docs(12.1-05): close plan 05 with SUMMARY after the executor died before writing it

This commit is contained in:
Jakub Zych
2026-10-05 16:51:31 +02:00
parent 93f0171e9c
commit 4e4ce40dbb
5 changed files with 333 additions and 15 deletions

View File

@@ -4,11 +4,11 @@ milestone: v1.0
current_phase: "12.1"
current_phase_name: User plugin admin screens
status: executing
stopped_at: Completed 12.1-04-PLAN.md
last_updated: "2026-10-05T12:10:04.406Z"
last_activity: 2026-10-04
last_activity_desc: Phase 12.1 execution started
state_head: 3f4a01ddf87da898d7a2a9acde9b06af880eb4b4
stopped_at: Completed 12.1-05-PLAN.md
last_updated: "2026-10-05T14:49:32.883Z"
last_activity: 2026-10-05
last_activity_desc: Plan 12.1-05 closed out (SUMMARY.md); awaiting phase verification
state_head: 93f0171e9c0eb798a61d5d71082873d1b3e8c4c6
progress:
total_phases: 22
completed_phases: 11
@@ -30,10 +30,10 @@ See: .planning/PROJECT.md (updated 2026-09-16)
Phase: 12.1 (User plugin admin screens) — EXECUTING
Plan: 5 of 5
Status: Ready to execute
Last activity: 2026-10-04 — Phase 12.1 execution started
Status: All plans summarized; awaiting phase verification and human UAT
Last activity: 2026-10-05 — Plan 12.1-05 SUMMARY closed out
Progress: [██████░░░░] 60%
Progress: [██████████] 100%
## Performance Metrics
@@ -176,6 +176,7 @@ Progress: [██████░░░░] 60%
| Phase 12.1 P02 | 12h 43m | 6 tasks | 77 files |
| Phase 12.1 P03 | 46min | 4 tasks | 40 files |
| Phase 12.1 P04 | 32min | 4 tasks | 35 files |
| Phase 12.1 P05 | 103min | 3 tasks | 56 files |
## Accumulated Context
@@ -584,9 +585,7 @@ Recent decisions affecting current work:
- Phase 9 (admin schema pipeline / relation manager) is the least-precedented design surface in the research — plan with `--research-phase`.
- Phase 11 (River dual-driver split) is documented but unverified against a real build — plan with `--research-phase` and budget a timed-latency test.
- Phase 8 UI gate: scripts/check-phase8-ui.mjs --final-gate's real Playwright browser matrix (32 UI-SPEC scenarios) is unimplemented (deliberate fatal() at check-phase8-ui.mjs:458, never authored by 08-05); stage_ui_harness must keep failing closed until a Playwright spec is authored. User approved Phase 8 closure on 2026-09-24 with this gap carried forward -- see 08-10-SUMMARY.md and .planning/phases/08-oauth2-1-authorization-server/deferred-items.md.
- Push summercms.go master and tag v0.1.3 to origin (tag is local on df5cace by the user's tag-local choice); the sm-user-plugin push of plan 12.1-05 Task 3 waits until git ls-remote --tags origin v0.1.3 lists the tag
- fonoteka.go plugins/golem15/fonoteka: TestPhase09SecurityRoutes and TestPhase10ControllerCopy fail against framework v0.1.3 (fixed route and message-key lists lack the Phase 12.1 additions); see .planning/phases/12.1-user-plugin-admin-screens/deferred-items.md
- fonoteka.go: four more application tests pin lists the user plugin's admin work changes (TestAdminMetadataFiltering, TestHiddenNeverMarshals, parity TestMigrateSeedsCanonicalGenres and TestRollbackLastIsolatesFonoteka) and TestSchemaMatchesPHPSnapshot needs the frontend-permissions allow-list entry; plan 12.1-04 owns them (deferred-items.md)
- pending: push sm-user-plugin — 12.1-05 Task 3 condition (c) failed (`git ls-remote --tags origin v0.1.3` empty). Push summercms.go master and annotated tag v0.1.3 (local on df5cace) first, then the plugin, then fonoteka.go. Recorded in 12.1-05-SUMMARY.md.
### Quick Tasks Completed