- 13-SECURITY-REVIEW.md: every T-13 threat with its strictest severity and
disposition, protecting code, named tests and the 31 removal checks,
all failing as required; the CSV export logging fix and the Phase 9
route inventory update
- 13-VALIDATION.md: per-task map 13-01-T1 to 13-06-T3 all green, the gate
command, coverage per package, Wave 0 ticked, status validated
- REQUIREMENTS.md: API-03, API-04, API-06 and API-07 complete
- deferred-items.md: 13-06 findings (process-wide job dispatcher, scalar
mapping body, tmpfs quota)