* refactor(tests): consolidate Milestone Module — 10 files → 4 Closes #3753 Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com> * fix(changeset): correct fragment format for 3753-consolidate-milestone-tests Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com> * fix(changeset): add required frontmatter to 3753 changeset fragment Adds `type: Fixed` and `pr: 3753` frontmatter so docs-lint passes. Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com> * fix(tests): bug-2943 execFileSync timeout 5s→15s for Windows starvation PR #3754's milestone consolidation reshuffles run-tests.cjs chunk composition. On Windows/Node 22 under --test-concurrency=4, bug-2943 subprocesses now share concurrency slots with bug-2760-codex-install subtests (8–15s each), starving past the 5000ms timeout. 15s covers the observed 13.5s worst case with headroom. Refs #3753 Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com> --------- Co-authored-by: Claude Sonnet 4.6 <noreply@anthropic.com>
20 lines
1.0 KiB
Markdown
20 lines
1.0 KiB
Markdown
---
|
|
type: Fixed
|
|
pr: 3753
|
|
---
|
|
<!-- docs-exempt: internal test refactor only — no user-facing surface changed -->
|
|
|
|
## Summary
|
|
|
|
Consolidates the Milestone Module test cluster from 10 files to 4, bringing the cluster within the lint-test-file-count allowlist ceiling introduced in PR #3738.
|
|
|
|
- Rewrote `tests/milestone.test.cjs` (869 → 720 LOC) with compact shared helpers, absorbing `milestone-regex-global.test.cjs` and `bug-3043-milestone-complete-scope.test.cjs`
|
|
- New `tests/milestone-archive.test.cjs` (505 LOC) absorbs `bug-2684`, `bug-2787`, `bug-3164`, `bug-3600` — milestone archive layout, fenced code block parsing, phase filter, version forwarding
|
|
- Expanded `tests/milestone-summary.test.cjs` (471 LOC) to absorb `milestone-audit.test.cjs`
|
|
- `sdk/src/milestone-runner.test.ts` unchanged (421 LOC)
|
|
- All 99 CJS assertions and 11 SDK assertions preserved (no regression)
|
|
- Added Milestone Module glossary entry to `CONTEXT.md`
|
|
- Allowlist update deferred to rebase after PR #3738 merges; pre-rebase, `milestone` entry would change from 10 → 4
|
|
|
|
Closes #3753
|