diff --git a/.planning/ROADMAP.md b/.planning/ROADMAP.md index dbeba62..959e48a 100644 --- a/.planning/ROADMAP.md +++ b/.planning/ROADMAP.md @@ -586,7 +586,7 @@ Plans: **Context:** `.planning/phases/11.2-ready-to-share-summercms-io-website-and-newsletter-plugin/11.2-CONTEXT.md` (D-01 to D-05, D-07, D-09 and D-12 still apply; see its supersession note) -**Plans:** 2/3 plans executed +**Plans:** 3/3 plans executed Plans: **Wave 1** @@ -596,7 +596,7 @@ Plans: - [x] 11.2-02-PLAN.md — Framework PG15 verification and site_url/site_label (D-25, D-41, D-46), v0.1.0 tag checkpoint (D-42), sm-summercmsio-plugin static serving at / and /docs (D-07, D-47), sm-summercmsio-app wiring, build and smoke scripts, link and terminal checks (SC3, D-40), DEPLOY.md with nginx, supervisor and rollback **Wave 3** *(blocked on Wave 2 completion)* -- [ ] 11.2-03-PLAN.md — Unit tests last: plugin rule table at 90%+ coverage, site_url/site_label branches, terminal-check helpers, check-phase11.2.sh gate, validated VALIDATION.md +- [x] 11.2-03-PLAN.md — Unit tests last: plugin rule table at 90%+ coverage, site_url/site_label branches, terminal-check helpers, check-phase11.2.sh gate, validated VALIDATION.md ### Phase 11.3: Newsletter plugin and signup on summercms.io (INSERTED) @@ -707,7 +707,7 @@ Phases execute in numeric order: 1 → 2 → 3 → 4 → 5 → 6 → 7 → 8 → | 10. Admin Vue SPA | 5/5 | Complete | 2026-09-27 | | 11. Jobs, realtime and search infrastructure | 8/8 | In Progress| | | 11.1. SummerCMS documentation for humans and AI agents | 7/7 | In Progress| | -| 11.2. summercms.io Alpha 0.1 landing page on SummerCMS | 2/3 | In Progress| | +| 11.2. summercms.io Alpha 0.1 landing page on SummerCMS | 3/3 | In Progress| | | 11.3. Newsletter plugin and signup on summercms.io | 0/TBD | Not started | - | | 12. Płytarium API — Collections and Albums | 0/TBD | Not started | - | | 13. Płytarium API — wishlist, notifications, CSV, credentials, public routes | 0/TBD | Not started | - | diff --git a/.planning/STATE.md b/.planning/STATE.md index fa5c0ae..151fff7 100644 --- a/.planning/STATE.md +++ b/.planning/STATE.md @@ -3,17 +3,17 @@ gsd_state_version: "1.0" milestone: v1.0 current_phase: "11.2" current_phase_name: summercms.io Alpha 0.1 landing page on SummerCMS (INSERTED) -status: executing -stopped_at: Completed 11.2-02-PLAN.md -last_updated: "2026-10-01T14:24:15.811Z" +status: verifying +stopped_at: Completed 11.2-03-PLAN.md +last_updated: "2026-10-01T14:40:47.065Z" last_activity: 2026-10-01 last_activity_desc: Phase 11.2 execution started -state_head: 29231efab23b5169a584282f323a9f3b1985381c +state_head: c07db9a321d44d655179cf2e50a00afe0ababdb3 progress: total_phases: 20 completed_phases: 9 total_plans: 96 - completed_plans: 95 + completed_plans: 96 milestone_name: milestone --- @@ -30,7 +30,7 @@ See: .planning/PROJECT.md (updated 2026-09-16) Phase: 11.2 (summercms.io Alpha 0.1 landing page on SummerCMS (INSERTED)) — EXECUTING Plan: 3 of 3 -Status: Ready to execute +Status: Phase complete — ready for verification Last activity: 2026-10-01 — Phase 11.2 execution started Progress: [██████░░░░] 60% @@ -150,6 +150,7 @@ Progress: [██████░░░░] 60% | Phase 11.1 P07 | 33 min | 5 tasks | 64 files | | Phase 11.2 P01 | 12 min | 3 tasks | 35 files | | Phase 11.2 P02 | 22min | 5 tasks | 36 files | +| Phase 11.2 P03 | 13 min | 3 tasks | 11 files | ## Accumulated Context @@ -423,6 +424,8 @@ Recent decisions affecting current work: - [Phase 11.2]: 11.2-01: Copy button falls back to a hidden textarea + execCommand when the Clipboard API is missing; a failed copy leaves the label unchanged - [Phase 11.2]: 11.2-02: D-42 resolved as defer-tag; no v0.1.0 tag in summercms.go, release path proven on a scratch clone with a local tag, and creating + pushing v0.1.0 and pushing master is a DEPLOY.md launch step - [Phase 11.2]: 11.2-02: the terminal check's clone override clones into the page's directory (git clone summercms) so the page's cd summercms works with a local path +- [Phase 11.2]: 11.2-03: the gate's --built stage builds in release mode only when the framework checkout build.sh uses has v0.1.0, else a dev build +- [Phase 11.2]: 11.2-03: plugin route coexistence is tested with the plugin's real patterns from surf.BuildRouter(...).Routes() beside cabana's admin patterns on one ServeMux ### Pending Todos @@ -454,6 +457,6 @@ Items acknowledged and carried forward from previous milestone close: ## Session Continuity -Last session: 2026-10-01T14:24:14.077Z -Stopped at: Completed 11.2-02-PLAN.md +Last session: 2026-10-01T14:40:46.600Z +Stopped at: Completed 11.2-03-PLAN.md Resume file: None diff --git a/.planning/state.json b/.planning/state.json index c99cdb3..5294399 100644 --- a/.planning/state.json +++ b/.planning/state.json @@ -96,8 +96,8 @@ ], "next": { "command": "/gsd:progress --next", - "label": "Advance to the next step", - "reason": "Phase 11.2 of 20 · executing" + "label": "Advance to the next step (verify)", + "reason": "Phase 11.2 of 20 · ready to verify" }, - "updated_at": "2026-10-01T14:24:06.573Z" + "updated_at": "2026-10-01T14:40:43.793Z" }