Remove confusing `parallelizable` boolean field. It was redundant -
execute-phase already computes parallelizability from `depends_on`
and file conflicts.
Changes:
- Remove `parallelizable: true|false` from plan frontmatter
- Rename `files_exclusive` to `files_modified` (clearer intent)
- Simplify execute-phase dependency detection logic
- Update phase-prompt template and plan-phase workflow
Parallelization is now fully automatic based on:
- `depends_on: []` (empty = independent)
- `files_modified: [...]` (no overlap = can parallelize)
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
Routes to batch execution when 2+ plans exist, with execute-plan
as alternative for interactive mode.
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
Context isolation is the primary goal, not parallelization.
Even sequential plans spawn separate subagents for fresh 200k context.
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
- Update categorization table to show frontmatter-aware criteria
- Add categorization priority documentation
- Update calculate_wave() to check frontmatter depends_on first
- Handle parallelizable: false as implicit Wave 2+ assignment
- Fall back to inferred requires only when no frontmatter
- Add [frontmatter] annotation in wave output for plans using new fields
- Add PLAN_PARALLELIZABLE, PLAN_DEPENDS_ON, PLAN_FILES_EXCLUSIVE arrays
- Check for parallelizable, depends_on, files_exclusive in plan frontmatter
- Use frontmatter values directly when present
- Fall back to inference logic for old plans without frontmatter
- Document dependency detection priority
- Include parallelizable, depends_on, files_exclusive in frontmatter
- Rules for parallelizable field determination
- Parallel-aware context section guidance
- Avoid reflexive SUMMARY references when parallel
- File ownership analysis per task group
- Detect unnecessary inter-plan dependencies
- Restructure for vertical slices when beneficial
- Mark plans with parallelization frontmatter values
- Reads .planning/config.json parallelization settings early
- Documents planning behavior when parallel enabled vs disabled
- Placed after load_project_state, before load_codebase_context
- Default: assume parallelization enabled for new projects
- Command now loads both workflows (execution + orchestration)
- Agents commit tasks normally (removed DON'T COMMIT instruction)
- Orchestrator only commits metadata after all agents complete
- No duplication - single source of truth for execution logic
Add ability to resume interrupted subagent executions using Task tool's
resume parameter. Tracks agent IDs during execution and enables seamless
continuation after session timeout, rate limits, or crashes.
- New /gsd:resume-task command for resuming interrupted agents
- Agent ID tracking in execute-phase workflow
- Dual storage: current-agent-id.txt (fast) + agent-history.json (audit)
- Auto-detection of interrupted agents in resume-project workflow
- File conflict warnings before resume
Closes#37
Co-Authored-By: davesienkowski <davesienkowski@users.noreply.github.com>
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
Front-load mindset guidance before process steps:
- Secure by design: assume hostile input
- Performance by design: assume production load
- Observable by design: plan for self-debugging
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
Add /gsd:verify-work to "Also available" sections in execute-phase workflow:
- Route A: After plan completion, before next plan
- Route B: After phase completion, before next phase
- Route C: After milestone completion, before archiving
Users can now easily run manual acceptance testing at any completion point.
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
- GSD-compliant XML structure with terse step names
- All user interaction via AskUserQuestion
- Issues logged to phase-scoped file (not global ISSUES.md)
- References uat-issues.md template
- Rewrite offer_next step in execute-phase.md as mandatory verification gate
- Rewrite offer_next_phase step in transition.md with explicit verification
- Rewrite route step in progress.md with numbered verification steps
- Replace broken regex [0-9] (only matched single digits) with ROADMAP.md reading
- Add decision tables mapping conditions to explicit routes (A, B, C, D)
- Require Claude to "State the counts" before any routing decision
- Add "Do NOT skip this verification" instruction to prevent premature completion claims
Fixes issue where Claude would declare "phase complete" or "milestone complete"
without verifying remaining plans actually exist.
