Files
msd-core/get-shit-done/workflows/insert-phase.md
Tom Boucher 73c1af5168 fix(#2543): replace legacy /gsd-<cmd> syntax with /gsd:<cmd> across all source files (#2595)
Commands are now installed as commands/gsd/<name>.md and invoked as
/gsd:<name> in Claude Code. The old hyphen form /gsd-<name> was still
hardcoded in hundreds of places across workflows, references, templates,
lib modules, and command files — causing "Unknown command" errors
whenever GSD suggested a command to the user.

Replace all /gsd-<cmd> occurrences where <cmd> is a known command name
(derived at runtime from commands/gsd/*.md) using a targeted Node.js
script. Agent names, tool names (gsd-sdk, gsd-tools), directory names,
and path fragments are not touched.

Adds regression test tests/bug-2543-gsd-slash-namespace.test.cjs that
enforces zero legacy occurrences going forward. Removes inverted
tests/stale-colon-refs.test.cjs (bug #1748) which enforced the now-obsolete
hyphen form; the new bug-2543 test supersedes it. Updates 5 assertion
tests that hardcoded the old hyphen form to accept the new colon form.

Closes #2543

Co-authored-by: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-04-22 12:04:25 -04:00

135 lines
3.8 KiB
Markdown

<purpose>
Insert a decimal phase for urgent work discovered mid-milestone between existing integer phases. Uses decimal numbering (72.1, 72.2, etc.) to preserve the logical sequence of planned phases while accommodating urgent insertions without renumbering the entire roadmap.
</purpose>
<required_reading>
Read all files referenced by the invoking prompt's execution_context before starting.
</required_reading>
<process>
<step name="parse_arguments">
Parse the command arguments:
- First argument: integer phase number to insert after
- Remaining arguments: phase description
Example: `/gsd:insert-phase 72 Fix critical auth bug`
-> after = 72
-> description = "Fix critical auth bug"
If arguments missing:
```
ERROR: Both phase number and description required
Usage: /gsd:insert-phase <after> <description>
Example: /gsd:insert-phase 72 Fix critical auth bug
```
Exit.
Validate first argument is an integer.
</step>
<step name="init_context">
Load phase operation context:
```bash
INIT=$(gsd-sdk query init.phase-op "${after_phase}")
if [[ "$INIT" == @file:* ]]; then INIT=$(cat "${INIT#@file:}"); fi
```
Check `roadmap_exists` from init JSON. If false:
```
ERROR: No roadmap found (.planning/ROADMAP.md)
```
Exit.
</step>
<step name="insert_phase">
**Delegate the phase insertion to `gsd-sdk query phase.insert`:**
```bash
RESULT=$(gsd-sdk query phase.insert "${after_phase}" "${description}")
```
The CLI handles:
- Verifying target phase exists in ROADMAP.md
- Calculating next decimal phase number (checking existing decimals on disk)
- Generating slug from description
- Creating the phase directory (`.planning/phases/{N.M}-{slug}/`)
- Inserting the phase entry into ROADMAP.md after the target phase with (INSERTED) marker
Extract from result: `phase_number`, `after_phase`, `name`, `slug`, `directory`.
</step>
<step name="update_project_state">
Update STATE.md to reflect the inserted phase:
1. Read `.planning/STATE.md`
2. Update STATE.md's next-phase pointers to the newly inserted phase `{decimal_phase}`:
- Update structured field(s) used by tooling (e.g. `current_phase:`) to `{decimal_phase}`.
- Update human-readable recommendation text (e.g. `## Current Phase`, `Next recommended run:`) to `{decimal_phase}`.
- If multiple pointer locations exist, update all of them in the same edit.
3. Under "## Accumulated Context" → "### Roadmap Evolution" add entry:
```
- Phase {decimal_phase} inserted after Phase {after_phase}: {description} (URGENT)
```
If "Roadmap Evolution" section doesn't exist, create it.
</step>
<step name="completion">
Present completion summary:
```
Phase {decimal_phase} inserted after Phase {after_phase}:
- Description: {description}
- Directory: .planning/phases/{decimal-phase}-{slug}/
- Status: Not planned yet
- Marker: (INSERTED) - indicates urgent work
Roadmap updated: .planning/ROADMAP.md
Project state updated: .planning/STATE.md
---
## Next Up
**Phase {decimal_phase}: {description}** -- urgent insertion
`/clear` then:
`/gsd:plan-phase {decimal_phase}`
---
**Also available:**
- Review insertion impact: Check if Phase {next_integer} dependencies still make sense
- Review roadmap
---
```
</step>
</process>
<anti_patterns>
- Don't use this for planned work at end of milestone (use /gsd:add-phase)
- Don't insert before Phase 1 (decimal 0.1 makes no sense)
- Don't renumber existing phases
- Don't modify the target phase content
- Don't create plans yet (that's /gsd:plan-phase)
- Don't commit changes (user decides when to commit)
</anti_patterns>
<success_criteria>
Phase insertion is complete when:
- [ ] `gsd-sdk query phase.insert` executed successfully
- [ ] Phase directory created
- [ ] Roadmap updated with new phase entry (includes "(INSERTED)" marker)
- [ ] STATE.md updated with roadmap evolution note
- [ ] User informed of next steps and dependency implications
</success_criteria>