Files
msd-core/docs/features/session-reporting.md
Jakub Zych a9a7a328e6 refactor: hard-fork GSD -> MSD (Make Software Done)
Mechanical rename produced by scripts/msd-rename.cjs: gsd/Gsd/GSD -> msd/Msd/MSD
across contents and paths, upstream package/repo coordinates -> @golem15/msd-core
and golem15com/msd-core. Deep links into upstream history, sibling upstream
packages, the GSD-2 import feature, CHANGELOG.md and .changeset/ are kept as-is.

Hand edits on top: MSD block-letter banner and logos, LICENSE copyright line,
package/plugin identity, regenerated lockfile, install-tree fixtures, derived
registries and benchmark baseline; migration checksum baseline re-locked
(MSD keeps its own install state, so no install had applied the old sums);
sort-order and regex-escaped expectations in tests adjusted.
2026-10-06 01:47:40 +02:00

27 lines
943 B
Markdown

---
id: 24
title: Session Reporting
group: Context Engineering Features
---
**Command:** `/msd-pause-work --report`
**Purpose:** Generate a structured post-session summary document capturing work performed, outcomes achieved, and estimated resource usage.
**Requirements:**
- REQ-REPORT-01: System MUST gather data from STATE.md, git log, and plan/summary files
- REQ-REPORT-02: System MUST include commits made, plans executed, and phases progressed
- REQ-REPORT-03: System MUST estimate token usage and cost based on session activity
- REQ-REPORT-04: System MUST include active blockers and decisions made
- REQ-REPORT-05: System MUST recommend next steps
**Produces:** `.planning/reports/SESSION_REPORT.md`
**Report Sections:**
- Session overview (duration, milestone, phase)
- Work performed (commits, plans, phases)
- Outcomes and deliverables
- Blockers and decisions
- Resource estimates (tokens, cost)
- Next steps recommendation