Phase 4 — Validation Strategy

Test Infrastructure

Property Value
Framework Go 1.27 testing; existing testcontainers-go convention for Docker integration
Config Root go.mod, go.work, and examples/hello/go.mod
Quick run go test ./internal/build ./cmd/summer ./phrasebook ./postcard -short after those packages exist
Full suite go vet ./... && go test ./... followed by focused Mailpit SMTP integration and go test -race ./internal/build ./phrasebook ./postcard
Estimated runtime Measure at implementation; require focused checks to stay under 60 seconds on a warm cache

Sampling Rate

  • After every task commit: run the affected package's focused test, or the generated-plugin build/vet test for scaffold changes.
  • After every plan wave: run root go vet ./... && go test ./... and, once generation exists, the temporary hello-plugin compile/vet test.
  • Before $gsd-verify-work: run the full suite including Mailpit SMTP receipt; Docker absence is a failure outside -short.
  • Maximum feedback latency: 60 seconds for focused tests on a warm cache; Mailpit starts only at the full gate.

Per-Task Verification Map

Task ID Plan Wave Requirement Threat Ref Secure Behavior Test Type Automated Command File Exists Status
To fill after PLAN.md creation — — CLI-02 T-04-01 Generated names and imports stay inside plugin module compile/integration go test ./internal/build ./cmd/summer ❌ W0 ⬜ pending
To fill after PLAN.md creation — — I18N-01 T-04-02 Malformed YAML/plurals fail boot with context unit go test ./phrasebook ❌ W0 ⬜ pending
To fill after PLAN.md creation — — I18N-03 T-04-03, T-04-04 Safe final HTML, explicit SMTP policy, driver errors propagated unit/integration go test ./postcard ❌ W0 ⬜ pending

Status: ⬜ pending · ✅ green · ❌ red · ⚠️ flaky

Wave 0 Requirements

  • Add an internal/build test that generates all six artifacts into a temporary copy of examples/hello and runs go build plus go vet there.
  • Add phrasebook fixture plugin assets for pl/en YAML, nested keys, map and pipe plurals, and fallback tests.
  • Add postcard memory-driver rendering tests, malicious-variable cases, and a Mailpit testcontainer fixture with SMTP and HTTP ports.

No new test framework is needed. These fixtures should be created by the first implementation task that uses them.

Manual-Only Verifications

All phase behaviors have automated verification. Production SMTP credentials and transport are deployment configuration, so the phase uses Mailpit for a real SMTP receipt without a live external account.

Validation Sign-Off

  • Every plan task has an automated <verify> command or a Wave 0 dependency.
  • No three consecutive tasks lack automated verification.
  • Generated plugin compiles and vets; pl/en catalog and Mailpit send pass.
  • No watch-mode flags in verification commands.
  • Fill task IDs and measured runtime after plans and implementation evidence exist.
  • Set nyquist_compliant: true only after the full gate passes.