Commit Graph

240 Commits

Author SHA1 Message Date
Jakub Zych
6f57604028 docs(11.1): create phase plan
Six plans (tracer generator, site UX and checkers, content A, content B,
acme/blog walkthrough, unit tests). SC4/DOCS-04 narrowed to docs/ pages per
D-18; README Go fence conversion logged as a todo.
2026-09-30 20:33:51 +02:00
Jakub Zych
9033d81721 docs(11.1): record plan-count checkpoint decisions, DOCS requirements and pattern map 2026-09-30 19:39:50 +02:00
Jakub Zych
30d3bfec67 docs(11): create phase gap plan 2026-09-30 16:14:17 +02:00
Jakub Zych
dd97fd12a6 docs(11): add phase verification report (gaps found) 2026-09-30 15:31:09 +02:00
Jakub Zych
5fa062d554 docs(11): record code review disposition 2026-09-30 15:18:21 +02:00
Jakub Zych
2fb0f7d328 docs(11): add code review report 2026-09-30 15:18:20 +02:00
Jakub Zych
45fb00af1a docs(11-07): complete Phase 11 unit tests and gate plan 2026-09-30 14:56:53 +02:00
Jakub Zych
a34c6ece18 docs(11-07): security review with removal checks and the validated test map
- 11-SECURITY-REVIEW.md: T-11-01..T-11-30 and T-11-SC with each plan's
  severity and disposition, mitigation, test and result; RC-01..RC-13
  removal checks for every high mitigated threat; the three defects fixed
  in 11-07
- 11-VALIDATION.md: task ids, plans and waves per row, commands run,
  status validated, nyquist_compliant and wave_0_complete true
2026-09-30 14:49:36 +02:00
Jakub Zych
a0f65cdc09 docs(11-04): complete flare Web Push and websockets commands plan 2026-09-30 13:54:25 +02:00
Jakub Zych
67d1a25e31 docs(11-06): complete Centrifugo broadcast goldens and realtime route parity plan 2026-09-30 13:34:05 +02:00
Jakub Zych
0a1fdb5aa0 docs(11-05): complete beachcomber search sync plan 2026-09-30 13:06:46 +02:00
Jakub Zych
0d45698ad7 docs(11-03): record plan 11-03 progress and decisions 2026-09-30 12:38:42 +02:00
Jakub Zych
499177a242 docs(11-03): complete lighthouse realtime plan 2026-09-30 12:37:58 +02:00
Jakub Zych
f1077382f5 docs(11-02): complete scheduler plan 2026-09-29 22:54:28 +02:00
Jakub Zych
144c54bb2c docs(11-01): complete conga job framework plan 2026-09-29 15:27:29 +02:00
Jakub Zych
718a35caba docs(11): create phase plan 2026-09-29 14:34:06 +02:00
Jakub Zych
d9b951fe29 docs(11): map phase patterns 2026-09-29 13:40:53 +02:00
Jakub Zych
9dabc6c5a1 docs(phase-11): add validation strategy 2026-09-29 12:32:56 +02:00
Jakub Zych
c82950c2a6 docs(11): research phase domain 2026-09-29 12:32:02 +02:00
Jakub Zych
0bbbce6d27 docs(10.1): record code review disposition 2026-09-29 10:10:45 +02:00
Jakub Zych
c0d16eccc1 docs(10.1): add code review fix report 2026-09-29 10:10:44 +02:00
Jakub Zych
74e30c9878 test(10.1): persist human verification items as UAT 2026-09-29 03:37:38 +02:00
Jakub Zych
29433f3c40 docs(10.1): record code review disposition 2026-09-29 03:29:52 +02:00
Jakub Zych
9f6b5a5706 docs(10.1): add code review report 2026-09-29 03:29:41 +02:00
Jakub Zych
0ddf7f8f68 docs(10.1-04): complete unit tests, gate and security evidence plan 2026-09-29 03:14:47 +02:00
Jakub Zych
bbceeb957f docs(10.1-04): record the Phase 10.1 security review and validation map
- 10.1-SECURITY-REVIEW.md: T-10.1-01 to T-10.1-22 and T-10.1-SC with
  mitigation, test or gate stage, observed result and 23 removal checks
- 10.1-VALIDATION.md: every plan task mapped to its command, all green
  under check-phase10.1.sh --all; nyquist_compliant and wave 0 complete
- Phase 10 deferred item for the parity failures marked resolved
2026-09-29 03:13:18 +02:00
Jakub Zych
29336a58ce docs(10.1-03): complete Albums extension proof plan 2026-09-29 02:28:40 +02:00
Jakub Zych
9d23ac5832 docs(11.2): capture phase context
Four repos (sm-summercms-app, vue-summercms-app, sm-summercms-plugin,
sm-newsletter-plugin), Nuxt 4 static site in EN and PL embedded in the
binary, double opt-in signup with honeypot, consent and neutral
responses, and a standalone sending-ready subscribers table.
