docs(16-01): complete gsd-plan-checker plan
Tasks completed: 2/2 - Create gsd-plan-checker agent with six verification dimensions - Examples included for common failure modes SUMMARY: .planning/phases/16-plan-verification-loop/16-01-SUMMARY.md Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
This commit is contained in:
@@ -20,18 +20,18 @@
|
||||
## Current Position
|
||||
|
||||
Phase: 16 of 16 (Plan Verification Loop)
|
||||
Plan: 0 of 3 in current phase
|
||||
Status: Planned
|
||||
Last activity: 2026-01-16 - Phase 16 planned (3 plans in 2 waves)
|
||||
Plan: 1 of 3 in current phase
|
||||
Status: In progress
|
||||
Last activity: 2026-01-16 - Completed 16-01-PLAN.md
|
||||
|
||||
Progress: ██████████████████████████████ 36/36 plans (100%)
|
||||
Progress: █████████████████████████████████████ 37/39 plans (95%)
|
||||
|
||||
## Performance Metrics
|
||||
|
||||
**Velocity:**
|
||||
- Total plans completed: 36
|
||||
- Total plans completed: 37
|
||||
- Average duration: 3.4 min
|
||||
- Total execution time: ~122 min
|
||||
- Total execution time: ~125 min
|
||||
|
||||
**By Phase:**
|
||||
|
||||
@@ -52,9 +52,10 @@ Progress: ███████████████████████
|
||||
| 13 | 3 | 10 min | 3.3 min |
|
||||
| 14 | 3 | 11 min | 3.7 min |
|
||||
| 15 | 3 | 7 min | 2.3 min |
|
||||
| 16 | 1 | 3 min | 3 min |
|
||||
|
||||
**Recent Trend:**
|
||||
- Last 5 plans: 14-03 (3m), 15-01 (5m), 15-02 (3m), 15-03 (1m)
|
||||
- Last 5 plans: 15-01 (5m), 15-02 (3m), 15-03 (1m), 16-01 (3m)
|
||||
- Trend: Consistent execution times
|
||||
|
||||
*Updated after each plan completion*
|
||||
@@ -92,6 +93,8 @@ Progress: ███████████████████████
|
||||
| 15 | Deprecation notices point to specific agent sections | Planning references deprecated, content in gsd-planner |
|
||||
| 15 | 189 lines thin orchestrator for /gsd:plan-phase | Under 200 target, uses agent: gsd-planner frontmatter |
|
||||
| 15 | Context-only planner-subagent-prompt.md template | Follows debug/research template pattern |
|
||||
| 16 | Six verification dimensions | Coverage, completeness, dependencies, links, scope, derivation |
|
||||
| 16 | Checker verifies plans WILL achieve goal | Same methodology as verifier but applied to plans pre-execution |
|
||||
|
||||
### Deferred Issues
|
||||
|
||||
@@ -127,5 +130,5 @@ Drift notes: None
|
||||
## Session Continuity
|
||||
|
||||
Last session: 2026-01-16
|
||||
Stopped at: Completed 15-03-PLAN.md
|
||||
Stopped at: Completed 16-01-PLAN.md
|
||||
Resume file: None
|
||||
|
||||
102
.planning/phases/16-plan-verification-loop/16-01-SUMMARY.md
Normal file
102
.planning/phases/16-plan-verification-loop/16-01-SUMMARY.md
Normal file
@@ -0,0 +1,102 @@
|
||||
---
|
||||
phase: 16-plan-verification-loop
|
||||
plan: 01
|
||||
subsystem: agents
|
||||
tags: [verification, planning, goal-backward, plan-checker]
|
||||
|
||||
# Dependency graph
|
||||
requires:
|
||||
- phase: 15-dedicated-planner-agent
|
||||
provides: gsd-planner agent to create plans
|
||||
provides:
|
||||
- gsd-plan-checker agent for plan verification before execution
|
||||
- Six verification dimensions (coverage, completeness, dependencies, links, scope, derivation)
|
||||
- Structured issue format for planner feedback loop
|
||||
