Jakub Zych
57fdaa0d85
docs(14.1): revise plans from checker
2026-10-05 19:40:40 +02:00
Jakub Zych
3bd461ec68
docs(14.1): create phase plan
2026-10-05 19:36:32 +02:00
Jakub Zych
1f228f85bd
docs(14.1): add pattern map
2026-10-05 19:29:31 +02:00
Jakub Zych
f453b80dc7
docs(14.1): add validation strategy
2026-10-05 19:26:11 +02:00
Jakub Zych
0ea0c787a5
docs(14.1): research phase domain
2026-10-05 19:24:49 +02:00
Jakub Zych
104a1c9f0b
docs(12.1): add verification covered_digest so the report is not stale
2026-10-05 16:54:01 +02:00
Jakub Zych
30336e44c6
docs(12.1): verification, UAT, and code-review close-out
2026-10-05 16:53:16 +02:00
Jakub Zych
4e4ce40dbb
docs(12.1-05): close plan 05 with SUMMARY after the executor died before writing it
2026-10-05 16:51:31 +02:00
Jakub Zych
93f0171e9c
docs(12.1-05): security review and validation sign-off for Phase 12.1
...
- 12.1-SECURITY-REVIEW.md: every threat T-12.1-01 to T-12.1-40 and T-12.1-SC with its mitigation, test and observed result; T-12-18 revisited; the D-30 guard and its boundary; the eleven handed-over items; five findings that need a decision
- 12.1-VALIDATION.md: per-task map with real task ids and measured run times, signed off
- deferred-items.md: older framework files that name an application
2026-10-05 16:13:50 +02:00
Jakub Zych
3f4a01ddf8
docs(12.1-04): complete groups field, User Groups and Organisations plan
2026-10-05 14:09:34 +02:00
Jakub Zych
76df9c5bd6
docs(12.1-03): complete plugin foundation and Users screen plan
2026-10-05 13:33:50 +02:00
Jakub Zych
bd4960401d
docs(12.1-02): complete framework preview and form seams plan
...
- summary with the v0.1.3 tag, gate times and contract names
- deferred item for two application inventory tests
- WINDOWS entry 9 fixed: RecordActions.vue is mounted
2026-10-05 12:43:23 +02:00
Jakub Zych
1c99de5013
docs(12.1-01): complete framework actions plan
2026-10-04 23:55:37 +02:00
Jakub Zych
9cbce01b46
docs(12.1): create phase plan
2026-10-04 19:41:08 +02:00
Jakub Zych
ea0fc6f191
docs(12.1): record plan-count checkpoint decisions
2026-10-04 17:39:39 +02:00
Jakub Zych
1577e02b0e
docs(12.1): UI design contract
2026-10-04 17:29:20 +02:00
Jakub Zych
8a69c1ef1c
docs(12.1): UI design contract
2026-10-04 16:07:57 +02:00
Jakub Zych
0b25a1da24
docs(phase-12.1): add validation strategy
2026-10-04 15:23:55 +02:00
Jakub Zych
3dedaac049
docs(12.1): research phase domain
2026-10-04 15:22:54 +02:00
Jakub Zych
6bf1943f8a
docs(12.1): capture phase context
2026-10-04 14:52:44 +02:00
Jakub Zych
9002ecb844
docs(14.1): capture phase context
2026-10-04 14:52:32 +02:00
Jakub Zych
67e4406250
docs(15): capture phase context
2026-10-04 14:30:25 +02:00
Jakub Zych
0323aeb6fb
docs(14): record code review disposition
2026-10-04 08:13:29 +02:00
Jakub Zych
f5cf6f2580
docs(14): align fix report titles with the review
2026-10-04 08:13:28 +02:00
Jakub Zych
d5a8ef7834
docs(14): record code review disposition
2026-10-04 08:13:17 +02:00
Jakub Zych
5d3299b26f
docs(14): add code review fix report
2026-10-04 08:13:12 +02:00
Jakub Zych
b7d10a4448
test(14): verification report and human verification items as UAT
2026-10-04 03:13:37 +02:00
Jakub Zych
aa8ff53c0c
docs(14): record code review disposition
2026-10-04 03:05:31 +02:00
Jakub Zych
549ffed415
docs(14): add code review report
2026-10-04 03:05:10 +02:00
Jakub Zych
e67dbaf895
docs(14-06): complete unit tests and Phase 14 gate plan
2026-10-04 02:49:59 +02:00
Jakub Zych
17b2ef1961
docs(14-06): Phase 14 validation signed off, requirements complete, API coverage confirmed, folded todos closed
...
