docs(16.2): re-verify after gap closure 16.2-07 and UAT; phase complete

16.2-VERIFICATION.md passed 14/14: the five human items are resolved by the
16.2-07 gate log and the UAT re-run on v0.1.20 (16.2-UAT.md 5/5). covered_files
adds 16.2-07 PLAN/SUMMARY and openapi_conformance_test.go; digest recomputed
with verification.fingerprint. Re-verified by hand because msd-core 1.14.0
re-stales a report after gap closure and its verifier ignores passed UAT.
STATE points at 16.3 (phase.complete picked 11, an executed phase that is
only stale).
This commit is contained in:
2026-10-10 23:39:54 +02:00
parent ed8210132e
commit a04ba35271
4 changed files with 67 additions and 46 deletions

View File

@@ -1,19 +1,20 @@
---
msd_state_version: "1.0"
milestone: v1.0
current_phase: "16.2"
current_phase_name: Plugin-provided field types and the Blog Editor formwidget (INSERTED)
status: executing
stopped_at: Completed 16.2-07-PLAN.md
last_updated: "2026-10-10T19:05:40.959Z"
current_phase: "16.3"
current_phase_name: Backend admin personal API tokens with scopes
status: planning
stopped_at: "Phase 16.2 complete (re-verified after 16.2-07, UAT 5/5); Phase 16.3 ready to plan"
last_updated: "2026-10-10T21:39:28.413Z"
last_activity: 2026-10-10
last_activity_desc: Phase 16.2 execution started
state_head: aba063f723fbf629d1a2968dc1c8309926dc36fd
last_activity_desc: Phase 16.2 complete, next Phase 16.3
state_head: ed8210132ed77af6a5abdf65949357d4b5b14f8c
progress:
total_phases: 35
completed_phases: 13
total_plans: 158
completed_plans: 154
percent: 48
gsd_state_version: "1.0"
milestone_name: milestone
---
@@ -25,22 +26,22 @@ milestone_name: milestone
See: .planning/PROJECT.md (updated 2026-09-16)
**Core value:** An existing WinterCMS-shaped app can be ported plugin by plugin to a single Go binary without its frontend noticing: the PHP version's API contract is the acceptance test.
**Current focus:** Phase 16.2 — Plugin-provided field types and the Blog Editor formwidget (INSERTED)
**Current focus:** Phase 16.3 — Backend admin personal API tokens with scopes
## Current Position
Phase: 16.2 (Plugin-provided field types and the Blog Editor formwidget (INSERTED)) — EXECUTING
Plan: 2 of 7
Status: Ready to execute
Last activity: 2026-10-10 — Phase 16.2 execution started
Phase: 16.3 (Backend admin personal API tokens with scopes) — READY TO PLAN
Plan: Not started
Status: Ready to plan
Last activity: 2026-10-10 — Phase 16.2 complete, next Phase 16.3
Progress: [██████████] 100%
Progress: [█████░░░░░] 48%
## Performance Metrics
**Velocity:**
- Total plans completed: 65
- Total plans completed: 71
- Average duration: 21 min
- Total execution time: 104 min
@@ -59,6 +60,7 @@ Progress: [██████████] 100%
| 10 | 5 | - | - |
| 10.2 | 2 | - | - |
| 14.1 | 2 | - | - |
| 16.2 | 7 | - | - |
**Recent Trend:**
@@ -750,5 +752,5 @@ Items acknowledged and carried forward from previous milestone close:
## Session Continuity
Last session: 2026-10-10T19:05:40.225Z
Stopped at: Completed 16.2-07-PLAN.md
Stopped at: Phase 16.2 complete, ready to plan Phase 11
Resume file: None