Files
summercms/.planning
Jakub Zych 931c02db31 docs(13-06): sign off the Phase 13 security review and validation
- 13-SECURITY-REVIEW.md: every T-13 threat with its strictest severity and
  disposition, protecting code, named tests and the 31 removal checks,
  all failing as required; the CSV export logging fix and the Phase 9
  route inventory update
- 13-VALIDATION.md: per-task map 13-01-T1 to 13-06-T3 all green, the gate
  command, coverage per package, Wave 0 ticked, status validated
- REQUIREMENTS.md: API-03, API-04, API-06 and API-07 complete
- deferred-items.md: 13-06 findings (process-wide job dispatcher, scalar
  mapping body, tmpfs quota)
2026-10-03 11:43:39 +02:00
..