7fd23f0642
docs(32): capture phase context
2026-10-24 16:47:37 +02:00
07e32b5be8
docs: add phase 32 SEO foundation to the roadmap
2026-10-24 16:06:53 +02:00
223f87e0f1
docs(phase-19.7): update validation strategy
2026-10-24 00:39:40 +02:00
505b8991ee
docs(19.7): verification passed after UAT
2026-10-24 00:31:40 +02:00
691459174a
test(19.7): complete UAT - 5 passed, 0 issues
2026-10-24 00:31:27 +02:00
eb9a62a5ec
test(19.7): accept the SC-3 group-grant override in UAT
2026-10-24 00:17:04 +02:00
b8e7ba9d4f
docs(19.7): keep coverage matrix rows within the gate's length limit
2026-10-24 00:16:28 +02:00
1038034078
docs(19.7): add MCP API coverage matrix
2026-10-24 00:16:16 +02:00
85a137df24
test(19.7): persist human verification items as UAT
2026-10-23 22:05:28 +02:00
94ee2cee03
docs(19.7): phase verification (human_needed)
2026-10-23 22:05:22 +02:00
33c40ff483
docs(19.7): add re-review fix report
2026-10-23 21:29:07 +02:00
1fe553e344
docs(19.7): record the journal plugin head after the lane C fixes
2026-10-23 21:27:36 +02:00
4d5a09ae62
docs(19.7): defer the remaining lane C re-review items
2026-10-23 21:17:46 +02:00
0b0cae5b53
docs(19.7): defer the remaining lane B re-review items
2026-10-23 20:39:37 +02:00
eea04b171e
docs(19.7): defer the remaining lane A re-review items
2026-10-23 20:23:17 +02:00
f53668a3e8
docs(19.7): add gap-closure re-review report
2026-10-23 19:21:58 +02:00
883ac5133c
docs(19.7-09): complete the gap-closure tests, gate and security review plan
2026-10-23 19:03:06 +02:00
e1f489058c
docs(19.7-09): deferred items for the gap closure
...
B-IN-05 (deferred, the shared confirm primitive), B-IN-06 (no fix
needed), the admin:token:revoke event, the OIDC decision (resolved), the
local go.work retarget, the demo pins, the release order with
PHASE197_RELEASED, the lenient link code parse and one offline-build
flake; the plan 05 test-commit entry is superseded by the release.
2026-10-23 18:55:37 +02:00
a636933299
docs(19.7-09): validation rows for every gap-closure test
...
One row per new behaviour of plans 06-09 with its final command; every row
green after the plan 09 gate run; nyquist_compliant stays true.
2026-10-23 18:54:51 +02:00
33faa44e53
docs(19.7-09): security contract with the gap-closure threats and corrected rows
...
T-19.7-42..T-19.7-65 join the register, the eight corrected rows carry
their fix commits, the audit trail records the gap closure; threats_open
stays 0 (every high threat is fixed or verified).
2026-10-23 18:54:06 +02:00
946fb2d3ea
docs(19.7-09): security review corrected and extended for the gap closure
...
Corrects the verdicts the code review disproved (T-19.7-22 first, then
T-19.7-03, -08, -17, -18, -23, -31, -35 and cross-cutting findings 1 and
6), adds the Method step that a high or critical control is verified only
by a test that fails without it, the revert-checks of the three critical
fixes, and the register rows T-19.7-42..T-19.7-65.
2026-10-23 18:53:31 +02:00
Jakub Zych
bccf06d960
wip: phase 19.7 paused at gap plan 8/9 (before 19.7-09)
2026-10-23 17:14:30 +02:00
Jakub Zych
1e5d9d4f88
docs(19.7-08): complete plugin gap-closure plan (lane C, E-1, E-2)
2026-10-23 17:13:01 +02:00
Jakub Zych
d6c7fd5a27
docs(19.7-07): complete lane B gap-closure plan with auth_time and the E-2 seam
2026-10-23 16:32:44 +02:00
Jakub Zych
6ca9e1706d
docs(19.7-06): complete lane A gap-closure plan in pier
2026-10-23 16:10:52 +02:00
Jakub Zych
d18d8f0dc2
docs(19.7): ban and password reset revoke OIDC grants as well as MCP grants (user decision)
2026-10-23 15:46:44 +02:00
Jakub Zych
d763e92650
docs(19.7): gap-closure plans 06-09 for the review findings and the sm-servers-app escalations
2026-10-23 15:44:15 +02:00
Jakub Zych
2527498d03
docs(19.7): gap-closure plan split and release order
2026-10-23 15:03:52 +02:00
Jakub Zych
cee58c0f65
docs(19.7): gap-closure inputs: review findings and two sm-servers-app escalations
2026-10-23 15:02:44 +02:00
Jakub Zych
fef1cbbbbd
docs(19.7): add code review report
2026-10-23 14:54:54 +02:00
Jakub Zych
d9d2acae88
docs(19.7-05): plan 05 summary; phase gate green, security review done, plugin test commits local
2026-10-23 14:41:38 +02:00
Jakub Zych
4730e37742
docs(19.7-05): security review and contract, deferred items, folded todos closed
...
