Files
summercms/.planning/phases/06-http-routing-auth-groups-and-rate-limiting/06-06-SUMMARY.md

5.3 KiB

phase, plan, subsystem, tags, requires, provides, affects, tech-stack, key-files, key-decisions, patterns-established, requirements-completed, duration, completed
phase plan subsystem tags requires provides affects tech-stack key-files key-decisions patterns-established requirements-completed duration completed
06-http-routing-auth-groups-and-rate-limiting 06 api-security
rate-limiting
middleware-order
personal-token
security-review
httptest
phase provides
06-http-routing-auth-groups-and-rate-limiting inv_token guard, InvScope, FixedWindowLimiter, fonoteka-api-token bucket, assembled route tests
personal-token route order that rate-limits unauthenticated deny traffic before InvScope
assembled-router proof of 401 through request 60 and exact 429 on request 61
T-06-21 and T-06-22 security evidence with 21 threats closed and zero open
phase-07-user-plugin
phase-08-oauth
personal-token-routes
security-review
added patterns
personal-token middleware order is inv_token -> throttle:<bucket> -> inv.scope:<scope>
deny-path limiter regressions use one fresh surf.Assemble handler and stable RemoteAddr
created modified
plugins/golem15/fonoteka/routes.go
plugins/golem15/fonoteka/routes_isolation_test.go
.planning/phases/06-http-routing-auth-groups-and-rate-limiting/06-SECURITY-REVIEW.md
Keep inv_token outermost so valid credentials populate bouncer.Credential before the limiter selects tok:<id>
Place throttle before InvScope so missing and invalid credentials consume the per-IP deny-path budget
Any live route combining inv_token, a named throttle, and inv.scope declares them in that exact source order
Rate-limit exhaustion tests exercise the real plugin set and production route rather than hand-composed middleware
HTTP-04
1h 29m 2026-09-20

Phase 6 Plan 06: Personal-token deny-path rate-limit gap closure Summary

Personal-token genres now preserves per-token keying while bounding unauthenticated 401 traffic at 60 requests per minute, with assembled-route and security-review evidence

Performance

  • Duration: 1h 29m
  • Started: 2026-09-20T10:01:25Z
  • Completed: 2026-09-20T11:30:57Z
  • Tasks: 2
  • Files modified: 3

Accomplishments

  • Reordered the live personal-token genres middleware to inv_token, throttle:fonoteka-api-token, inv.scope:read, preserving valid-token tok:<id> keys while limiting unauthenticated fallback traffic by client IP.
  • Added TestPersonalTokenGenresUnauthenticatedRequestsAreRateLimited, which drives 61 same-IP requests through one fresh handler returned by surf.Assemble: requests 1-60 retain the PHP-compatible 401 body and request 61 receives the exact 429 body and exhausted-limit headers.
  • Extended 06-SECURITY-REVIEW.md through Plan 06-06 with T-06-21/T-06-22, 21 closed threats, zero open, and no new accepted risk.
  • Passed the targeted regression, go vet ./..., and repository-wide go test ./... -short in fonoteka.go.

Task Commits

Each task was committed atomically:

  1. Task 1: Repair personal-token middleware order and prove deny-path throttling - 33f721d (fix, fonoteka.go)
  2. Task 2: Extend the Phase 6 security review through gap closure - 3423da2 (docs, summercms.go)

Plan metadata: (this commit)

Files Created/Modified

  • plugins/golem15/fonoteka/routes.go - Declares the live personal-token middleware in credential, limiter, then scope order.
  • plugins/golem15/fonoteka/routes_isolation_test.go - Proves the assembled production route returns 401 through request 60 and exact 429 on request 61.
  • .planning/phases/06-http-routing-auth-groups-and-rate-limiting/06-SECURITY-REVIEW.md - Maps T-06-21/T-06-22 to the runtime-order invariant and regression evidence.

Decisions Made

  • inv_token remains before the limiter so valid credentials populate bouncer.Credential before the bucket closure resolves tok:<id>.
  • throttle:fonoteka-api-token remains before inv.scope:read so missing and invalid credentials consume the per-IP fallback bucket before the scope gate returns 401.

Deviations from Plan

None - plan executed exactly as written.

Issues Encountered

  • The delegated executor stopped returning progress after partially editing the sibling fonoteka.go repository. After the configured stall threshold and user-approved recovery, execution switched inline; the partial diff was inspected, retained, validated, and committed without duplication.
  • The sandboxed full test run could not access the Docker daemon used by the parity harness. The same required command passed after rerunning with approved Docker access.

User Setup Required

None - no external service configuration required.

Next Phase Readiness

  • HTTP-04's verification blocker and code-review CR-01 are directly closed.
  • Phase 6 is ready for re-verification; no Plan 06-06 implementation blockers remain.

Self-Check: PASSED

  • FOUND: ../fonoteka.go/plugins/golem15/fonoteka/routes.go
  • FOUND: ../fonoteka.go/plugins/golem15/fonoteka/routes_isolation_test.go
  • FOUND: .planning/phases/06-http-routing-auth-groups-and-rate-limiting/06-SECURITY-REVIEW.md
  • FOUND: 33f721d in fonoteka.go
  • FOUND: 3423da2 in summercms.go
  • PASS: targeted assembled-router regression
  • PASS: go vet ./... in fonoteka.go
  • PASS: go test ./... -short in fonoteka.go
  • PASS: T-06-21/T-06-22 evidence and audit total 21 closed / 0 open

Phase: 06-http-routing-auth-groups-and-rate-limiting Completed: 2026-09-20