- 14-VALIDATION.md: per-task map 14-01-T1 to 14-06-T4, all green, the
measured coverage, validated, Nyquist-compliant, Wave 0 complete, the
final --all and --removal results
- REQUIREMENTS.md: INTG-02 and API-08 Complete (JOBS-02, JOBS-03, SRCH-02,
INTG-01, CLI-05 already were)
- COVERAGE.md: every INTEGRATE row's test confirmed by --named
- fetchguard-guarded-http-client and redacting-slog-handler moved to done
2026-10-04 02:47:53 +02:00
Jakub Zych
81543524be
docs(14-06): Phase 14 security review maps every T-14 threat to its protection, test and removal check
2026-10-04 02:11:15 +02:00
Jakub Zych
5024e3ff42
docs(14-05): complete sm-feedback-plugin plan
2026-10-04 00:28:16 +02:00
Jakub Zych
b3e4626d2d
docs(14-04): complete sm-golem-plugin and AI recognition plan
2026-10-03 23:39:07 +02:00
Jakub Zych
f519261da6
docs(14-03): complete Discogs routes plan
2026-10-03 22:25:35 +02:00
Jakub Zych
f22c9144e6
docs(14-02): complete Discogs core, CSV and digest workers, prune and reindex plan
2026-10-03 21:26:02 +02:00
Jakub Zych
43b869d613
docs(14-01): complete framework helpers plan
2026-10-03 20:03:29 +02:00
Jakub Zych
ed4d4c380c
docs(14): create phase plan
2026-10-03 18:56:43 +02:00
Jakub Zych
de5b01266b
docs(14): add pattern map
2026-10-03 18:18:50 +02:00
Jakub Zych
1c7538d54c
docs(14): record plan-time decisions from research checkpoint
2026-10-03 18:15:27 +02:00
Jakub Zych
5353aa28a5
docs(phase-14): add research and validation strategy
2026-10-03 17:49:00 +02:00
Jakub Zych
2746bf5ac5
docs(14): capture phase context
2026-10-03 17:27:17 +02:00
Jakub Zych
3c9516b080
test(13): persist human verification items as UAT
2026-10-03 12:04:54 +02:00
Jakub Zych
8b4f03a36c
docs(13): record code review disposition
2026-10-03 11:56:30 +02:00
Jakub Zych
412bc30daf
docs(13): add code review report
2026-10-03 11:56:22 +02:00
Jakub Zych
bcd099566b
docs(13-06): complete the Phase 13 unit tests, gate and sign-off plan
2026-10-03 11:45:03 +02:00
Jakub Zych
931c02db31
docs(13-06): sign off the Phase 13 security review and validation
...
- 13-SECURITY-REVIEW.md: every T-13 threat with its strictest severity and
disposition, protecting code, named tests and the 31 removal checks,
all failing as required; the CSV export logging fix and the Phase 9
route inventory update
- 13-VALIDATION.md: per-task map 13-01-T1 to 13-06-T3 all green, the gate
command, coverage per package, Wave 0 ticked, status validated
- REQUIREMENTS.md: API-03, API-04, API-06 and API-07 complete
- deferred-items.md: 13-06 findings (process-wide job dispatcher, scalar
mapping body, tmpfs quota)
2026-10-03 11:43:39 +02:00
Jakub Zych
80c6d5f5d0
docs(13-05): complete public share routes plan
2026-10-03 10:30:18 +02:00
Jakub Zych
47168ed909
docs(13-04): complete CSV export and import plan
2026-10-03 09:52:22 +02:00
Jakub Zych
d1d5ee2012
docs(13-03): complete wishlist plan
2026-10-03 08:24:27 +02:00