affects: [16-plan-verification-loop, plan-phase, execute-phase]
|
||||
|
||||
# Tech tracking
|
||||
tech-stack:
|
||||
added: []
|
||||
patterns:
|
||||
- "Goal-backward plan verification (plans, not code)"
|
||||
- "Structured issue reporting with fix hints"
|
||||
- "Checker role mirrors verifier (verify plans vs verify code)"
|
||||
|
||||
key-files:
|
||||
created:
|
||||
- agents/gsd-plan-checker.md
|
||||
modified: []
|
||||
|
||||
key-decisions:
|
||||
- "Six dimensions: coverage, completeness, dependencies, links, scope, derivation"
|
||||
- "Structured YAML issue format for planner consumption"
|
||||
- "Checker returns passed or issues_found status"
|
||||
|
||||
patterns-established:
|
||||
- "Plan checker verifies BEFORE execution (vs verifier verifies AFTER)"
|
||||
- "Same goal-backward methodology as gsd-verifier but applied to plans"
|
||||
|
||||
# Metrics
|
||||
duration: 3min
|
||||
completed: 2026-01-16
|
||||
---
|
||||
|
||||
# Phase 16 Plan 01: Create gsd-plan-checker Agent Summary
|
||||
|
||||
**Goal-backward plan verification agent with six dimensions: coverage, completeness, dependencies, links, scope, and derivation**
|
||||
|
||||
## Performance
|
||||
|
||||
- **Duration:** 3 min
|
||||
- **Started:** 2026-01-16T14:54:04Z
|
||||
- **Completed:** 2026-01-16T14:56:57Z
|
||||
- **Tasks:** 2
|
||||
- **Files modified:** 1
|
||||
|
||||
## Accomplishments
|
||||
|
||||
- Created gsd-plan-checker agent with complete plan verification methodology
|
||||
- Six verification dimensions covering all aspects of plan quality
|
||||
- Structured issue format that planner can consume for revisions
|
||||
- Four example scenarios demonstrating common failure modes
|
||||
|
||||
## Task Commits
|
||||
|
||||
Each task was committed atomically:
|
||||
|
||||
1. **Task 1+2: Create gsd-plan-checker with examples** - `47eab1a` (feat)
|
||||
- Combined task: created agent with all sections including examples
|
||||
|
||||
**Plan metadata:** (pending)
|
||||
|
||||
## Files Created/Modified
|
||||
|
||||
- `agents/gsd-plan-checker.md` - Plan verification agent (744 lines)
|
||||
|
||||
## Decisions Made
|
||||
|
||||
- **Six verification dimensions:** Coverage, completeness, dependencies, key links, scope, derivation - comprehensive without overlap
|
||||
- **Structured YAML issues:** Format allows planner to programmatically parse and address
|
||||
- **Checker vs Verifier distinction:** Clear - checker verifies plans WILL achieve goal, verifier verifies code DID achieve goal
|
||||
|
||||
## Deviations from Plan
|
||||
|
||||
None - plan executed as written (Task 2's examples section was included in Task 1 creation for efficiency).
|
||||
|
||||
## Issues Encountered
|
||||
|
||||
None
|
||||
|
||||
## User Setup Required
|
||||
|
||||
None - no external service configuration required.
|
||||
|
||||
## Next Phase Readiness
|
||||
|
||||
- gsd-plan-checker agent ready for integration
|
||||
- Next: 16-02 updates plan-phase.md orchestrator to spawn checker after planner
|
||||
- Next: 16-03 adds revision mode to gsd-planner for handling checker feedback
|
||||
|
||||
---
|
||||
*Phase: 16-plan-verification-loop*
|
||||
*Completed: 2026-01-16*
|
||||
Reference in New Issue