913 B
913 B
status, phase, source, started, updated
| status | phase | source | started | updated | |
|---|---|---|---|---|---|
| partial | 01-framework-kernel-foundation |
|
2026-09-16T12:39:17Z | 2026-09-16T12:39:17Z |
Current Test
[awaiting human testing]
Tests
1. Interactive terminal rendering
expected: Run ./bin/hello greeter:hello and one tool command (summer make:plugin --help or a spinner-using command) in a real TTY. Braille spinner / box-drawing table / colored status glyphs appear; prompts are interactive. NO_COLOR=1 or TERM=dumb removes ANSI.
result: [pending]
2. Rebuild feel under summer dev
expected: In examples/hello, run go run ../../cmd/summer dev, edit plugins/greeter/plugin.go, and watch the terminal. A rebuild: <duration> line prints, the child restarts, and generated main.go / plugins.gen.go writes do not loop.
result: [pending]
Summary
total: 2 passed: 0 issues: 0 pending: 2 skipped: 0 blocked: 0