Files
msd-core/.planning/phases/16-plan-verification-loop/16-01-SUMMARY.md
Lex Christopherson b838692c53 docs(16-01): complete gsd-plan-checker plan
Tasks completed: 2/2
- Create gsd-plan-checker agent with six verification dimensions
- Examples included for common failure modes

SUMMARY: .planning/phases/16-plan-verification-loop/16-01-SUMMARY.md

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-01-16 08:58:01 -06:00

3.1 KiB

phase, plan, subsystem, tags, requires, provides, affects, tech-stack, key-files, key-decisions, patterns-established, duration, completed
phase plan subsystem tags requires provides affects tech-stack key-files key-decisions patterns-established duration completed
16-plan-verification-loop 01 agents
verification
planning
goal-backward
plan-checker
phase provides
15-dedicated-planner-agent gsd-planner agent to create plans
gsd-plan-checker agent for plan verification before execution
Six verification dimensions (coverage, completeness, dependencies, links, scope, derivation)
Structured issue format for planner feedback loop
16-plan-verification-loop
plan-phase
execute-phase
added patterns
Goal-backward plan verification (plans, not code)
Structured issue reporting with fix hints
Checker role mirrors verifier (verify plans vs verify code)
created modified
agents/gsd-plan-checker.md
Six dimensions: coverage, completeness, dependencies, links, scope, derivation
Structured YAML issue format for planner consumption
Checker returns passed or issues_found status
Plan checker verifies BEFORE execution (vs verifier verifies AFTER)
Same goal-backward methodology as gsd-verifier but applied to plans
3min 2026-01-16

Phase 16 Plan 01: Create gsd-plan-checker Agent Summary

Goal-backward plan verification agent with six dimensions: coverage, completeness, dependencies, links, scope, and derivation

Performance

  • Duration: 3 min
  • Started: 2026-01-16T14:54:04Z
  • Completed: 2026-01-16T14:56:57Z
  • Tasks: 2
  • Files modified: 1

Accomplishments

  • Created gsd-plan-checker agent with complete plan verification methodology
  • Six verification dimensions covering all aspects of plan quality
  • Structured issue format that planner can consume for revisions
  • Four example scenarios demonstrating common failure modes

Task Commits

Each task was committed atomically:

  1. Task 1+2: Create gsd-plan-checker with examples - 47eab1a (feat)
    • Combined task: created agent with all sections including examples

Plan metadata: (pending)

Files Created/Modified

  • agents/gsd-plan-checker.md - Plan verification agent (744 lines)

Decisions Made

  • Six verification dimensions: Coverage, completeness, dependencies, key links, scope, derivation - comprehensive without overlap
  • Structured YAML issues: Format allows planner to programmatically parse and address
  • Checker vs Verifier distinction: Clear - checker verifies plans WILL achieve goal, verifier verifies code DID achieve goal

Deviations from Plan

None - plan executed as written (Task 2's examples section was included in Task 1 creation for efficiency).

Issues Encountered

None

User Setup Required

None - no external service configuration required.

Next Phase Readiness

  • gsd-plan-checker agent ready for integration
  • Next: 16-02 updates plan-phase.md orchestrator to spawn checker after planner
  • Next: 16-03 adds revision mode to gsd-planner for handling checker feedback

Phase: 16-plan-verification-loop Completed: 2026-01-16