* fix(#2786): skip sentinel phase ids in phase-complete stage 2 heading scan Stage 2 of the next-phase cascade accepted any higher-numbered roadmap heading without checking the 999.x backlog sentinel convention that stage 1 already checks. A Phase 999.1: Backlog Item heading was treated as the next real phase, advancing STATE.md into the backlog and making the milestone perpetually 'Ready to plan' instead of 'All phases complete'. Added isSentinelPhaseId(pm[1]) guard (mirrors stage 1's /^999(?:\.|$)/ check) so both sentinel ranges (0.x drafts, 999.x backlog) are skipped. * chore(#2786): backfill changeset PR number 3130 --------- Co-authored-by: sim <sim@local>
This commit is contained in:
5
.changeset/clever-ravens-romp.md
Normal file
5
.changeset/clever-ravens-romp.md
Normal file
@@ -0,0 +1,5 @@
|
||||
---
|
||||
type: Fixed
|
||||
pr: 3130
|
||||
---
|
||||
**`phase complete` no longer advances `next_phase` into 999.x backlog headings** — the roadmap heading scan (stage 2 of the next-phase cascade) accepted any higher-numbered heading without checking the sentinel convention, so a `Phase 999.1: Backlog Item` heading was treated as the next real phase. Sentinel phase ids (999.x backlog, 0.x drafts) are now skipped. (#2786)
|
||||
Reference in New Issue
Block a user