2026-09-29 02:24:10 +02:00
Jakub Zych
55c47ca3bc docs(10.1-02): complete SPA extension seams plan 2026-09-29 02:15:15 +02:00
Jakub Zych
484eeb989b docs(roadmap): insert phase 11.2 ready-to-share website and newsletter plugin
Adds Phase 11.2 after 11.1: the sm-summercms-app root with a
vue-summercms-app website, an sm-newsletter-plugin stub ported from
Golem15.Newsletter with double opt-in signup, and the 11.1 docs served
at /docs. Records the sm- repo naming convention.
2026-09-29 02:14:35 +02:00
Jakub Zych
2325d80ecb docs(10.1-01): complete framework Go extension point plan 2026-09-28 23:54:08 +02:00
Jakub Zych
9b98d8409f docs(10.1): record D-18/D-19, resolve research questions, add pattern map
Plan checker iteration 1 flagged unresolved research questions and a
missing decision note for golang.org/x/net/html. D-18 approves x/net/html
for the partial sanitizer; D-19 fixes the Discogs widget fill to
[year, format]. STATE marks the phase ready to execute.
2026-09-28 22:44:34 +02:00
Jakub Zych
ccdc014078 docs(10.1): create phase plans for the runtime admin extension point
Four plans: framework Go contracts and routes, framework SPA hosts,
Albums proof in fonoteka.go, and unit tests with the phase gate.
Adds ADMIN-07 to REQUIREMENTS.md and fills the Phase 10.1 roadmap goal,
success criteria and plan list.
2026-09-28 22:25:50 +02:00
Jakub Zych
04c587a5a3 docs(11.1): UI design contract 2026-09-28 22:25:34 +02:00
Jakub Zych
bf61acada1 docs(11.1): insert documentation phase with context and validation strategy 2026-09-28 20:22:59 +02:00
Jakub Zych
09c1ade9a9 docs(11.1): research documentation phase domain 2026-09-28 18:20:42 +02:00
Jakub Zych
b2845e016b docs(10.1): approve UI design contract and resolve state gaps 2026-09-28 16:54:41 +02:00
Jakub Zych
f4459ac7c2 docs(10.1): UI design contract 2026-09-28 16:12:25 +02:00
Jakub Zych
e51be3529e docs(phase-10.1): add validation strategy 2026-09-28 15:56:27 +02:00
Jakub Zych
4e7f0e09d1 docs(10.1): research runtime admin extension point 2026-09-28 15:56:27 +02:00
Jakub Zych
cc584e906e docs(phase-10.2): complete phase execution 2026-09-28 14:13:20 +02:00
Jakub Zych
4dc4c05722 docs(10.2): record UI audit applicability 2026-09-28 13:41:39 +02:00
Jakub Zych
da6f0b2eff docs(phase-10.2): add security threat verification 2026-09-28 13:39:14 +02:00
Jakub Zych
02712ad651 docs(phase-10.2): add validation strategy 2026-09-28 13:38:09 +02:00
Jakub Zych
961bfd2749 docs(10.2): record code review disposition 2026-09-28 13:35:33 +02:00
Jakub Zych
c56561374c docs(10.2): add code review report 2026-09-28 13:31:19 +02:00
Jakub Zych
957625e00e docs(10.2-02): complete framework onboarding plan 2026-09-28 13:23:50 +02:00
Jakub Zych
1c2f44ae83 docs(10.2-01): summarize modules migration 2026-09-28 13:03:41 +02:00
Jakub Zych
a9a7bbef73 fix(10.2): revise plans based on checker feedback 2026-09-28 01:56:53 +02:00
Jakub Zych
039cfeddfd docs(10.2): create phase plan 2026-09-28 01:46:23 +02:00