- summary with the v0.1.3 tag, gate times and contract names - deferred item for two application inventory tests - WINDOWS entry 9 fixed: RecordActions.vue is mounted
1.6 KiB
1.6 KiB
Phase 12.1 deferred items
Deferred Items
- Two inventory tests of the application's fonoteka plugin module fail against the framework at v0.1.3
status: open
Found: plan 12.1-02 Task 6, 2026-10-05, by running
go -C ../fonoteka.go/plugins/golem15/fonoteka test ./... -count=1in addition to the plan's gate. What:TestPhase09SecurityRoutes(admin_phase09_security_test.go) reports the two plan 01 routesPOST .../{controller}/bulk/{action}andPOST .../{controller}/{id}/actions/{action}as unexpected, because the fixed listphase09AdminRoutesdoes not name them.TestPhase10ControllerCopy(admin_phase10_copy_test.go) compares the list messages with the fixed listphase10ListMessageKeys, which lacksrowStateDeleted,rowStateNegativeandrowStateDisabled; its form half was not reached and may needpreviewandeditthe same way. Why not fixed here: the fix is two fixed lists in the application repository (fonoteka.go); plan 12.1-02 writes to summercms.go only. No framework change is needed, so the tagged commit is not affected. The same catch-up was done once before (549840d test(13-06): list the Phase 12.2 cabana admin routes in the Phase 9 route inventory). Why the gate missed it: the plan's application gatego -C ../fonoteka.go test ./... -count=1runs the root module only; the go.work plugin modules (plugins/golem15/{user,fonoteka,golem,feedback}) are separate modules and are not matched by./.... Suggested owner: plan 12.1-04 (it already writes the application's parity allow-list entry and submodule pointer) or plan 12.1-05's gate script, which should run every workspace module.