docs(09-12): record the phase 9 acceptance evidence
- Security review names the test that fails if each high control is removed. - Validation rows now point at the phase gate commands. - Roadmap shows 12/12 plans executed.
This commit is contained in:
@@ -0,0 +1,184 @@
|
||||
---
|
||||
phase: 09-backend-admin-authentication-and-schema-pipeline
|
||||
plan: 12
|
||||
subsystem: admin
|
||||
tags: [security, postgres, openapi, authorization, acceptance]
|
||||
|
||||
requires:
|
||||
- phase: 09-backend-admin-authentication-and-schema-pipeline
|
||||
provides: Backend guard, controllers, schemas, CRUD, relations, permissions, and settings
|
||||
provides:
|
||||
- Route-derived Phase 9 security matrix across guard, cabana, and the assembled app
|
||||
- Fresh PostgreSQL admin migration rollback that preserves other histories
|
||||
- Fail-closed phase gate and committed admin OpenAPI contract
|
||||
affects: [phase-10-spa, admin-api]
|
||||
|
||||
actuals:
|
||||
tokens: 18000
|
||||
tasks: 3
|
||||
commits: 4
|
||||
|
||||
tech-stack:
|
||||
added: []
|
||||
patterns:
|
||||
- "The mounted admin route table is the permission matrix; a new handler without the backend guard fails the gate"
|
||||
- "OpenAPI admin paths are generated from cabana annotations and checked against that same route list"
|
||||
- "PostgreSQL stages fail when a TestPhase09 test is skipped or matches nothing"
|
||||
|
||||
key-files:
|
||||
created:
|
||||
- bouncer/backend_guard_test.go
|
||||
- cabana/security_coverage_test.go
|
||||
- cabana/admin_openapi.go
|
||||
- cabana/phase09_contract_test.go
|
||||
- scripts/check-phase9.sh
|
||||
- ../fonoteka.go/plugins/golem15/fonoteka/admin_phase09_security_test.go
|
||||
- ../fonoteka.go/plugins/golem15/fonoteka/admin_phase09_e2e_test.go
|
||||
- .planning/phases/09-backend-admin-authentication-and-schema-pipeline/09-SECURITY-REVIEW.md
|
||||
modified:
|
||||
- lagoon/backend_admin_migrations_test.go
|
||||
- ../fonoteka.go/scripts/check-openapi.sh
|
||||
- ../fonoteka.go/docs/openapi.json
|
||||
- ../fonoteka.go/plugins/golem15/fonoteka/controllers/genre_controller.go
|
||||
- .planning/phases/09-backend-admin-authentication-and-schema-pipeline/09-VALIDATION.md
|
||||
|
||||
key-decisions:
|
||||
- "Admin OpenAPI annotations live in cabana/admin_openapi.go so swag can see them; TestPhase09PermissionMatrix keeps that list equal to service.mount"
|
||||
- "Migration rollback is proven on a dedicated database. The shared assembled test database is not rolled back"
|
||||
|
||||
patterns-established:
|
||||
- "scripts/check-phase9.sh is the only phase acceptance command"
|
||||
|
||||
requirements-completed: [AUTH-08, ADMIN-01, ADMIN-02, ADMIN-03, ADMIN-04, ADMIN-05]
|
||||
|
||||
coverage:
|
||||
- id: D1
|
||||
description: "Frontend and backend tokens cannot cross guards, secrets, refresh, blacklist, or password-reset cutoff."
|
||||
requirement: AUTH-08
|
||||
verification:
|
||||
- kind: unit
|
||||
ref: bouncer/backend_guard_test.go#TestPhase09GuardIsolation
|
||||
status: pass
|
||||
human_judgment: false
|
||||
- id: D2
|
||||
description: "Every mounted admin route is inventoried, protected routes carry the backend guard, and denial happens before handler work."
|
||||
requirement: ADMIN-02
|
||||
verification:
|
||||
- kind: unit
|
||||
ref: cabana/security_coverage_test.go#TestPhase09PermissionMatrix
|
||||
status: pass
|
||||
- kind: integration
|
||||
ref: plugins/golem15/fonoteka/admin_phase09_security_test.go#TestPhase09SecurityRoutes
|
||||
status: pass
|
||||
human_judgment: false
|
||||
- id: D3
|
||||
description: "Mass assignment, identifier injection, pivot forgery, auth-log redaction, and hook rollback fail closed."
|
||||
requirement: ADMIN-04
|
||||
verification:
|
||||
- kind: integration
|
||||
ref: cabana/security_coverage_test.go#TestPhase09SecurityCoverage
|
||||
status: pass
|
||||
human_judgment: false
|
||||
- id: D4
|
||||
description: "Fresh PostgreSQL migration, rollback, and re-migrate keep framework and plugin histories independent and reseed roles."
|
||||
requirement: AUTH-08
|
||||
verification:
|
||||
- kind: integration
|
||||
ref: lagoon/backend_admin_migrations_test.go#TestPhase09MigrationsFreshRollback
|
||||
status: pass
|
||||
human_judgment: false
|
||||
- id: D5
|
||||
description: "Assembled acceptance covers login replay, five controllers, settings, relations, locale, empty/single/adjacent pages, and concurrent reads."
