Files
msd-core/commands/gsd/phase.md
Tom Boucher ed133cc116 enhance(#3085): add Grep to allowed-tools for 21 skills (#4397)
* enhance(#3085): add Grep to allowed-tools for 21 skills

29 of 71 skills omit Grep from allowed-tools, forcing Bash grep for
structured search instead of the dedicated tool. Adds Grep to the
21-skill subset confirmed safe in prior review (excludes the 6
gsd-ns-* dispatchers, gsd-help, and gsd-surface, which have no
plausible structured-search need).

Hand-edits commands/gsd/*.md only; skills/*/SKILL.md is regenerated
via `npm run gen:plugin-skills` from that source. Updates the one
hardcoded copilot-install test assertion affected by gsd-health's
new tool order.

* chore(#3085): backfill changeset PR number

Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>

* test(#2618): assert the Needs clause on the structured field, not the path-length-dependent bullet

The bullet embeds the todo file's ABSOLUTE path, so its total length
varies by runner tmpdir: on macOS CI, /private/var/folders/… plus the
test harness's gsd-test-run-* wrapper pushed the full bullet to 244
chars — past renderPendingTodoBullet's intended 240-char cap, whose
documented first degradation step drops the Needs clause. The product
behavior is correct (#2618 design); the assertion was runner-dependent.
The extraction is now pinned on json.todos[0].needs; the rendered-bullet
shape stays covered by the path-independent title assertion and the
renderer's own unit rows.

Found blocking #4186's CI on the macOS shard (test landed 30 minutes
earlier in b7406b293f / PR #4384).

---------

Co-authored-by: sim <sim@local>
Co-authored-by: Claude Sonnet 5 <noreply@anthropic.com>
2026-09-06 13:37:47 -04:00

58 lines
2.1 KiB
Markdown

---
name: gsd:phase
description: Multi-phase management — add, insert, remove, or edit phases in ROADMAP.md (roadmap phase CRUD)
argument-hint: "[--insert | --remove | --edit] <phase-name-or-number>"
allowed-tools:
- Read
- Write
- Bash
- Glob
- Grep
---
<objective>
Manage phases in ROADMAP.md with a single consolidated command.
Mode routing:
- **default** (no flag): Add a new integer phase to the end of the current milestone → add-phase workflow
- **--insert**: Insert urgent work as a decimal phase (e.g., 72.1) between existing phases → insert-phase workflow
- **--remove**: Remove a future phase and renumber subsequent phases → remove-phase workflow
- **--edit**: Edit any field of an existing phase in place → edit-phase workflow
</objective>
<routing>
| Flag | Action | Workflow |
|------|--------|----------|
| (none) | Add new integer phase at end of milestone | add-phase |
| --insert | Insert decimal phase (e.g., 72.1) after specified phase | insert-phase |
| --remove | Remove future phase, renumber subsequent | remove-phase |
| --edit | Edit fields of existing phase in place | edit-phase |
</routing>
<execution_context>
@~/.claude/gsd-core/workflows/add-phase.md
@~/.claude/gsd-core/workflows/insert-phase.md
@~/.claude/gsd-core/workflows/remove-phase.md
@~/.claude/gsd-core/workflows/edit-phase.md
</execution_context>
<context>
Arguments: $ARGUMENTS
Parse the first token of $ARGUMENTS:
- If it is `--insert`: strip the flag, pass remainder (format: <after-phase-number> <description>) to insert-phase workflow
- If it is `--remove`: strip the flag, pass remainder (phase number) to remove-phase workflow
- If it is `--edit`: strip the flag, pass remainder (phase-number [--force]) to edit-phase workflow
- Otherwise: pass all of $ARGUMENTS (phase description) to add-phase workflow
Roadmap and state are resolved in-workflow via `init phase-op` and targeted reads.
</context>
<process>
1. Parse the leading flag (if any) from $ARGUMENTS.
2. Load and execute the appropriate workflow end-to-end based on the routing table above.
3. Preserve all validation gates from the target workflow.
</process>