Commit Graph

388 Commits

Author SHA1 Message Date
Jakub Zych
1a878b371e docs(09): regenerate verification report for modules/ paths 2026-10-01 20:54:54 +02:00
Jakub Zych
6a2ee9d2f9 docs: capture todo - Benchmark Płytarium on WinterCMS vs SummerCMS 2026-10-01 20:25:24 +02:00
Jakub Zych
ecdef31c38 docs(quick-261001-qoa): add a docs page on performance and scaling compared to PHP/WinterCMS 2026-10-01 19:21:34 +02:00
Jakub Zych
2fc5eac6d5 test(11.2): record the WR-03 decision in UAT 2026-10-01 17:13:16 +02:00
Jakub Zych
37f7192832 docs(11.2): add code review fix report and record dispositions 2026-10-01 17:13:08 +02:00
Jakub Zych
fbec0b4597 test(11.2): persist verification report and human verification items as UAT 2026-10-01 16:57:16 +02:00
Jakub Zych
749ceea5ea docs(11.2): add code review report and disposition ledger 2026-10-01 16:49:40 +02:00
Jakub Zych
5a16c3f6d5 docs(state): record plan 11.2-03 completion 2026-10-01 16:40:56 +02:00
Jakub Zych
c07db9a321 docs(11.2-03): complete the unit test coverage and phase gate plan 2026-10-01 16:40:36 +02:00
Jakub Zych
a2f2d1e5c7 docs(11.2): validate the phase verification map 2026-10-01 16:39:09 +02:00
Jakub Zych
2229ca3c60 docs(state): record plan 11.2-02 completion 2026-10-01 16:24:24 +02:00
Jakub Zych
29231efab2 docs(11.2-02): complete the summercms.io app, site plugin and deploy plan 2026-10-01 16:24:01 +02:00
Jakub Zych
130b6ac38f docs(11.2): rename the site repositories to summercmsio (D-48) 2026-10-01 15:58:30 +02:00
Jakub Zych
5d2184e9e6 docs(state): record plan 11.2-01 completion 2026-10-01 15:57:08 +02:00
Jakub Zych
8762e92a32 docs(11.2-01): complete the summercms.io Nuxt landing page plan 2026-10-01 15:56:48 +02:00
Jakub Zych
88f21af923 docs(11.2): create phase plan 2026-10-01 15:40:27 +02:00
Jakub Zych
b6013a81ed docs(11.2): map analog patterns for the landing page phase 2026-10-01 15:11:32 +02:00
Jakub Zych
5dcfc0867b docs(11.2): record site_label and pretty docs link decisions 2026-10-01 15:09:12 +02:00
Jakub Zych
e032a65fc9 docs(11.2): research the landing page phase and add validation strategy 2026-10-01 15:08:12 +02:00
Jakub Zych
e7a18ca87b docs(state): record phase 11.2 context session 2026-10-01 14:33:55 +02:00
Jakub Zych
3cbc8d32d1 docs(11.2): capture phase context for the Alpha 0.1 landing page 2026-10-01 14:33:50 +02:00
Jakub Zych
59122d53c1 docs(11.2): reshape into the Alpha 0.1 landing page and split the newsletter into 11.3 2026-10-01 14:33:50 +02:00
Jakub Zych
79116a2e03 chore: untrack and ignore the machine-local milestone lock 2026-10-01 13:15:59 +02:00
Jakub Zych
6b7c96aa45 docs: add phase 9 stale-verification debug note, phase dir placeholders and 11.1 state 2026-10-01 13:15:59 +02:00
Jakub Zych
9115a43a71 docs(quick-261001-ddh): Replace lagoon hardcoded ICU pl-PL database locale with per-query COLLATE option 2026-10-01 09:55:02 +02:00
Jakub Zych
026ce74234 docs(quick-261001-ddh): record per-query collation decision superseding D-06 2026-10-01 09:53:57 +02:00
Jakub Zych
565ce982d9 test(11.1): persist human verification items as UAT 2026-10-01 09:36:25 +02:00
Jakub Zych
571a2e56a0 docs(11.1): record gap-closure code review 2026-10-01 09:25:15 +02:00
Jakub Zych
16be02c6f1 docs(11.1-07): complete the fail-closed checkers plan 2026-10-01 08:59:26 +02:00
Jakub Zych
ce5dcec7e4 docs(11.1-07): record gap-closure checks in validation and the README follow-up
- validation map rows 11.1-07-T1 through T5 with the commands that passed
- the README src= todo names the refusal, caption and Sync work left
2026-10-01 08:53:11 +02:00
Jakub Zych
d9f187ae39 docs(11.1): create phase plan 2026-10-01 01:52:52 +02:00
Jakub Zych
209e44cfd7 docs(11.1): add a resume point after Task 3 to plan 11.1-07
Tasks 1 to 3 record their commits, Deviation: body lines and a
state.record-session line naming PLAN_BASE, so Tasks 4 and 5 can resume
in a fresh context. Their read_first lists now name only the symbols and
helpers they use. The plan stays single and autonomous.
