Commands are now installed as commands/gsd/<name>.md and invoked as /gsd:<name> in Claude Code. The old hyphen form /gsd-<name> was still hardcoded in hundreds of places across workflows, references, templates, lib modules, and command files — causing "Unknown command" errors whenever GSD suggested a command to the user. Replace all /gsd-<cmd> occurrences where <cmd> is a known command name (derived at runtime from commands/gsd/*.md) using a targeted Node.js script. Agent names, tool names (gsd-sdk, gsd-tools), directory names, and path fragments are not touched. Adds regression test tests/bug-2543-gsd-slash-namespace.test.cjs that enforces zero legacy occurrences going forward. Removes inverted tests/stale-colon-refs.test.cjs (bug #1748) which enforced the now-obsolete hyphen form; the new bug-2543 test supersedes it. Updates 5 assertion tests that hardcoded the old hyphen form to accept the new colon form. Closes #2543 Co-authored-by: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
3.8 KiB
3.8 KiB
Insert a decimal phase for urgent work discovered mid-milestone between existing integer phases. Uses decimal numbering (72.1, 72.2, etc.) to preserve the logical sequence of planned phases while accommodating urgent insertions without renumbering the entire roadmap.
<required_reading> Read all files referenced by the invoking prompt's execution_context before starting. </required_reading>
Parse the command arguments: - First argument: integer phase number to insert after - Remaining arguments: phase descriptionExample: /gsd:insert-phase 72 Fix critical auth bug
-> after = 72
-> description = "Fix critical auth bug"
If arguments missing:
ERROR: Both phase number and description required
Usage: /gsd:insert-phase <after> <description>
Example: /gsd:insert-phase 72 Fix critical auth bug
Exit.
Validate first argument is an integer.
Load phase operation context:INIT=$(gsd-sdk query init.phase-op "${after_phase}")
if [[ "$INIT" == @file:* ]]; then INIT=$(cat "${INIT#@file:}"); fi
Check roadmap_exists from init JSON. If false:
ERROR: No roadmap found (.planning/ROADMAP.md)
Exit.
**Delegate the phase insertion to `gsd-sdk query phase.insert`:**RESULT=$(gsd-sdk query phase.insert "${after_phase}" "${description}")
The CLI handles:
- Verifying target phase exists in ROADMAP.md
- Calculating next decimal phase number (checking existing decimals on disk)
- Generating slug from description
- Creating the phase directory (
.planning/phases/{N.M}-{slug}/) - Inserting the phase entry into ROADMAP.md after the target phase with (INSERTED) marker
Extract from result: phase_number, after_phase, name, slug, directory.
- Read
.planning/STATE.md - Update STATE.md's next-phase pointers to the newly inserted phase
{decimal_phase}:- Update structured field(s) used by tooling (e.g.
current_phase:) to{decimal_phase}. - Update human-readable recommendation text (e.g.
## Current Phase,Next recommended run:) to{decimal_phase}. - If multiple pointer locations exist, update all of them in the same edit.
- Update structured field(s) used by tooling (e.g.
- Under "## Accumulated Context" → "### Roadmap Evolution" add entry:
- Phase {decimal_phase} inserted after Phase {after_phase}: {description} (URGENT)
If "Roadmap Evolution" section doesn't exist, create it.
Present completion summary:Phase {decimal_phase} inserted after Phase {after_phase}:
- Description: {description}
- Directory: .planning/phases/{decimal-phase}-{slug}/
- Status: Not planned yet
- Marker: (INSERTED) - indicates urgent work
Roadmap updated: .planning/ROADMAP.md
Project state updated: .planning/STATE.md
---
## Next Up
**Phase {decimal_phase}: {description}** -- urgent insertion
`/clear` then:
`/gsd:plan-phase {decimal_phase}`
---
**Also available:**
- Review insertion impact: Check if Phase {next_integer} dependencies still make sense
- Review roadmap
---
<anti_patterns>
- Don't use this for planned work at end of milestone (use /gsd:add-phase)
- Don't insert before Phase 1 (decimal 0.1 makes no sense)
- Don't renumber existing phases
- Don't modify the target phase content
- Don't create plans yet (that's /gsd:plan-phase)
- Don't commit changes (user decides when to commit) </anti_patterns>
<success_criteria> Phase insertion is complete when:
gsd-sdk query phase.insertexecuted successfully- Phase directory created
- Roadmap updated with new phase entry (includes "(INSERTED)" marker)
- STATE.md updated with roadmap evolution note
- User informed of next steps and dependency implications </success_criteria>