# Phase 08 Deferred Items Out-of-scope discoveries logged during plan execution, per the executor's scope-boundary rule (fix only what the current task's changes directly caused). ## 08-03: pre-existing full-schema rollback test failures (not caused by this plan) **Found during:** 08-03 Task 2 full-suite verification (`go test ./...` in `fonoteka.go`). **Failing tests:** `TestRemainingMigrationsUpDown` (`parity/remaining_models_test.go`), `TestRollbackIsolatesFonotekaFullSchema` (`parity/rollback_isolation_full_test.go`). **Symptom:** both tests assert the *last* fonoteka migration is `create_fonoteka_settings` (a Phase 5 migration) and/or that a full up/down/up cycle leaves no tables behind. Since 08-02 added `202609230019_oauth_schema_correction.go` (the corrective OAuth nullability/index migration, 08-02-SUMMARY.md), that migration is now the last one in the registered slice, so the hardcoded "last migration" name assertion is stale, and rollback of the corrected schema leaves `golem15_fonoteka_settings` behind. **Scope:** neither test file, nor `plugins/golem15/fonoteka/updates/`, nor any model file is in 08-03's `files_modified` list; this plan (authorize) touches `wristband/authorize.go`, `wristband/server.go` (Options extension), `plugin.go`, and `routes.go` only. Confirmed pre-existing via `git log` on the failing test files: both were last touched by Phase 5 (`6c9695f`), and 08-02's migration-correction commit (`4536b3e`) is what shifted the "last migration" identity without updating these two tests. **Disposition:** deferred to whichever later Phase 8 plan owns migration/ schema test maintenance (or the phase-closing unit-test plan). Not fixed here per the executor's scope-boundary rule. ## 08-03: pre-existing flaky test in an unrelated package (summercms.go) **Found during:** 08-03 Task 2 full-suite verification (`go test ./...` in `summercms.go`). **Failing test:** `TestFetchTooLargeIsStreaming` (`fetchguard/fetch_test.go`), intermittently fails with "server wrote 71680 bytes, client appears to have buffered unbounded body" under `go test ./...` but passes reliably when run in isolation (`go test ./fetchguard -run TestFetchTooLargeIsStreaming -count=3`). `fetchguard` is untouched by this plan. Not fixed here. **Resolution (orchestrator, after 08-03):** fixed in `fonoteka.go` commit `f9b23e1` (`fix(08-03): update parity migration tests for the oauth schema correction head`). Five parity tests (`TestMigrateSeedsCanonicalGenres`, `TestAlbumSliceMigrationsUpDown`, `TestSecretsSliceMigrationsUpDown`, `TestRemainingMigrationsUpDown`, `TestRollbackIsolatesFonotekaFullSchema`) now expect `202609230019_oauth_schema_correction` as the head and walk one extra table-less rollback step. `go test ./...` in the `fonoteka.go` root module is green again. ## Pre-existing flake: `fetchguard.TestFetchTooLargeIsStreaming` (summercms.go) **Found during:** post-wave test gates after 08-03. **Symptom:** fails intermittently only under a full parallel `go test ./...` run; passes on every isolated run (`-count=5`) and every package-level run (`-count=3`). Last touched in Phase 6 (`e50e2dd`); no Phase 8 plan modifies `fetchguard`. Timing-sensitive streaming assertion under load. Not a Phase 8 regression; left for a later hardening pass. **Resolution (orchestrator, after 08-05):** the flake tripped the post-wave gate on two of three full runs, so it was fixed in `summercms.go` commit `test(fetchguard): widen streaming-cap ceiling to stop flake under parallel runs`. The ceiling moved from 64 KiB to 1 MiB; the assertion still proves the client does not buffer an unbounded body (the handler would reach 8 MiB). ## Follow-up: Playwright UI matrix for scripts/check-phase8-ui.mjs --final-gate **Found during:** 08-10 Task 3, the sole real execution of `scripts/check-phase8.sh` (2026-09-24). **What is missing:** `scripts/check-phase8-ui.mjs`'s `--final-gate` mode (`runFinalGate()`, `scripts/check-phase8-ui.mjs:436-459`) runs `verify:oauth-return-path` and `verify:oauth-i18n` for real, then reaches a deliberate `fatal('--final-gate Playwright matrix wiring is 08-10's responsibility; not implemented in 08-05.')` at line 458. The 32-scenario `SCENARIOS` catalog (08-UI-SPEC.md's complete state/accessibility/ responsive/i18n matrix) is fully authored and self-tested for completeness by `--contract-self-test`, but no Playwright spec file consumes it and no Playwright config exists to run one. Specifically still needed: - A Playwright config and spec file living outside the `vue-fonoteka-app` Nuxt checkout (08-UI-SPEC.md's Non-Redesign Rule: this harness must never write inside the Nuxt checkout or add a registry component there), that imports/consumes the versioned `SCENARIOS` catalog already in `check-phase8-ui.mjs` so the spec and the scenario data cannot drift apart. - `NUXT_DEV_BACKEND_ORIGIN` (or an equivalent env var) wired from the spec's Playwright config to the ephemeral Go app `scripts/check-phase8.sh` boots for the gate run, so the real Nuxt dev/preview server the Playwright browser drives talks to the disposable gate backend instead of a developer's local backend. - A real login through the assembled Go backend (not a mocked network response) for every scenario that is not explicitly declared network-intercepted in the `SCENARIOS` catalog (see the catalog's own `no-request` / `redirect-to-login-with-return` scenarios, which assert the *absence* of a network call and must stay mocked). - DOM assertions against `app/pages/connect.vue`, `app/components/fonoteka/ConsentScopePicker.vue`, and `app/components/fonoteka/ConnectedAppsManager.vue` (the three guarded Nuxt source files `check-phase8-ui.mjs` hashes at `scripts/check-phase8-ui.mjs:57-59`), selected via their existing `data-testid` attributes, matching each scenario's expected state. **Failing identifier:** `scripts/check-phase8-ui.mjs --final-gate` -> stage `stage_ui_harness` (`scripts/check-phase8.sh:426-431`) -> fatal message `--final-gate Playwright matrix wiring is 08-10's responsibility; not implemented in 08-05.` (`scripts/check-phase8-ui.mjs:458`). **Disposition:** the user approved closing Phase 8 on 2026-09-24 with this gap carried forward as a named follow-up ("Approve, carry gap forward" — 08-10 Task 3 checkpoint decision). Every other `scripts/check-phase8.sh` stage ran green in that same gate execution: docker preflight, Postgres, app boot, the real unchanged `fonoteka-mcp` lifecycle (discovery, DCR, PKCE authorize, JWT consent, token, tool call, refresh, replay, revoke), both repositories' vet/test/race, the 169/169 parity corpus, the secret scan, the 6/6 OAuth return-path checks, the 74-key i18n check, the unchanged-client diff, and the security review (11/11 threats closed, 0 open). The gate script must keep failing closed on `stage_ui_harness` until the Playwright spec above exists -- do not weaken, skip, or stub that stage to close this gap. Whichever future plan authors the spec should also flip 08-VALIDATION.md's 08-W0-08 row and `nyquist_compliant` back to fully green.