B-IN-05 (deferred, the shared confirm primitive), B-IN-06 (no fix needed), the admin:token:revoke event, the OIDC decision (resolved), the local go.work retarget, the demo pins, the release order with PHASE197_RELEASED, the lenient link code parse and one offline-build flake; the plan 05 test-commit entry is superseded by the release.