| 06-http-routing-auth-groups-and-rate-limiting | 06 | api-security |
|
|
|
|
|
|
|
|
|
1h 29m | 2026-09-20 |
Phase 6 Plan 06: Personal-token deny-path rate-limit gap closure Summary
Personal-token genres now preserves per-token keying while bounding unauthenticated 401 traffic at 60 requests per minute, with assembled-route and security-review evidence
Performance
- Duration: 1h 29m
- Started: 2026-09-20T10:01:25Z
- Completed: 2026-09-20T11:30:57Z
- Tasks: 2
- Files modified: 3
Accomplishments
- Reordered the live personal-token genres middleware to
inv_token,throttle:fonoteka-api-token,inv.scope:read, preserving valid-tokentok:<id>keys while limiting unauthenticated fallback traffic by client IP. - Added
TestPersonalTokenGenresUnauthenticatedRequestsAreRateLimited, which drives 61 same-IP requests through one fresh handler returned bysurf.Assemble: requests 1-60 retain the PHP-compatible 401 body and request 61 receives the exact 429 body and exhausted-limit headers. - Extended
06-SECURITY-REVIEW.mdthrough Plan 06-06 with T-06-21/T-06-22, 21 closed threats, zero open, and no new accepted risk. - Passed the targeted regression,
go vet ./..., and repository-widego test ./... -shortinfonoteka.go.
Task Commits
Each task was committed atomically:
- Task 1: Repair personal-token middleware order and prove deny-path throttling -
33f721d(fix, fonoteka.go) - Task 2: Extend the Phase 6 security review through gap closure -
3423da2(docs, summercms.go)
Plan metadata: (this commit)
Files Created/Modified
plugins/golem15/fonoteka/routes.go- Declares the live personal-token middleware in credential, limiter, then scope order.plugins/golem15/fonoteka/routes_isolation_test.go- Proves the assembled production route returns 401 through request 60 and exact 429 on request 61..planning/phases/06-http-routing-auth-groups-and-rate-limiting/06-SECURITY-REVIEW.md- Maps T-06-21/T-06-22 to the runtime-order invariant and regression evidence.
Decisions Made
inv_tokenremains before the limiter so valid credentials populatebouncer.Credentialbefore the bucket closure resolvestok:<id>.throttle:fonoteka-api-tokenremains beforeinv.scope:readso missing and invalid credentials consume the per-IP fallback bucket before the scope gate returns 401.
Deviations from Plan
None - plan executed exactly as written.
Issues Encountered
- The delegated executor stopped returning progress after partially editing the sibling
fonoteka.gorepository. After the configured stall threshold and user-approved recovery, execution switched inline; the partial diff was inspected, retained, validated, and committed without duplication. - The sandboxed full test run could not access the Docker daemon used by the parity harness. The same required command passed after rerunning with approved Docker access.
User Setup Required
None - no external service configuration required.
Next Phase Readiness
- HTTP-04's verification blocker and code-review CR-01 are directly closed.
- Phase 6 is ready for re-verification; no Plan 06-06 implementation blockers remain.
Self-Check: PASSED
- FOUND:
../fonoteka.go/plugins/golem15/fonoteka/routes.go - FOUND:
../fonoteka.go/plugins/golem15/fonoteka/routes_isolation_test.go - FOUND:
.planning/phases/06-http-routing-auth-groups-and-rate-limiting/06-SECURITY-REVIEW.md - FOUND:
33f721dinfonoteka.go - FOUND:
3423da2insummercms.go - PASS: targeted assembled-router regression
- PASS:
go vet ./...infonoteka.go - PASS:
go test ./... -shortinfonoteka.go - PASS: T-06-21/T-06-22 evidence and audit total 21 closed / 0 open