|
||||
requirement: ADMIN-01
|
||||
verification:
|
||||
- kind: e2e
|
||||
ref: plugins/golem15/fonoteka/admin_phase09_e2e_test.go#TestPhase09AssembledAcceptance
|
||||
status: pass
|
||||
human_judgment: false
|
||||
- id: D6
|
||||
description: "Committed OpenAPI lists every D-09 route with 401 responses and BackendBearer on protected operations."
|
||||
requirement: ADMIN-05
|
||||
verification:
|
||||
- kind: unit
|
||||
ref: cabana/phase09_contract_test.go#TestPhase09ContractInventory
|
||||
status: pass
|
||||
human_judgment: false
|
||||
|
||||
duration: 3h
|
||||
completed: 2026-09-27
|
||||
status: complete
|
||||
---
|
||||
|
||||
# Phase 9 Plan 12: Security, PostgreSQL, OpenAPI, and Acceptance Summary
|
||||
|
||||
**The admin surface now has one fail-closed gate for guard isolation, route permissions, real PostgreSQL, and the committed OpenAPI contract.**
|
||||
|
||||
## Performance
|
||||
|
||||
- **Duration:** 3h
|
||||
- **Started:** 2026-09-27T00:30:00+02:00
|
||||
- **Completed:** 2026-09-27T03:05:00+02:00
|
||||
- **Tasks:** 3
|
||||
- **Files modified:** 14
|
||||
|
||||
## Accomplishments
|
||||
|
||||
- Added `TestPhase09GuardIsolation`, `TestPhase09PermissionMatrix`, and `TestPhase09SecurityCoverage`.
|
||||
- Added assembled route and denial tests plus a PostgreSQL journey across the five admin controllers, settings, and the editors relation.
|
||||
- Added `scripts/check-phase9.sh` with self-test, security, postgres, openapi, and evidence stages.
|
||||
- Regenerated `fonoteka.go/docs/openapi.json` from the public genre route and the cabana admin annotations.
|
||||
- Recorded threat evidence in `09-SECURITY-REVIEW.md` and replaced the pending validation rows.
|
||||
|
||||
## Task Commits
|
||||
|
||||
1. **Task 1: Build a non-bypassable Phase 9 security matrix** - `30bfd2d` (summercms.go), `336a90b` (fonoteka.go)
|
||||
2. **Task 2: Gate all routes, PostgreSQL behavior, and committed OpenAPI** - `4392550` (summercms.go), `feaca6b` (fonoteka.go)
|
||||
3. **Task 3: Record independent threat evidence and finalize Nyquist mappings** - docs commit on summercms.go
|
||||
|
||||
## Files Created/Modified
|
||||
|
||||
- `bouncer/backend_guard_test.go` - cross-guard token matrix
|
||||
- `cabana/security_coverage_test.go` - mounted route inventory and adversarial fixtures
|
||||
- `cabana/admin_openapi.go` - swag annotations for every D-09 route
|
||||
- `cabana/phase09_contract_test.go` - committed OpenAPI inventory
|
||||
- `scripts/check-phase9.sh` - fail-closed phase gate
|
||||
- `lagoon/backend_admin_migrations_test.go` - fresh migrate/rollback/reseed
|
||||
- `fonoteka.go` `admin_phase09_security_test.go`, `admin_phase09_e2e_test.go`, `docs/openapi.json`, `scripts/check-openapi.sh`
|
||||
|
||||
## Decisions Made
|
||||
|
||||
- Swag documents exported functions in `cabana/admin_openapi.go`. The mount test fails if that list and `service.mount` disagree.
|
||||
- Rollback uses a dedicated database so the shared assembled test database stays intact for the rest of the package.
|
||||
|
||||
## Deviations from Plan
|
||||
|
||||
### [Rule 3 - Blocking] TDD tests passed on the first run
|
||||
|
||||
**Found during:** Task 1
|
||||
**Issue:** The guard, permission order, projection, and migration behavior already existed from plans 09-01 through 09-11. A new assertion written against that behavior passed immediately, so there was no honest RED commit.
|
||||
**Fix:** Committed the new tests as `test(09-12)` once they passed. The gate still fails if a later change removes the control.
|
||||
**Files modified:** `bouncer/backend_guard_test.go`, `cabana/security_coverage_test.go`, `lagoon/backend_admin_migrations_test.go`
|
||||
**Verification:** `scripts/check-phase9.sh --evidence`
|
||||
**Commit:** `30bfd2d`
|
||||
|
||||
**Total deviations:** 1
|
||||
**Impact:** No production control was weakened. The new tests are the regression net the plan asked for.
|
||||
|
||||
## Issues Encountered
|
||||
|
||||
None.
|
||||
|
||||
## User Setup Required
|
||||
|
||||
None.
|
||||
|
||||
## Next Phase Readiness
|
||||
|
||||
Plan 09-12 is executed. Phase 9 still needs its verification report before the roadmap phase checkbox can close.
|
||||
|
||||
## Self-Check: PASSED
|
||||
|
||||
- `bouncer/backend_guard_test.go` exists
|
||||
- `scripts/check-phase9.sh` exists
|
||||
- `09-SECURITY-REVIEW.md` exists
|
||||
- Commits `30bfd2d`, `336a90b`, `4392550`, and `feaca6b` are present
|
||||
Reference in New Issue
Block a user