- 10.1-SECURITY-REVIEW.md: T-10.1-01 to T-10.1-22 and T-10.1-SC with
mitigation, test or gate stage, observed result and 23 removal checks
- 10.1-VALIDATION.md: every plan task mapped to its command, all green
under check-phase10.1.sh --all; nyquist_compliant and wave 0 complete
- Phase 10 deferred item for the parity failures marked resolved
Four repos (sm-summercms-app, vue-summercms-app, sm-summercms-plugin,
sm-newsletter-plugin), Nuxt 4 static site in EN and PL embedded in the
binary, double opt-in signup with honeypot, consent and neutral
responses, and a standalone sending-ready subscribers table.
Adds Phase 11.2 after 11.1: the sm-summercms-app root with a
vue-summercms-app website, an sm-newsletter-plugin stub ported from
Golem15.Newsletter with double opt-in signup, and the 11.1 docs served
at /docs. Records the sm- repo naming convention.
Plan checker iteration 1 flagged unresolved research questions and a
missing decision note for golang.org/x/net/html. D-18 approves x/net/html
for the partial sanitizer; D-19 fixes the Discogs widget fill to
[year, format]. STATE marks the phase ready to execute.
Four plans: framework Go contracts and routes, framework SPA hosts,
Albums proof in fonoteka.go, and unit tests with the phase gate.
Adds ADMIN-07 to REQUIREMENTS.md and fills the Phase 10.1 roadmap goal,
success criteria and plan list.
- 10-SECURITY-REVIEW.md: T-10-01..T-10-25 and T-10-SC with mitigation,
test or gate stage, observed result, residual risk and the removal
(mutation) checks behind every high threat
- 10-VALIDATION.md: executed task commands, gate statuses, Wave 0 done,
nyquist_compliant after scripts/check-phase10.sh --all passed