Project State

Project Reference

See: .planning/PROJECT.md (updated 2026-09-16)

Core value: An existing WinterCMS-shaped app can be ported plugin by plugin to a single Go binary without its frontend noticing: the PHP version's API contract is the acceptance test. Current focus: Phase 02 — api-parity-harness-bootstrap

Current Position

Phase: 02 (api-parity-harness-bootstrap) — EXECUTING Plan: 4 of 5 Status: Ready to execute Last activity: 2026-09-17

Progress: [████████░░] 78%

Performance Metrics

Velocity:

  • Total plans completed: 7
  • Average duration: 17 min
  • Total execution time: 80 min

By Phase:

Phase Plans Total Avg/Plan
01 4 - -
02 3 80 min 27 min

Recent Trend:

  • Last 5 plans: 02-01 7 min, 02-02 12 min, 02-03 61 min
  • Trend: -

Updated after each plan completion

Accumulated Context

Roadmap Evolution

  • Phase 2 edited: edited fields: depends_on (Phase 1), goal (summer parity:* on bonfire, no longer a parallel workstream)

Decisions

Decisions are logged in PROJECT.md Key Decisions table. Recent decisions affecting current work:

  • Roadmap: gormigrate (not goose) is the migration tool, per STACK.md's more recent reasoning — ARCHITECTURE.md/PITFALLS.md text still says goose in places; treat gormigrate as authoritative when phases 3 and 5 are planned.
  • Roadmap: two repos from day one — summercms.go (framework, no app knowledge) and fonoteka.go (sibling app repo, go.work workspace of plugins). Every phase states which repo(s) it writes to.
  • Roadmap: the parity harness (Phase 2) and the first vertical slice (Phase 3) are sequenced immediately after kernel foundation, ahead of any further kernel broadening, to avoid the documented Scala-era bottom-up-kernel failure mode.
  • [Phase 02]: tide is the framework-owned parity library and does not import Fonoteka — Phase 2 CONTEXT.md discretion; summercms.go must stay app-agnostic
  • [Phase 02]: goccy/go-yaml v1.19.2 decodes fixtures with DisallowUnknownField; SaveFlow uses a dedicated encoder so nested literal bodies keep indent — goccy BytesMarshaler re-emitted |- scalars without nested indent; decode still uses the verified library
  • [Phase 02]: JSON diffs ignore object key order and fail missing keys or token-type changes at $.path; non-JSON compares bytes at offset — D-13: structural JSON compare with UseNumber, exact bytes for non-JSON
  • [Phase 02]: Proxy bind and upstream must be loopback HTTP; incoming Host/URL never selects the origin — T-02-01: pin PHP upstream, ignore client destination, cap bodies
  • [Phase 02]: Capture rules and a private 0600 --vars store drive {{name}} substitution; unclassified credential shapes fail fixture writes — D-07 D-11 and T-02-02: never commit live JWT, inv_ tokens, OAuth codes or PKCE verifiers
  • [Phase 02]: Carbon *_at values must match +00:00 before masking; Z, string ids, null vs [] and missing keys fail at $.path — D-13 D-15: assert shape before mask so parity classes stay visible
  • [Phase 02]: 154 is the app manifest validated route count, not a framework constant; --next-batch above 15 is refused — D-16 and the 15-route resume workflow; keep tide generic
  • [Phase 02]: Isolated PHP uses a parity-named SQLite file on 127.0.0.1:8423; record/reset refuse any other DB — T-02-05
  • [Phase 02]: Client OAuth replay merges /tmp/summercms-parity/pkce.vars after seed; the verifier is not in git — D-07 D-11

Pending Todos

None yet.

Blockers/Concerns

  • Phase 8 (OAuth2.1) needs a pre-planning check of wavepath.org/plugins/golem15/oauthserver to resolve whether ClientCredentialsStorage/TokenExchangeStorage are needed — flagged in research/SUMMARY.md Gaps, unresolved.
  • Phase 9 (admin schema pipeline / relation manager) is the least-precedented design surface in the research — plan with --research-phase.
  • Phase 11 (River dual-driver split) is documented but unverified against a real build — plan with --research-phase and budget a timed-latency test.

Deferred Items

Items acknowledged and carried forward from previous milestone close:

Category Item Status Deferred At
(none — first milestone)

Session Continuity

Last session: 2026-09-17T11:47:35.029Z Stopped at: Completed 02-03-PLAN.md Resume file: None