docs(12.2): record BM UAT approval after v0.1.2 fixes
Browser checks on sm-bm-app passed: datetime popover time, discard confirm, and list date formatting. Phase 12.2 UAT is complete. Co-authored-by: Cursor <cursoragent@cursor.com>
This commit is contained in:
@@ -1,32 +1,32 @@
|
||||
---
|
||||
status: testing
|
||||
status: complete
|
||||
phase: 12.2-admin-form-fields-date-file-upload-relation-editing-with-def
|
||||
source: [12.2-VERIFICATION.md]
|
||||
started: 2026-10-02T21:15:00Z
|
||||
updated: 2026-10-02T21:30:00Z
|
||||
updated: 2026-10-03T03:56:00Z
|
||||
---
|
||||
|
||||
## Current Test
|
||||
|
||||
number: 1
|
||||
name: Calendar keyboard and visual fit (UI-SPEC backstop + Direction C)
|
||||
number: 3
|
||||
name: Child create/edit/delete and pivot edit on an unsaved parent
|
||||
expected: |
|
||||
Esc returns focus to the datepicker trigger; a disabled day cannot be selected; the popover fits the existing control height and calendar cell size
|
||||
awaiting: user response
|
||||
Create-screen relation managers with deferrable: true work at record id 0; the pending note shows; the first parent save commits children, pivots and files
|
||||
awaiting: none
|
||||
|
||||
## Tests
|
||||
|
||||
### 1. Calendar keyboard and visual fit (UI-SPEC backstop + Direction C)
|
||||
expected: Esc returns focus to the datepicker trigger; a disabled day cannot be selected; the popover fits the existing control height and calendar cell size
|
||||
result: [pending — will test on sm-bm-app after datepicker is wired]
|
||||
result: [passed] BM /backend 2026-10-03. v0.1.2 follow-up: datetime popover now has a time field; timezone has padding. User approved.
|
||||
|
||||
### 2. Drag reorder and upload progress on a fileupload field
|
||||
expected: Tiles and rows show queued/uploading/done; Save stays disabled while an upload is in flight; drag or keyboard reorder keeps the latest order
|
||||
result: [pending — will test on sm-bm-app materials after fileupload is wired]
|
||||
result: [passed] BM /backend 2026-10-03. User: everything else is fine.
|
||||
|
||||
### 3. Child create/edit/delete and pivot edit on an unsaved parent
|
||||
expected: Create-screen relation managers with deferrable: true work at record id 0; the pending note shows; the first parent save commits children, pivots and files
|
||||
result: [pending — will test on sm-bm-app course readings/sessions after relation-manager children are wired]
|
||||
result: [passed] BM /backend 2026-10-03. v0.1.2 follow-up: unsaved-changes confirm is responsive; omitted list date columns format as datetime/date/time. User approved.
|
||||
|
||||
### 4. Create and push the v0.1.1 tag (12.2-05 Task 4)
|
||||
expected: git tag -a v0.1.1 on the phase head, then git push origin master v0.1.1; downstream TODO items for date, file upload and related-record editing can resolve on that tag
|
||||
@@ -35,9 +35,9 @@ result: [passed] tagged v0.1.1 at 5c38d96 and pushed origin master v0.1.1; BM ha
|
||||
## Summary
|
||||
|
||||
total: 4
|
||||
passed: 1
|
||||
passed: 4
|
||||
issues: 0
|
||||
pending: 3
|
||||
pending: 0
|
||||
skipped: 0
|
||||
blocked: 0
|
||||
|
||||
|
||||
@@ -1,30 +1,30 @@
|
||||
---
|
||||
phase: 12.2-admin-form-fields-date-file-upload-relation-editing-with-def
|
||||
verified: 2026-10-02T21:15:00Z
|
||||
status: human_needed
|
||||
score: 5/5 roadmap success criteria verified; 4 UI-SPEC backstops verified by SPA tests; browser UAT and the v0.1.1 tag remain human
|
||||
status: passed
|
||||
score: 5/5 roadmap success criteria verified; 4 UI-SPEC backstops verified by SPA tests; BM browser UAT approved 2026-10-03
|
||||
overrides_applied: 0
|
||||
human_verification:
|
||||
- test: "Calendar keyboard and visual fit (UI-SPEC backstop + Direction C)"
|
||||
expected: "Esc returns focus to the datepicker trigger; a disabled day cannot be selected; the popover fits the existing control height and calendar cell size"
|
||||
why_human: "Unit tests cover Esc and disabled days; visual fit against Direction C needs a browser"
|
||||
why_human: "Approved on BM /backend 2026-10-03 after the v0.1.2 datetime popover time field."
|
||||
- test: "Drag reorder and upload progress on a fileupload field"
|
||||
expected: "Tiles and rows show queued/uploading/done; Save stays disabled while an upload is in flight; drag or keyboard reorder keeps the latest order"
|
||||
why_human: "XHR progress and pointer drag are mocked in vitest; live feel is a human check"
|
||||
why_human: "Approved on BM /backend 2026-10-03."
|
||||
- test: "Child create/edit/delete and pivot edit on an unsaved parent"
|
||||
expected: "Create-screen relation managers with deferrable: true work at record id 0; the pending note shows; the first parent save commits children, pivots and files"
|
||||
why_human: "The deferred smoke test is mocked; the assembled admin UI against a real plugin is a human check"
|
||||
why_human: "Approved on BM /backend 2026-10-03 after the v0.1.2 confirm-dialog and list datetime fixes."
|
||||
- test: "Create and push the v0.1.1 tag (12.2-05 Task 4)"
|
||||
expected: "git tag -a v0.1.1 on the phase head, then git push origin master v0.1.1; downstream TODO items for date, file upload and related-record editing can resolve on that tag"
|
||||
why_human: "Done: tagged and pushed 2026-10-02. Remaining human items are BM browser UAT after the plugin wires the new fields."
|
||||
why_human: "Done: tagged and pushed 2026-10-02. BM UAT approved 2026-10-03."
|
||||
---
|
||||
|
||||
# Phase 12.2: Admin form fields Verification Report
|
||||
|
||||
**Phase Goal:** A plugin's admin forms cover date/datetime, file upload, and related-record create/edit/delete with Winter-like deferred binding.
|
||||
**Verified:** 2026-10-02T21:15:00Z
|
||||
**Status:** human_needed
|
||||
**Re-verification:** No — first verification after the review-fix commit.
|
||||
**Status:** passed
|
||||
**Re-verification:** BM browser UAT approved 2026-10-03 (v0.1.2 follow-up: datetime popover time, unsaved confirm, inferred list date types).
|
||||
|
||||
All five plans have SUMMARYs. The prior Codex run already passed the nine-stage `scripts/check-phase12.2.sh` suite, Nyquist validation, and the 41-threat security ledger (`12.2-SECURITY.md` `threats_open: 0`). This pass closed the seven code-review findings instead of re-running that 137-file review.
|
||||
|
||||
@@ -66,6 +66,6 @@ All five plans have SUMMARYs. The prior Codex run already passed the nine-stage
|
||||
|
||||
## Gaps
|
||||
|
||||
None in automated must-haves. Remaining work is the four human items above.
|
||||
None. Human UAT 1–4 passed on BM /backend 2026-10-03.
|
||||
|
||||
_Verifier: the agent (inline, targeted; did not re-run the nine-stage gate or 137-file review)_
|
||||
|
||||