docs(12.1-03): update state and roadmap after the Users screen plan

This commit is contained in:
Jakub Zych
2026-10-05 13:34:30 +02:00
parent 76df9c5bd6
commit fcc86ac45e
3 changed files with 16 additions and 10 deletions

View File

@@ -4,16 +4,16 @@ milestone: v1.0
current_phase: "12.1"
current_phase_name: User plugin admin screens
status: executing
stopped_at: Completed 12.1-02-PLAN.md
last_updated: "2026-10-05T10:43:57.974Z"
stopped_at: Completed 12.1-03-PLAN.md
last_updated: "2026-10-05T11:34:10.203Z"
last_activity: 2026-10-04
last_activity_desc: Phase 12.1 execution started
state_head: bd4960401df99db7e1e4bb43ba1ab9edcde6f658
state_head: 76df9c5bd6124d79d84ed67359f46fa347a1d58f
progress:
total_phases: 22
completed_phases: 11
total_plans: 123
completed_plans: 120
completed_plans: 121
milestone_name: milestone
---
@@ -29,7 +29,7 @@ See: .planning/PROJECT.md (updated 2026-09-16)
## Current Position
Phase: 12.1 (User plugin admin screens) — EXECUTING
Plan: 3 of 5
Plan: 4 of 5
Status: Ready to execute
Last activity: 2026-10-04 — Phase 12.1 execution started
@@ -174,6 +174,7 @@ Progress: [██████░░░░] 60%
| Phase 14 P06 | 132 min | 4 tasks | 26 files |
| Phase 12.1 P01 | 38min | 4 tasks | 61 files |
| Phase 12.1 P02 | 12h 43m | 6 tasks | 77 files |
| Phase 12.1 P03 | 46min | 4 tasks | 40 files |
## Accumulated Context
@@ -547,6 +548,10 @@ Recent decisions affecting current work:
- [Phase 12.1]: 12.1-02: relation locks are enforced on form create and update only; relation-manager link and unlink routes do not ask RelationLockProvider (open for plan 05)
- [Phase 12.1]: 12.1-02: the SPA sends a permissioneditor field on every update reduced to offered codes; a locked code with a stored value outside the mode's set makes every save a 403 (open for plan 05)
- [Phase 12.1]: 12.1-02: pact.FilterOptions keeps its signature and is asked on the admin controller before the model
- [Phase 12.1]: Users admin controller and its guard live in sm-user-plugin: a privileged-group member's email, password and permanent delete need golem15.users.manage_privileged_groups; refusals are cabana.ForbiddenError (D-30)
- [Phase 12.1]: HasPermission ports Winter line by line: a leading asterisk is a wildcard on the asked code only; PermissionSet.Scan fails on content that is not a JSON object rather than read it as empty
- [Phase 12.1]: A user created in the admin gets has_self_set_password true and stays not activated; the invitation carries the login and the activation link, never the password
- [Phase 12.1]: Plugin admin tests boot the plugin alone through newAdminEnv; mail is read from the log driver because the mailer service cannot be replaced after party.Activate
### Pending Todos
@@ -575,6 +580,7 @@ Recent decisions affecting current work:
- Phase 8 UI gate: scripts/check-phase8-ui.mjs --final-gate's real Playwright browser matrix (32 UI-SPEC scenarios) is unimplemented (deliberate fatal() at check-phase8-ui.mjs:458, never authored by 08-05); stage_ui_harness must keep failing closed until a Playwright spec is authored. User approved Phase 8 closure on 2026-09-24 with this gap carried forward -- see 08-10-SUMMARY.md and .planning/phases/08-oauth2-1-authorization-server/deferred-items.md.
- Push summercms.go master and tag v0.1.3 to origin (tag is local on df5cace by the user's tag-local choice); the sm-user-plugin push of plan 12.1-05 Task 3 waits until git ls-remote --tags origin v0.1.3 lists the tag
- fonoteka.go plugins/golem15/fonoteka: TestPhase09SecurityRoutes and TestPhase10ControllerCopy fail against framework v0.1.3 (fixed route and message-key lists lack the Phase 12.1 additions); see .planning/phases/12.1-user-plugin-admin-screens/deferred-items.md
- fonoteka.go: four more application tests pin lists the user plugin's admin work changes (TestAdminMetadataFiltering, TestHiddenNeverMarshals, parity TestMigrateSeedsCanonicalGenres and TestRollbackLastIsolatesFonoteka) and TestSchemaMatchesPHPSnapshot needs the frontend-permissions allow-list entry; plan 12.1-04 owns them (deferred-items.md)
### Quick Tasks Completed
@@ -598,6 +604,6 @@ Items acknowledged and carried forward from previous milestone close:
## Session Continuity
Last session: 2026-10-05T10:43:39.991Z
Stopped at: Completed 12.1-02-PLAN.md
Last session: 2026-10-05T11:34:09.660Z
Stopped at: Completed 12.1-03-PLAN.md
Resume file: None