2026-10-01 01:51:47 +02:00
Jakub Zych
f78a677eb2 docs(11.1): add gap closure plan 11.1-07 for fail-open docs checkers 2026-10-01 01:46:28 +02:00
Jakub Zych
ad982774ca docs(phase-11.1): revert premature Complete requirements after gaps found 2026-10-01 01:09:15 +02:00
Jakub Zych
d4a9336110 docs(11.1): add phase verification report (gaps found) 2026-10-01 01:09:14 +02:00
Jakub Zych
8c4d02de0a docs(11.1): record code review disposition 2026-10-01 00:34:40 +02:00
Jakub Zych
1b1132fa62 docs(11.1): add code review report 2026-10-01 00:34:31 +02:00
Jakub Zych
7ede3e03b3 docs(11.1-06): record the gate cleanup fix in the plan summary 2026-10-01 00:23:43 +02:00
Jakub Zych
f2413f6c87 docs(11.1-06): complete the unit tests and final gate plan 2026-10-01 00:18:11 +02:00
Jakub Zych
9419d5d5e7 docs(11.1-06): validate the phase 11.1 verification map
- every per-task row of plans 01 to 06 ran green on 2026-10-01
- status validated, nyquist_compliant and wave_0_complete true
- search and dark mode stay as manual UAT rows for /gsd-verify-work
2026-10-01 00:15:35 +02:00
Jakub Zych
4c68d31862 docs(11.1-05): record plan 05 progress in state, roadmap and requirements 2026-09-30 23:44:10 +02:00
Jakub Zych
0223e39b2c docs(11.1-05): complete the acme/blog porting walkthrough plan 2026-09-30 23:43:45 +02:00
Jakub Zych
4e05450f46 docs(11.1-05): log the scaffolder gaps found while porting the walkthrough
- same-second migrations sort by name and can run out of order
- make:admin-controller output does not boot and names the model after
  the controller
- the DO NOT EDIT header on editable files, and commands that cannot reach
  the application
2026-09-30 23:41:26 +02:00
Jakub Zych
4e83d06025 docs(11.1-04): complete framework content B plan 2026-09-30 23:20:20 +02:00
Jakub Zych
f7dfe68707 docs(11.1-04): log lagoon gaps found while writing the Database pages
- lagoon.Validate reports numeric min failures with the max message
- the lagoon README callback example sorts after the after-commit flush,
  and the pivot Preload ordering claim does not hold
2026-09-30 22:59:30 +02:00
Jakub Zych
69dd5764bb test(11): persist human verification items as UAT 2026-09-30 22:30:48 +02:00
Jakub Zych
468f40108f docs(11): verify gap closure 2026-09-30 22:30:43 +02:00
Jakub Zych
c6f6bdfcb8 docs(11): update code review report 2026-09-30 22:24:17 +02:00
Jakub Zych
93c735b8a2 fix(11-08): make transaction gates fail closed 2026-09-30 22:24:12 +02:00
Jakub Zych
4d7823984e docs(11.1-03): update state, roadmap and requirements after plan 03 2026-09-30 22:18:45 +02:00