docs(19.1-05): record plan progress after chatvideo SUMMARY

Co-authored-by: Cursor <cursoragent@cursor.com>
This commit is contained in:
Jakub Zych
2026-10-18 14:02:49 +02:00
parent 782a6720bf
commit 5ccf726e8a
3 changed files with 16 additions and 11 deletions

View File

@@ -1235,7 +1235,7 @@ Plans:
3. Already met: fonoteka's PHP userfriends tree equals Wavepath 182b514; fonoteka.go has no port and Wavepath's copy is the single source. 3. Already met: fonoteka's PHP userfriends tree equals Wavepath 182b514; fonoteka.go has no port and Wavepath's copy is the single source.
4. The new code has unit tests, delivered in the phase's last plan. 4. The new code has unit tests, delivered in the phase's last plan.
**Plans:** 3/6 plans executed **Plans:** 4/6 plans executed
Plans: Plans:
**Wave 1** **Wave 1**
@@ -1245,7 +1245,7 @@ Plans:
**Wave 2** *(D-17 gate for forum; chatvideo after chat)* **Wave 2** *(D-17 gate for forum; chatvideo after chat)*
- [ ] 19.1-02-PLAN.md — forum repo after D-17 Render/Purify, DeleteContext, GFM/XSS HTTP tracer - [ ] 19.1-02-PLAN.md — forum repo after D-17 Render/Purify, DeleteContext, GFM/XSS HTTP tracer
- [ ] 19.1-05-PLAN.md — LiveKit v2 note, then chatvideo sessions, authorizer, generic reconciler - [x] 19.1-05-PLAN.md — LiveKit v2 note, then chatvideo sessions, authorizer, generic reconciler
**Wave 3** *(blocked on Waves 1–2)* **Wave 3** *(blocked on Waves 1–2)*
- [ ] 19.1-06-PLAN.md — PHP method maps, goldens, scripts/check-phase19.1.sh - [ ] 19.1-06-PLAN.md — PHP method maps, goldens, scripts/check-phase19.1.sh
@@ -1434,7 +1434,7 @@ Phases execute in numeric order: 1 → 2 → 3 → 4 → 5 → 6 → 7 → 8 →
| 18. Payment Gateway | 8/8 | Complete | 2026-10-14 | | 18. Payment Gateway | 8/8 | Complete | 2026-10-14 |
| 18.1. Payment Gateway Subscriptions | 9/9 | Complete | 2026-10-16 | | 18.1. Payment Gateway Subscriptions | 9/9 | Complete | 2026-10-16 |
| 19. Chat and ChatChannels | 7/7 | Complete | 2026-10-17 | | 19. Chat and ChatChannels | 7/7 | Complete | 2026-10-17 |
| 19.1. Chat satellites | 3/6 | In Progress| | | 19.1. Chat satellites | 4/6 | In Progress| |
| 19.2. Chat polish against WavePath clients | 0/TBD | Not started | - | | 19.2. Chat polish against WavePath clients | 0/TBD | Not started | - |
| 19.3. Framework transport and infrastructure for WavePath | 6/6 | In Progress| | | 19.3. Framework transport and infrastructure for WavePath | 6/6 | In Progress| |
| 19.4. OIDC provider on wristband | 0/TBD | Not started | - | | 19.4. OIDC provider on wristband | 0/TBD | Not started | - |

