Files
summercms/.planning
Jakub Zych e1f489058c docs(19.7-09): deferred items for the gap closure
B-IN-05 (deferred, the shared confirm primitive), B-IN-06 (no fix
needed), the admin:token:revoke event, the OIDC decision (resolved), the
local go.work retarget, the demo pins, the release order with
PHASE197_RELEASED, the lenient link code parse and one offline-build
flake; the plan 05 test-commit entry is superseded by the release.
2026-10-23 18:55:37 +02:00
..