Commit Graph

227 Commits

Author SHA1 Message Date
Jakub Zych
f1077382f5 docs(11-02): complete scheduler plan 2026-09-29 22:54:28 +02:00
Jakub Zych
144c54bb2c docs(11-01): complete conga job framework plan 2026-09-29 15:27:29 +02:00
Jakub Zych
718a35caba docs(11): create phase plan 2026-09-29 14:34:06 +02:00
Jakub Zych
d9b951fe29 docs(11): map phase patterns 2026-09-29 13:40:53 +02:00
Jakub Zych
9dabc6c5a1 docs(phase-11): add validation strategy 2026-09-29 12:32:56 +02:00
Jakub Zych
c82950c2a6 docs(11): research phase domain 2026-09-29 12:32:02 +02:00
Jakub Zych
0bbbce6d27 docs(10.1): record code review disposition 2026-09-29 10:10:45 +02:00
Jakub Zych
c0d16eccc1 docs(10.1): add code review fix report 2026-09-29 10:10:44 +02:00
Jakub Zych
74e30c9878 test(10.1): persist human verification items as UAT 2026-09-29 03:37:38 +02:00
Jakub Zych
29433f3c40 docs(10.1): record code review disposition 2026-09-29 03:29:52 +02:00
Jakub Zych
9f6b5a5706 docs(10.1): add code review report 2026-09-29 03:29:41 +02:00
Jakub Zych
0ddf7f8f68 docs(10.1-04): complete unit tests, gate and security evidence plan 2026-09-29 03:14:47 +02:00
Jakub Zych
bbceeb957f docs(10.1-04): record the Phase 10.1 security review and validation map
- 10.1-SECURITY-REVIEW.md: T-10.1-01 to T-10.1-22 and T-10.1-SC with
  mitigation, test or gate stage, observed result and 23 removal checks
- 10.1-VALIDATION.md: every plan task mapped to its command, all green
  under check-phase10.1.sh --all; nyquist_compliant and wave 0 complete
- Phase 10 deferred item for the parity failures marked resolved
2026-09-29 03:13:18 +02:00
Jakub Zych
29336a58ce docs(10.1-03): complete Albums extension proof plan 2026-09-29 02:28:40 +02:00
Jakub Zych
9d23ac5832 docs(11.2): capture phase context
Four repos (sm-summercms-app, vue-summercms-app, sm-summercms-plugin,
sm-newsletter-plugin), Nuxt 4 static site in EN and PL embedded in the
binary, double opt-in signup with honeypot, consent and neutral
responses, and a standalone sending-ready subscribers table.
2026-09-29 02:24:10 +02:00
Jakub Zych
55c47ca3bc docs(10.1-02): complete SPA extension seams plan 2026-09-29 02:15:15 +02:00
Jakub Zych
484eeb989b docs(roadmap): insert phase 11.2 ready-to-share website and newsletter plugin
Adds Phase 11.2 after 11.1: the sm-summercms-app root with a
vue-summercms-app website, an sm-newsletter-plugin stub ported from
Golem15.Newsletter with double opt-in signup, and the 11.1 docs served
at /docs. Records the sm- repo naming convention.
2026-09-29 02:14:35 +02:00
Jakub Zych
2325d80ecb docs(10.1-01): complete framework Go extension point plan 2026-09-28 23:54:08 +02:00
Jakub Zych
9b98d8409f docs(10.1): record D-18/D-19, resolve research questions, add pattern map
Plan checker iteration 1 flagged unresolved research questions and a
missing decision note for golang.org/x/net/html. D-18 approves x/net/html
for the partial sanitizer; D-19 fixes the Discogs widget fill to
[year, format]. STATE marks the phase ready to execute.
2026-09-28 22:44:34 +02:00
Jakub Zych
ccdc014078 docs(10.1): create phase plans for the runtime admin extension point
Four plans: framework Go contracts and routes, framework SPA hosts,
Albums proof in fonoteka.go, and unit tests with the phase gate.