- 19.7-SECURITY-REVIEW.md: T-19.7-01..41 and T-19.7-SC with file, line and
pinning test; two production fixes (c49983d , 1111828 ); superuser reach
accepted as designed with audit and ceiling
- 19.7-SECURITY.md: threats_open 0, accepted risks AR-19.7-01..05
- the frontend permission and account link todos move to todos/done with
their closing notes
2026-10-23 14:29:56 +02:00
Jakub Zych
d621ef1b41
docs(19.7-05): validation map filled, Wave 0 complete, Nyquist compliant
2026-10-23 14:24:13 +02:00
Jakub Zych
81266de77d
docs(19.7-04): plan 04 summary; oauthserver v0.1.2 and Journal v0.2.3 released, pinned in the demo
...
- SUMMARY with every deviation from the checkpoint report
- deferred items: sm-demo-app push and deploy wait for the user, release
builds on summercms v0.4.4 lack the cabana subject-event fix, Redis for a
second instance, the real-client check, the retracted mimetype
2026-10-23 13:17:36 +02:00
Jakub Zych
9550fe0a9f
docs(19.7-04): deferred items from the oauthserver, Journal and demo MCP wiring
2026-10-23 12:56:08 +02:00
Jakub Zych
7c43820afe
docs(19.7): cabana subject-event bug resolved
2026-10-23 12:44:09 +02:00
Jakub Zych
607658599f
docs(19.7-03): sm-user-plugin v0.1.10 released and pinned in five apps; cabana subject-event bug deferred
...
Plan 03 summary: verified account link, Administrators-screen link actions, plugin frontend permissions, user MCP guard and user_me in sm-user-plugin v0.1.10 (requires SummerCMS v0.4.4). deferred-items: cabana fires pact.MCPSubjectChanged as a value inside the transaction while pier listens for a pointer; fix before v0.5.0.
2026-10-23 12:30:15 +02:00
Jakub Zych
eadd58414d
docs(19.7-02): close plan without a release
2026-10-23 00:23:08 +02:00
Jakub Zych
1aff96f58a
docs(19.7-02): record deferred items from the pier session router
2026-10-22 18:36:23 +02:00
Jakub Zych
3746675c72
docs(19.7-01): complete framework seams plan
2026-10-22 16:45:12 +02:00
Jakub Zych
b28800ad39
docs(phase-19.6.1): add/update security threat verification
2026-10-22 15:27:39 +02:00
Jakub Zych
0a5945d681
test(19.6.1): mark verification passed after UAT retest
2026-10-22 15:24:11 +02:00
Jakub Zych
19c6a65575
test(19.6.1): pass UAT test 2 after relation-label remount fix
2026-10-22 15:24:01 +02:00
Jakub Zych
49ffb395c0
docs(19.7): add pattern map, mark D-36 informational, drop session path from plan 02
2026-10-22 14:59:54 +02:00
Jakub Zych
2f496f6200
test(19.6.1): re-verify after relation-label gap closure
2026-10-22 14:59:34 +02:00
Jakub Zych
43d0f4622c
docs(19.7): revise plans after plan check
2026-10-22 14:57:52 +02:00
Jakub Zych
587f9ddf2f
docs(19.6.1): review persist relation labels
...
Co-authored-by: Cursor <cursoragent@cursor.com >
2026-10-22 14:51:39 +02:00
Jakub Zych
007c68bab2
docs(19.6.1-05): complete persist relation labels plan
2026-10-22 14:43:34 +02:00
Jakub Zych
d47d6182f0
docs(19.7): create phase plans (5 plans: seams, pier, user plugin, oauthserver+journal+demo, tests and security review)
2026-10-22 14:41:30 +02:00
Jakub Zych
ba0501c274
test(19.6.1): complete UAT - 25 passed, 1 issue
2026-10-22 14:30:13 +02:00