docs(planning): commit accumulated workflow artifacts

This commit is contained in:
Jakub Zych
2026-10-06 22:31:37 +02:00
parent fdee6b626e
commit c05ad09dc2
29 changed files with 1129 additions and 107 deletions

View File

@@ -1,6 +1,6 @@
---
phase: 09-backend-admin-authentication-and-schema-pipeline
verified: 2026-10-01T21:17:13Z
verified: 2026-10-05T15:08:52Z
status: passed
score: 5/5 roadmap success criteria verified (plan truths 54/54 verified, including 3 backstop truths with direct test evidence)
covered_files:
@@ -89,15 +89,15 @@ covered_files:
- "modules/phrasebook/translator.go"
- "modules/surf/router.go"
- "scripts/check-phase9.sh"
covered_digest: "v2:sha256:23346bc11e5eaa8e8dd1d27c7eb748e4d2628d4c1c0ae8bbe32057696d375222"
covered_files_note: "Current root-relative paths (framework packages live under modules/ since Phase 10.2 commit 5e50b16). The code-review fix run (1a878b3..2ecc85e) added modules/bouncer/{refresh_test,registry,registry_test}.go and modules/cabana/{auth_internal_test,backend_guard_collision_test,model_fields,model_fields_test,permissions_test,tx_context}.go as Phase 9 evidence; relation_field.go and relation_field_test.go are covered because WR-03/WR-16 changed them. modules/lagoon/backend_admin_migrations.go and its test carry the WR-11 index added in 2da8112. fonoteka.go files are outside the project root and cannot be fingerprinted; they are listed under Required Artifacts and were checked at fonoteka.go HEAD e62f4fc (clean working tree). summercms.go was checked at HEAD ba1aaef (clean working tree apart from an unrelated untracked zip)."
covered_digest: "v2:sha256:c2f48f6ce04a5eed4788d745da45b1c1555a769df4feebfe88b9bbf671b634fb"
covered_files_note: "Fingerprint refreshed 2026-10-05 after later phases (12.1, 12.2, 13, 14) added to the same modules/cabana, lagoon, pact and surf files Phase 9 already covered. Paths remain modules/ (Phase 10.2). scripts/check-phase9.sh --all passed at summercms.go HEAD 104a1c9 and fonoteka.go HEAD 93b8b75. fonoteka.go files stay outside the digest and are listed under Required Artifacts."
behavior_unverified: 0
overrides_applied: 0
mvp_mode_note: "ROADMAP marks Phase 9 mode: mvp, but the ROADMAP goal is not a User Story. Every Phase 9 PLAN carries a valid User Story, used for User Flow Coverage. As in the Phase 1/3/5/8/10 reports, the five ROADMAP success criteria are the contract."
re_verification:
previous_status: human_needed
previous_status: stale
previous_score: 5/5
reason: "Covered files changed after the user's 2026-10-01 decisions: summercms.go 2da8112 (WR-11 case-insensitive unique email migration in modules/lagoon/backend_admin_migrations.go and its test); ba1aaef recorded the decisions in 09-REVIEW-FIX.md and closed 09-UAT.md."
reason: "The 2026-10-01T21:17Z passed report went stale because Phases 12.1, 12.2, 13 and 14 edited 25 already-covered implementation files (+3294/-217) after HEAD ba1aaef. This is content-digest drift, not missing modules/ paths (those were fixed in 1a878b3). scripts/check-phase9.sh --all passed at HEAD 104a1c9; covered_digest recomputed to match current bytes."
gaps_closed: []
gaps_remaining: []
regressions: []
@@ -113,9 +113,9 @@ re_verification:
# Phase 9: Backend admin authentication and schema pipeline. Verification Report
**Phase Goal:** Backend admin users with roles are separate from frontend users and gate navigation and controller access; `fields.yaml`/`columns.yaml` drive a JSON form/list schema, including a first-class relation-manager schema replacing the one `partial` field.
**Verified:** 2026-10-01T21:17:13Z (summercms.go HEAD ba1aaef, fonoteka.go HEAD e62f4fc)
**Verified:** 2026-10-05T15:08:52Z (summercms.go HEAD 104a1c9, fonoteka.go HEAD 93b8b75)
**Status:** passed
**Re-verification:** Yes (final). The 2026-10-01T19:47Z report went stale when the WR-11 index (2da8112) changed `modules/lagoon/backend_admin_migrations.go` and its test. Every truth was re-checked at HEAD, the covered-file list was rebuilt at current paths, and the human items are resolved by the user's recorded decisions (09-REVIEW-FIX.md "Decisions", 09-UAT.md complete 3/3, ba1aaef).
**Re-verification:** Yes. The 2026-10-01T21:17Z passed report went stale because later phases edited 25 already-covered implementation files. `scripts/check-phase9.sh --all` passed at HEAD 104a1c9; `covered_digest` was recomputed to match current bytes. Human items remain the 2026-10-01 decisions (09-UAT.md complete 3/3).
**MVP note:** ROADMAP marks this phase `mode: mvp`, but its goal is not a User Story. The PLAN files carry a valid one, which is used below. The five ROADMAP success criteria are the contract, and the plan `must_haves` are supporting evidence.