View File

@@ -4,16 +4,16 @@ milestone: v1.0
current_phase: "19.1" current_phase: "19.1"
current_phase_name: Chat satellites current_phase_name: Chat satellites
status: executing status: executing
stopped_at: Completed 19.1-04-PLAN.md stopped_at: Completed 19.1-05-PLAN.md
last_updated: "2026-10-18T11:50:07.430Z" last_updated: "2026-10-18T12:02:40.895Z"
last_activity: 2026-10-18 last_activity: 2026-10-18
last_activity_desc: Phase 19.1 execution started last_activity_desc: Phase 19.1 execution started
state_head: 0d3ba6517b093c53593516fde5520ff569024071 state_head: 782a6720bf2bcdce1dcaa3c1c9a98c69f1d44998
progress: progress:
total_phases: 41 total_phases: 41
completed_phases: 33 completed_phases: 33
total_plans: 204 total_plans: 204
completed_plans: 201 completed_plans: 202
gsd_state_version: "1.0" gsd_state_version: "1.0"
milestone_name: milestone milestone_name: milestone
--- ---
@@ -30,7 +30,7 @@ See: .planning/PROJECT.md (updated 2026-10-12)
## Current Position ## Current Position
Phase: 19.1 (Chat satellites) — EXECUTING Phase: 19.1 (Chat satellites) — EXECUTING
Plan: 3 of 6 Plan: 4 of 6
Status: Ready to execute Status: Ready to execute
Last activity: 2026-10-18 — Phase 19.1 execution started Last activity: 2026-10-18 — Phase 19.1 execution started
@@ -254,6 +254,7 @@ Progress: [████████░░] 80%
| Phase 19.1 P01 | 12min | 3 tasks | 37 files | | Phase 19.1 P01 | 12min | 3 tasks | 37 files |
| Phase 19.1 P19.1-03 | 7 min | 3 tasks | 32 files | | Phase 19.1 P19.1-03 | 7 min | 3 tasks | 32 files |
| Phase 19.1-chat-satellites P19.1-04 | 11 | 4 tasks | 35 files | | Phase 19.1-chat-satellites P19.1-04 | 11 | 4 tasks | 35 files |
| Phase 19.1-chat-satellites P19.1-05 | 10min | 4 tasks | 37 files |
## Accumulated Context ## Accumulated Context
@@ -858,6 +859,10 @@ Recent decisions affecting current work:
- [Phase 19.1-chat-satellites]: Task 2 reply verbatim: proceed - [Phase 19.1-chat-satellites]: Task 2 reply verbatim: proceed
- [Phase 19.1-chat-satellites]: Locked D-02 baseline id 202610180001_create_golem15_herald_baseline and D-05 prefix /_herald/api/v1; remote policy follows plan 01 proceed-and-push - [Phase 19.1-chat-satellites]: Locked D-02 baseline id 202610180001_create_golem15_herald_baseline and D-05 prefix /_herald/api/v1; remote policy follows plan 01 proceed-and-push
- [Phase 19.1-chat-satellites]: tea repos create --owner golem15 --name sm-herald-plugin succeeded; main pushed at 46af07a (never force). summercms.go was not pushed. - [Phase 19.1-chat-satellites]: tea repos create --owner golem15 --name sm-herald-plugin succeeded; main pushed at 46af07a (never force). summercms.go was not pushed.
- [Phase 19.1]: Task 2 reply verbatim: proceed — Human locked D-02 baseline id and D-05 prefix; Task 2 was not re-asked.
- [Phase 19.1]: Locked D-02 baseline id 202610180001_create_golem15_chatvideo_baseline and D-05 prefix /_chatvideo/api/v1; remote policy follows plan 01 proceed-and-push — These names land in adopting apps and published clients.
- [Phase 19.1]: tea repos create --owner golem15 --name sm-chatvideo-plugin succeeded; main pushed at 38179b5 (never force). summercms.go was not pushed. — Remote policy is proceed-and-push after Task 4 green.
- [Phase 19.1]: After APIs exist, execute should run the security-review agent (CONTEXT). This execute did not spawn it. — CONTEXT discretion; planner and execute both refuse to spawn the reviewer.
### Pending Todos ### Pending Todos
@@ -941,6 +946,6 @@ Items acknowledged and carried forward from previous milestone close:
## Session Continuity ## Session Continuity
Last session: 2026-10-18T11:50:06.707Z Last session: 2026-10-18T12:02:32.177Z
Stopped at: Completed 19.1-04-PLAN.md Stopped at: Completed 19.1-05-PLAN.md
Resume file: None Resume file: None

View File

@@ -214,5 +214,5 @@
"label": "Advance to the next step", "label": "Advance to the next step",
"reason": "Phase 19.1 of 41 · executing" "reason": "Phase 19.1 of 41 · executing"
}, },
"updated_at": "2026-10-18T11:50:01.837Z" "updated_at": "2026-10-18T12:02:25.797Z"
} }