Adds ADMIN-07 to REQUIREMENTS.md and fills the Phase 10.1 roadmap goal,
success criteria and plan list.
2026-09-28 22:25:50 +02:00
Jakub Zych
04c587a5a3 docs(11.1): UI design contract 2026-09-28 22:25:34 +02:00
Jakub Zych
bf61acada1 docs(11.1): insert documentation phase with context and validation strategy 2026-09-28 20:22:59 +02:00
Jakub Zych
09c1ade9a9 docs(11.1): research documentation phase domain 2026-09-28 18:20:42 +02:00
Jakub Zych
b2845e016b docs(10.1): approve UI design contract and resolve state gaps 2026-09-28 16:54:41 +02:00
Jakub Zych
f4459ac7c2 docs(10.1): UI design contract 2026-09-28 16:12:25 +02:00
Jakub Zych
e51be3529e docs(phase-10.1): add validation strategy 2026-09-28 15:56:27 +02:00
Jakub Zych
4e7f0e09d1 docs(10.1): research runtime admin extension point 2026-09-28 15:56:27 +02:00
Jakub Zych
cc584e906e docs(phase-10.2): complete phase execution 2026-09-28 14:13:20 +02:00
Jakub Zych
4dc4c05722 docs(10.2): record UI audit applicability 2026-09-28 13:41:39 +02:00
Jakub Zych
da6f0b2eff docs(phase-10.2): add security threat verification 2026-09-28 13:39:14 +02:00
Jakub Zych
02712ad651 docs(phase-10.2): add validation strategy 2026-09-28 13:38:09 +02:00
Jakub Zych
961bfd2749 docs(10.2): record code review disposition 2026-09-28 13:35:33 +02:00
Jakub Zych
c56561374c docs(10.2): add code review report 2026-09-28 13:31:19 +02:00
Jakub Zych
957625e00e docs(10.2-02): complete framework onboarding plan 2026-09-28 13:23:50 +02:00
Jakub Zych
1c2f44ae83 docs(10.2-01): summarize modules migration 2026-09-28 13:03:41 +02:00
Jakub Zych
a9a7bbef73 fix(10.2): revise plans based on checker feedback 2026-09-28 01:56:53 +02:00
Jakub Zych
039cfeddfd docs(10.2): create phase plan 2026-09-28 01:46:23 +02:00
Jakub Zych
4f2358e26c docs(12): capture phase context 2026-09-28 01:28:25 +02:00
Jakub Zych
17250cfbd6 docs(10.1): capture phase context 2026-09-28 00:54:55 +02:00
Jakub Zych
be8bfccf98 docs(11): capture phase context 2026-09-28 00:54:36 +02:00
Jakub Zych
7ac75b918d test(09): persist human verification items as UAT 2026-09-28 00:03:21 +02:00
Jakub Zych
2ad19bda21 docs(09): record code review disposition 2026-09-27 23:52:18 +02:00
Jakub Zych
ee79c7f2c9 docs(09): add code review report 2026-09-27 23:51:58 +02:00
Jakub Zych
35f55c733d docs(10): re-verify phase after CR-01 fix 2026-09-27 20:45:11 +02:00
Jakub Zych
c7487f6799 docs(10): re-review CR-01 fix and record approved UAT 2026-09-27 20:38:18 +02:00
Jakub Zych
a405b1b7ff docs(quick-260927-q23): fix CR-01: /auth/refresh must enforce tokens_valid_after and is_activated 2026-09-27 19:12:05 +02:00
Jakub Zych
815cb903c6 test(10): persist human verification items as UAT 2026-09-27 18:44:38 +02:00
Jakub Zych
f47a560cc8 docs(10): add phase verification report 2026-09-27 18:44:23 +02:00
Jakub Zych
6918ec5998 docs(10): add code review report and disposition 2026-09-27 18:36:06 +02:00
Jakub Zych
3bdf6c9301 docs(10-05): complete unit tests, assembled acceptance and phase gate plan 2026-09-27 18:23:44 +02:00