docs(16-01): complete gsd-plan-checker plan

Tasks completed: 2/2
- Create gsd-plan-checker agent with six verification dimensions
- Examples included for common failure modes

SUMMARY: .planning/phases/16-plan-verification-loop/16-01-SUMMARY.md

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
This commit is contained in:
Lex Christopherson
2026-01-16 08:58:01 -06:00
parent 47eab1a2b0
commit b838692c53
2 changed files with 113 additions and 8 deletions

View File

@@ -20,18 +20,18 @@
## Current Position
Phase: 16 of 16 (Plan Verification Loop)
Plan: 0 of 3 in current phase
Status: Planned
Last activity: 2026-01-16 - Phase 16 planned (3 plans in 2 waves)
Plan: 1 of 3 in current phase
Status: In progress
Last activity: 2026-01-16 - Completed 16-01-PLAN.md
Progress: ██████████████████████████████ 36/36 plans (100%)
Progress: █████████████████████████████████████ 37/39 plans (95%)
## Performance Metrics
**Velocity:**
- Total plans completed: 36
- Total plans completed: 37
- Average duration: 3.4 min
- Total execution time: ~122 min
- Total execution time: ~125 min
**By Phase:**
@@ -52,9 +52,10 @@ Progress: ███████████████████████
| 13 | 3 | 10 min | 3.3 min |
| 14 | 3 | 11 min | 3.7 min |
| 15 | 3 | 7 min | 2.3 min |
| 16 | 1 | 3 min | 3 min |
**Recent Trend:**
- Last 5 plans: 14-03 (3m), 15-01 (5m), 15-02 (3m), 15-03 (1m)
- Last 5 plans: 15-01 (5m), 15-02 (3m), 15-03 (1m), 16-01 (3m)
- Trend: Consistent execution times
*Updated after each plan completion*
@@ -92,6 +93,8 @@ Progress: ███████████████████████
| 15 | Deprecation notices point to specific agent sections | Planning references deprecated, content in gsd-planner |
| 15 | 189 lines thin orchestrator for /gsd:plan-phase | Under 200 target, uses agent: gsd-planner frontmatter |
| 15 | Context-only planner-subagent-prompt.md template | Follows debug/research template pattern |
| 16 | Six verification dimensions | Coverage, completeness, dependencies, links, scope, derivation |
| 16 | Checker verifies plans WILL achieve goal | Same methodology as verifier but applied to plans pre-execution |
### Deferred Issues
@@ -127,5 +130,5 @@ Drift notes: None
## Session Continuity
Last session: 2026-01-16
Stopped at: Completed 15-03-PLAN.md
Stopped at: Completed 16-01-PLAN.md
Resume file: None

View File

@@ -0,0 +1,102 @@
---
phase: 16-plan-verification-loop
plan: 01
subsystem: agents
tags: [verification, planning, goal-backward, plan-checker]
# Dependency graph
requires:
- phase: 15-dedicated-planner-agent
provides: gsd-planner agent to create plans
provides:
- gsd-plan-checker agent for plan verification before execution
- Six verification dimensions (coverage, completeness, dependencies, links, scope, derivation)
- Structured issue format for planner feedback loop
affects: [16-plan-verification-loop, plan-phase, execute-phase]
# Tech tracking
tech-stack:
added: []
patterns:
- "Goal-backward plan verification (plans, not code)"
- "Structured issue reporting with fix hints"
- "Checker role mirrors verifier (verify plans vs verify code)"
key-files:
created:
- agents/gsd-plan-checker.md
modified: []
key-decisions:
- "Six dimensions: coverage, completeness, dependencies, links, scope, derivation"
- "Structured YAML issue format for planner consumption"
- "Checker returns passed or issues_found status"
patterns-established:
- "Plan checker verifies BEFORE execution (vs verifier verifies AFTER)"
- "Same goal-backward methodology as gsd-verifier but applied to plans"
# Metrics
duration: 3min
completed: 2026-01-16
---
# Phase 16 Plan 01: Create gsd-plan-checker Agent Summary
**Goal-backward plan verification agent with six dimensions: coverage, completeness, dependencies, links, scope, and derivation**
## Performance
- **Duration:** 3 min
- **Started:** 2026-01-16T14:54:04Z
- **Completed:** 2026-01-16T14:56:57Z
- **Tasks:** 2
- **Files modified:** 1
## Accomplishments
- Created gsd-plan-checker agent with complete plan verification methodology
- Six verification dimensions covering all aspects of plan quality
- Structured issue format that planner can consume for revisions
- Four example scenarios demonstrating common failure modes
## Task Commits
Each task was committed atomically:
1. **Task 1+2: Create gsd-plan-checker with examples** - `47eab1a` (feat)
- Combined task: created agent with all sections including examples
**Plan metadata:** (pending)
## Files Created/Modified
- `agents/gsd-plan-checker.md` - Plan verification agent (744 lines)
## Decisions Made
- **Six verification dimensions:** Coverage, completeness, dependencies, key links, scope, derivation - comprehensive without overlap
- **Structured YAML issues:** Format allows planner to programmatically parse and address
- **Checker vs Verifier distinction:** Clear - checker verifies plans WILL achieve goal, verifier verifies code DID achieve goal
## Deviations from Plan
None - plan executed as written (Task 2's examples section was included in Task 1 creation for efficiency).
## Issues Encountered
None
## User Setup Required
None - no external service configuration required.
## Next Phase Readiness
- gsd-plan-checker agent ready for integration
- Next: 16-02 updates plan-phase.md orchestrator to spawn checker after planner
- Next: 16-03 adds revision mode to gsd-planner for handling checker feedback
---
*Phase: 16-plan-verification-loop*
*Completed: 2026-01-16*