIN-06**: A minimal Vue 3 + TypeScript SPA renders login, permission-gated navigation, lists, forms and the relation manager for Albums, Artists, Collections, Genres and Styles using generated types
### Quality and cutover (QA)
@@ -224,7 +224,7 @@ Which phases cover which requirements. Updated during roadmap creation.
| ADMIN-03 | Phase 9 | Pending |
| ADMIN-04 | Phase 9 | Pending |
| ADMIN-05 | Phase 9 | Pending |
| ADMIN-06 | Phase 10 | Pending |
| ADMIN-06 | Phase 10 | Complete |
| QA-01 | Phase 2 | Complete |
| QA-02 | Phase 2 | Complete |
| QA-03 | Phase 2 | Complete |

View File

@@ -424,7 +424,7 @@ Plans:
3. The Collections form's relation manager lets an admin search, link and unlink an editor.
4. API calls in the SPA use TypeScript types generated from the OpenAPI document, with no hand-maintained duplicate type.
**Plans**: 4/5 plans executed
**Plans**: 5/5 plans executed
**UI hint**: yes
Plans:
@@ -442,7 +442,7 @@ Plans:
- [x] 10-04-PLAN.md — Relation manager with picker modal, and shell polish (flyout, collapse, user menu, breadcrumbs, dark mode)
**Wave 5** *(blocked on Wave 4 completion)*
- [ ] 10-05-PLAN.md — Unit tests last: Vitest and Go coverage, assembled acceptance, check-phase10.sh gate and security evidence
- [x] 10-05-PLAN.md — Unit tests last: Vitest and Go coverage, assembled acceptance, check-phase10.sh gate and security evidence
### Phase 11: Jobs, realtime and search infrastructure
@@ -547,7 +547,7 @@ Phases execute in numeric order: 1 → 2 → 3 → 4 → 5 → 6 → 7 → 8 →
| 7. User plugin and authentication | 8/8 | Complete | 2026-09-23 |
| 8. OAuth2.1 authorization server | 10/10 | Complete | 2026-09-23 |
| 9. Backend admin authentication and schema pipeline | 12/12 | In Progress| |
| 10. Admin Vue SPA | 4/5 | In Progress| |
| 10. Admin Vue SPA | 5/5 | In Progress| |
| 11. Jobs, realtime and search infrastructure | 0/TBD | Not started | - |
| 12. Płytarium API — Collections and Albums | 0/TBD | Not started | - |
| 13. Płytarium API — wishlist, notifications, CSV, credentials, public routes | 0/TBD | Not started | - |

View File

@@ -3,17 +3,17 @@ gsd_state_version: "1.0"
milestone: v1.0
current_phase: 10
current_phase_name: Admin Vue SPA
status: executing
stopped_at: Completed 10-04-PLAN.md
last_updated: "2026-09-27T15:28:59.994Z"
status: verifying
stopped_at: Completed 10-05-PLAN.md
last_updated: "2026-09-27T16:23:56.300Z"
last_activity: 2026-09-27
last_activity_desc: Phase 10 plan 04 relation manager and shell polish completed
state_head: 445404e394d21c39b855d7a0a672885e49756a00
last_activity_desc: Phase 10 plan 05 unit tests, assembled acceptance and phase gate completed
state_head: 3bdf6c930123167d85f615cdca458598cc42e023
progress:
total_phases: 15
completed_phases: 8
total_plans: 72
completed_plans: 71
completed_plans: 72
milestone_name: milestone
---
@@ -30,8 +30,8 @@ See: .planning/PROJECT.md (updated 2026-09-16)
Phase: 10 (Admin Vue SPA) — EXECUTING
Plan: 5 of 5
Status: Ready to execute
Last activity: 2026-09-27 — Phase 10 plan 04 relation manager and shell polish completed
Status: Phase complete — ready for verification
Last activity: 2026-09-27 — Phase 10 plan 05 unit tests, assembled acceptance and phase gate completed
Progress: [██████████] 100%
@@ -124,6 +124,7 @@ Progress: [██████████] 100%
| Phase 10 P02 | 50min | 3 tasks | 63 files |
| Phase 10 P03 | 23 min | 3 tasks | 64 files |
| Phase 10 P04 | 21min | 2 tasks | 42 files |
| Phase 10 P05 | 53 min | 3 tasks | 76 files |
## Accumulated Context
@@ -331,6 +332,10 @@ Recent decisions affecting current work:
- [Phase 10]: Admin OpenAPI declares search, sort, dir, page and per_page on the linked and candidate relation routes
- [Phase 10]: Collapsed rail: Enter or ArrowDown opens the SectionFlyout and moves focus into it; click still navigates; expand button only for a manual collapse
- [Phase 10]: logout(router) always clears user, navigation and settings and ends on the login route, even when POST /auth/logout fails
- [Phase 10]: Phase 10 gate allow-lists exactly the two pre-existing fonoteka parity failures by package and test name and refuses once either passes
- [Phase 10]: Field controls import components/form/control.ts; registry.ts re-exports it (breaks a registry/control import cycle)
- [Phase 10]: Tailwind skips admin/tests so test code never changes boardwalk/dist
- [Phase 10]: Framework tests use neutral acme names; the hygiene stage refuses application names in summercms.go admin, boardwalk, cabana and phrasebook
### Pending Todos
@@ -353,6 +358,6 @@ Items acknowledged and carried forward from previous milestone close:
## Session Continuity
Last session: 2026-09-27T15:28:59.674Z
Stopped at: Completed 10-04-PLAN.md
Last session: 2026-09-27T16:23:55.972Z
Stopped at: Completed 10-05-PLAN.md
Resume file: None