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
Each phase workflow now commits its artifacts immediately:
- discuss-phase.md commits CONTEXT.md
- research-phase.md commits RESEARCH.md
- plan-phase.md commits PLAN.md (and DISCOVERY.md)
- execute-phase.md commits only execution artifacts (SUMMARY, STATE, ROADMAP)
Planning artifacts are inputs to execution and should be saved when created.
Execution artifacts are outputs and are committed after execution completes.
Closes#12
- Add MILESTONE-CONTEXT.md template for handoff between commands
- discuss-milestone now writes context to .planning/MILESTONE-CONTEXT.md
- create-milestone reads context file and deletes after use
Fixes#11🤖 Generated with [Claude Code](https://claude.com/claude-code)
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
TDD requires 2-3 execution cycles (RED → GREEN → REFACTOR), each with
file reads, test runs, and potential debugging. This consumes 40-50%
of context for a single feature. Dedicated TDD plans ensure full
quality throughout the cycle.
- TDD plans use `type: tdd` frontmatter with `<feature>` element
- One feature per TDD plan (batching defeats the purpose)
- Target ~40% context usage for TDD plans
- Standard plans handle non-TDD work with 2-3 tasks
🤖 Generated with [Claude Code](https://claude.com/claude-code)
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
- Each task commits immediately after completion (feat/fix/test/refactor)
- Plan completion commits metadata only (docs: SUMMARY + STATE + ROADMAP)
- Git history becomes primary context source for future Claude sessions
- Better bisect granularity, failure recovery, and revert capabilities
Changes:
- execute-phase.md: Added <task_commit> protocol and per-task commit flow
- execute-plan.md: Updated commit rules and success criteria
- git-integration.md: New task-completion format, strategy rationale
- tdd.md: Aligned TDD commits with standard task commit pattern
- summary.md: Added Task Commits section with commit hashes
- README.md: Rewrote git history section with atomic commit benefits
- scope-estimation.md: Clarified commit counts per plan
- principles.md: Added <atomic_commits> section explaining strategy
Each plan now produces 3-4 commits (2-3 task commits + 1 metadata commit)
instead of single monolithic commit. Optimizes observability for solo
developer + Claude Code workflow.
Depth sets a ceiling on compression, not a floor on expansion.
Small phases stay small even in comprehensive mode.
- Comprehensive auth = 8 plans (work warrants it)
- Comprehensive "add favicon" = 1 plan (that's all it is)
🤖 Generated with [Claude Code](https://claude.com/claude-code)
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
Adds depth setting (quick/standard/comprehensive) to control how many
phases and plans get created. Tasks per plan stays constant at 2-3.
- Quick: 3-5 phases, 1-3 plans each
- Standard: 5-8 phases, 3-5 plans each
- Comprehensive: 8-12 phases, 5-10 plans each
Depth increases plan COUNT, never plan SIZE. More plans = more
thoroughness with same quality per plan.
Files changed:
- new-project.md: depth question after mode
- config.json: depth field added
- create-roadmap.md: depth-aware phase guidance
- plan-phase.md: depth-aware plan splitting
- scope-estimation.md: depth calibration section
- create-milestone.md: removed hardcoded 3-6 limit
- new-milestone.md: removed hardcoded 3-6 limit
- roadmap.md template: depth-aware guidance
🤖 Generated with [Claude Code](https://claude.com/claude-code)
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
- Add references/tdd.md with detection heuristics, red-green-refactor cycle
- Add tdd_annotation section to plan-format.md with task structure
- Expand plan-phase.md with TDD detection and annotation guidance
- Add tdd_execution section to execute-phase.md with commit patterns
- TDD-aware task routing in execute step
🤖 Generated with [Claude Code](https://claude.com/claude-code)
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
- Remove decision_gate step (redundant after confirm_breakdown approval)
- Restore explicit bash commands in load_codebase_context, identify_phase,
read_project_history, and gather_phase_context for consistent behavior
🤖 Generated with [Claude Code](https://claude.com/claude-code)
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
Adds bash logic to count PLAN vs SUMMARY files before deciding
whether to offer next plan or next phase. Fixes bug where GSD
would skip remaining plans in a phase.
