3.0 KiB
gsd_state_version, milestone, milestone_name, status, stopped_at, last_updated, last_activity, progress
| gsd_state_version | milestone | milestone_name | status | stopped_at | last_updated | last_activity | progress | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.0 | v1.0 | milestone | ready_to_plan | Phase 01 complete (4/4) — ready to discuss Phase 02 | 2026-09-16T12:44:56.877Z | 2026-09-16 -- Phase 01 execution started |
|
Project State
Project Reference
See: .planning/PROJECT.md (updated 2026-09-16)
Core value: An existing WinterCMS-shaped app can be ported plugin by plugin to a single Go binary without its frontend noticing: the PHP version's API contract is the acceptance test. Current focus: Phase 02 — api parity harness bootstrap
Current Position
Phase: 02 Plan: Not started Status: Ready to plan Last activity: 2026-09-16
Progress: [█░░░░░░░░░] 7%
Performance Metrics
Velocity:
- Total plans completed: 4
- Average duration: -
- Total execution time: 0 hours
By Phase:
| Phase | Plans | Total | Avg/Plan |
|---|---|---|---|
| 01 | 4 | - | - |
Recent Trend:
- Last 5 plans: -
- Trend: -
Updated after each plan completion
Accumulated Context
Roadmap Evolution
- Phase 2 edited: edited fields: depends_on (Phase 1), goal (summer parity:* on bonfire, no longer a parallel workstream)
Decisions
Decisions are logged in PROJECT.md Key Decisions table. Recent decisions affecting current work:
- Roadmap: gormigrate (not goose) is the migration tool, per STACK.md's more recent reasoning — ARCHITECTURE.md/PITFALLS.md text still says goose in places; treat gormigrate as authoritative when phases 3 and 5 are planned.
- Roadmap: two repos from day one —
summercms.go(framework, no app knowledge) andfonoteka.go(sibling app repo, go.work workspace of plugins). Every phase states which repo(s) it writes to. - Roadmap: the parity harness (Phase 2) and the first vertical slice (Phase 3) are sequenced immediately after kernel foundation, ahead of any further kernel broadening, to avoid the documented Scala-era bottom-up-kernel failure mode.
Pending Todos
None yet.
Blockers/Concerns
- Phase 8 (OAuth2.1) needs a pre-planning check of
wavepath.org/plugins/golem15/oauthserverto resolve whetherClientCredentialsStorage/TokenExchangeStorageare needed — flagged in research/SUMMARY.md Gaps, unresolved. - Phase 9 (admin schema pipeline / relation manager) is the least-precedented design surface in the research — plan with
--research-phase. - Phase 11 (River dual-driver split) is documented but unverified against a real build — plan with
--research-phaseand budget a timed-latency test.
Deferred Items
Items acknowledged and carried forward from previous milestone close:
| Category | Item | Status | Deferred At |
|---|---|---|---|
| (none — first milestone) |
Session Continuity
Last session: 2026-09-16T10:47:33.084Z Stopped at: Phase 2 context gathered Resume file: .planning/phases/02-api-parity-harness-bootstrap/02-CONTEXT.md