docs(14.2.1-05): complete hydrate enabled locales on admin ML forms plan
This commit is contained in:
@@ -2,18 +2,18 @@
|
||||
gsd_state_version: "1.0"
|
||||
milestone: v1.0
|
||||
current_phase: 14.2.1
|
||||
current_phase_name: translate-plugin
|
||||
status: verifying
|
||||
stopped_at: Completed 14.2.1-04-PLAN.md
|
||||
last_updated: "2026-10-06T13:18:47.315Z"
|
||||
current_phase_name: Translate plugin (INSERTED)
|
||||
status: executing
|
||||
stopped_at: Completed 14.2.1-05-PLAN.md
|
||||
last_updated: "2026-10-06T13:44:21.673Z"
|
||||
last_activity: 2026-10-06
|
||||
last_activity_desc: 14.2.1-04 tests, phase gate, and security review
|
||||
state_head: 249b4d10cac25d64f987d719fdb581bb08c0aac0
|
||||
last_activity_desc: Phase 14.2.1 execution started
|
||||
state_head: 424fe9ccc06d34436e148add6334d1c2206723c2
|
||||
progress:
|
||||
total_phases: 26
|
||||
completed_phases: 12
|
||||
total_plans: 131
|
||||
completed_plans: 129
|
||||
completed_plans: 130
|
||||
milestone_name: milestone
|
||||
---
|
||||
|
||||
@@ -24,14 +24,14 @@ milestone_name: milestone
|
||||
See: .planning/PROJECT.md (updated 2026-09-16)
|
||||
|
||||
**Core value:** An existing WinterCMS-shaped app can be ported plugin by plugin to a single Go binary without its frontend noticing: the PHP version's API contract is the acceptance test.
|
||||
**Current focus:** Phase 14.2.1 — Translate plugin
|
||||
**Current focus:** Phase 14.2.1 — Translate plugin (INSERTED)
|
||||
|
||||
## Current Position
|
||||
|
||||
Phase: 14.2.1 (translate-plugin) — READY TO EXECUTE
|
||||
Plan: 4 of 4 complete
|
||||
Status: Verification gaps — CR-01 admin ML locale switch; do not mark complete
|
||||
Last activity: 2026-10-06 — 14.2.1-VERIFICATION.md status gaps_found (14/16)
|
||||
Phase: 14.2.1 (Translate plugin (INSERTED)) — EXECUTING
|
||||
Plan: 5 of 6 complete
|
||||
Status: Ready to execute 14.2.1-06
|
||||
Last activity: 2026-10-06 — Completed 14.2.1-05-PLAN.md
|
||||
|
||||
Progress: [██████████] 100%
|
||||
|
||||
@@ -184,6 +184,7 @@ Progress: [██████████] 100%
|
||||
| Phase 14.2.1 P02 | 15 min | 3 tasks | 21 files |
|
||||
| Phase 14.2.1 P03 | 5 min | 3 tasks | 40 files |
|
||||
| Phase 14.2.1 P04 | 51 min | 3 tasks | 22 files |
|
||||
| Phase 14.2.1 P05 | 11 | 3 tasks | 24 files |
|
||||
|
||||
## Accumulated Context
|
||||
|
||||
@@ -584,6 +585,7 @@ Recent decisions affecting current work:
|
||||
- [Phase 14.2.1]: Locales is HasAdminControllers plus HasNavigation (not HasSettings); Fillable excludes is_default/sort_order; makeDefault uses GORM Updates maps.
|
||||
- [Phase 14.2.1]: Task 2 locked grzyby-submodules: proof host is sm-grzybyfunkcjonalne-app with plugins/golem15/user and plugins/golem15/translate; host go.work replace points at ../summercms.go.
|
||||
- [Phase 14.2.1]: 14.2.1-04 security review was executor-self-performed (no gsd-security-auditor in this Cursor session); every cited TestName was re-run. Full cabana `-race` needs `-timeout 30m`. WhereIndex falls back to the host column when no index row matches (PHP transWhere).
|
||||
- [Phase 14.2.1]: writer-exact: add TranslatedExact to cabana.TranslationWriter; AdminWriter delegates to classes.TranslatedExact
|
||||
|
||||
### Pending Todos
|
||||
|
||||
@@ -636,6 +638,6 @@ Items acknowledged and carried forward from previous milestone close:
|
||||
|
||||
## Session Continuity
|
||||
|
||||
Last session: 2026-10-06T12:21:36Z
|
||||
Stopped at: Completed 14.2.1-04-PLAN.md
|
||||
Last session: 2026-10-06T13:44:20.876Z
|
||||
Stopped at: Completed 14.2.1-05-PLAN.md
|
||||
Resume file: None
|
||||
|
||||
Reference in New Issue