🤖 Generated with [Claude Code](https://claude.com/claude-code)
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
PROJECT.md evolves throughout project lifecycle:
- Requirements have states: Validated, Active, Out of Scope
- Decisions track outcomes: Good, Revisit, Pending
- Phase transitions update requirements and log decisions
- Milestone completions trigger full PROJECT.md review
STATE.md now references PROJECT.md (not a copy):
- Claude reads PROJECT.md directly for full context
- Smaller STATE.md footprint (~100 lines)
- Project Reference section with core value and focus
Brownfield projects infer Validated requirements from existing code.
🤖 Generated with [Claude Code](https://claude.com/claude-code)
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
- Agent prompts now explicitly require file paths in findings
- Templates updated with backtick-formatted path examples
- CONCERNS.md examples show Files: field for every issue
- ARCHITECTURE.md now welcomes file paths as concrete examples
- Makes codebase docs actionable for Claude during planning
🤖 Generated with [Claude Code](https://claude.com/claude-code)
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
The limit was causing loss of useful context, especially code examples
in TESTING.md and CONVENTIONS.md. Document quality > arbitrary brevity.
🤖 Generated with [Claude Code](https://claude.com/claude-code)
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
- new-project.md detects existing code, offers /gsd:map-codebase first
- plan-phase loads relevant codebase context based on phase type
- execute-phase updates codebase map incrementally after execution
🤖 Generated with [Claude Code](https://claude.com/claude-code)
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
- commands/gsd/map-codebase.md: slash command entry point
- get-shit-done/workflows/map-codebase.md: workflow with 6 process steps
- Documents 4 parallel Explore agents and 7 output files
- Agent orchestration to be implemented in plan 02-02
- Add continuation-format.md reference defining the standard format
- Replace "## To Continue" with "## ▶ Next Up"
- Show plan/phase name + description instead of just command paths
- Add `/clear` explanation: "fresh context window"
- Change "Other options" to "Also available"
- Add /gsd:research-phase to phase planning options
- Add visual separators and completion headers
🤖 Generated with [Claude Code](https://claude.com/claude-code)
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
End-of-command workflows now show explicit instructions to run /clear
and paste the next command, rather than offering numbered options that
invoke SlashCommand directly. This prevents users from accidentally
exhausting context by continuing work in the same session.
- Updated 16 files (commands and workflows)
- YOLO mode auto-continues preserved (user explicitly chose automation)
- In-workflow decisions like consider-issues preserved
🤖 Generated with [Claude Code](https://claude.com/claude-code)
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
Remove fixed 3-6 phase constraint and time-based sizing (1-3 days).
Phase count now emerges from deliverable coherence—simple projects
get fewer phases, complex projects get more.
🤖 Generated with [Claude Code](https://claude.com/claude-code)
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
All questioning workflows now require AskUserQuestion tool for every
question, not just decision gates. Inline text questions are prohibited.
Updated: questioning.md, new-project.md, discuss-phase.md,
discuss-milestone.md, and their workflow files.
🤖 Generated with [Claude Code](https://claude.com/claude-code)
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
plan-phase, execute-phase, resume-project now reference:
- <vision> instead of <phase_objectives>
- <essential> instead of <constraints>/<risks>
- <boundaries> instead of <success_indicators>
🤖 Generated with [Claude Code](https://claude.com/claude-code)
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
Show slash commands inline so users can copy them to fresh context,
matching pattern used by other GSD commands.
🤖 Generated with [Claude Code](https://claude.com/claude-code)
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
Research is now optimized for Claude Code implementation quality:
- PROJECT.md-driven (features, constraints, questions, decisions)
- High-confidence only (no low-quality padding)
- 3 focused files: stack.md, implementation.md, risks.md
- Code examples with current vs deprecated patterns
🤖 Generated with [Claude Code](https://claude.com/claude-code)
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>