* fix(#2440): per-counter progress ratchet — total_plans always takes derived value Two sites fixed (targeted — existing body-only write tests preserved): Site A — read path: shouldPreserveExistingProgress (state-document.cts:167) removed total_plans from the all-or-nothing ratchet check. It now joins total_phases as an always-derived counter. Only completed_phases and completed_plans keep ratchet behaviour (they are monotonic). This fixes gsd-tools query state.json reporting stale total_plans when a curated completed_plans triggers the ratchet. Site B — write path: applyStatePreservation (state-transition.cts:162) gained a deriveProgressKeys opt-in flag. When true (passed by cmdStatePlannedPhase only), total_plans and total_phases take the derived (post-sync) value instead of the wholesale curated restore. When false (the default — state.update, state.patch), the existing #3242 wholesale protection stays fully in force. This fixes the state planned-phase verb writing a stale total_plans. The opt-in approach preserves all 8 existing #3242/#1264/#500 body-only write tests that assert wholesale progress preservation during non- progress updates. Tests: - tests/state.test.cjs: 4 unit tests for shouldPreserveExistingProgress (total_plans upward/downward/equality + completed_plans ratchet active). - tests/state-transition.test.cjs: 2 #2440 regression tests for deriveProgressKeys=true (total_plans takes derived; boundary at equality). The existing !resync wholesale-restore test stays unchanged (default behavior preserved). References: #2440; #1446 (total_phases read-path fix — same principle); #3242 Bug A (body-only preservation — protection preserved via the opt-in gate); ADR-1769 (applyStatePreservation table-driven preservation). * chore(#2440): backfill pr:2468 in .changeset/mellow-eagles-chatter.md
108 KiB
108 KiB