- deploy log: after-tags, production in 33-14 (no separate uat since the
2026-10-31 cutover), the en and Additional addresses steps confirmed at
the 33-14 release checkpoint, the production check list
- summary with the rehearsal, head diff and self-check
- deferred items: the demo moves to prefix_except_default (decided)