Files
summercms/.planning
Jakub Zych 9afe95ccef docs(35): revise gap-closure plans after plan check
- 35-07: record G-35-8 as framework-closed with the plugin part deferred
  (35-VALIDATION.md and a closure note in 35-UAT.md); scope the UAT test 8
  re-run to the built-in layouts; deferred plugin follow-up check
- 35-07: TestInlineCSS dangerous-URL fixture injected past save validation
- 35-06: examples/hello go.mod/go.sum in files_modified
- 35-05: T-35-31 wording matches the locale tag rule (pt-BR)
- 35-05/35-06: tracer tasks may land as green sub-commits
2026-11-13 16:46:05 +01:00
..