Files
summercms/.planning
Jakub Zych 3386cbef83 docs(19.4): defer PHP OIDC parity recording to the WavePath cutover
The user skipped the parity recording at 19.4-03 Task 5 and decided the
phase passes without it. D-14 in this phase is the fail-closed harness;
recording WavePath and a green replay move to the WavePath cutover phase
(todo 2026-10-19-record-php-oidc-parity-against-wavepath).
2026-10-19 20:26:05 +02:00
..