Files
msd-core/commands/gsd/review-backlog.md
Tom Boucher ed133cc116 enhance(#3085): add Grep to allowed-tools for 21 skills (#4397)
* enhance(#3085): add Grep to allowed-tools for 21 skills

29 of 71 skills omit Grep from allowed-tools, forcing Bash grep for
structured search instead of the dedicated tool. Adds Grep to the
21-skill subset confirmed safe in prior review (excludes the 6
gsd-ns-* dispatchers, gsd-help, and gsd-surface, which have no
plausible structured-search need).

Hand-edits commands/gsd/*.md only; skills/*/SKILL.md is regenerated
via `npm run gen:plugin-skills` from that source. Updates the one
hardcoded copilot-install test assertion affected by gsd-health's
new tool order.

* chore(#3085): backfill changeset PR number

Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>

* test(#2618): assert the Needs clause on the structured field, not the path-length-dependent bullet

The bullet embeds the todo file's ABSOLUTE path, so its total length
varies by runner tmpdir: on macOS CI, /private/var/folders/… plus the
test harness's gsd-test-run-* wrapper pushed the full bullet to 244
chars — past renderPendingTodoBullet's intended 240-char cap, whose
documented first degradation step drops the Needs clause. The product
behavior is correct (#2618 design); the assertion was runner-dependent.
The extraction is now pinned on json.todos[0].needs; the rendered-bullet
shape stays covered by the path-independent title assertion and the
renderer's own unit rows.

Found blocking #4186's CI on the macOS shard (test landed 30 minutes
earlier in b7406b293f / PR #4384).

---------

Co-authored-by: sim <sim@local>
Co-authored-by: Claude Sonnet 5 <noreply@anthropic.com>
2026-09-06 13:37:47 -04:00

66 lines
1.9 KiB
Markdown

---
name: gsd:review-backlog
description: Review and promote backlog items to active milestone
allowed-tools:
- Read
- Write
- Bash
- Grep
- AskUserQuestion
requires: [phase, review]
---
<objective>
Review all 999.x backlog items and optionally promote them into the active
milestone sequence or remove stale entries.
</objective>
<process>
1. **List backlog items:**
```bash
_BACKLOG=( .planning/phases/999* )
if [ -e "${_BACKLOG[0]}" ]; then ls -d "${_BACKLOG[@]}"; else echo "No backlog items found"; fi
```
2. **Read ROADMAP.md** and extract all 999.x phase entries:
```bash
cat .planning/ROADMAP.md
```
Show each backlog item with its description, any accumulated context (CONTEXT.md, RESEARCH.md), and creation date.
3. **Present the list to the user** via AskUserQuestion:
- For each backlog item, show: phase number, description, accumulated artifacts
- Options per item: **Promote** (move to active), **Keep** (leave in backlog), **Remove** (delete)
4. **For items to PROMOTE:**
- Find the next sequential phase number in the active milestone
- Rename the directory from `999.x-slug` to `{new_num}-slug`:
```bash
NEW_NUM=$(gsd-tools query phase.add "${DESCRIPTION}" --raw)
```
- Move accumulated artifacts to the new phase directory
- Update ROADMAP.md: move the entry from `## Backlog` section to the active phase list
- Remove `(BACKLOG)` marker
- Add appropriate `**Depends on:**` field
5. **For items to REMOVE:**
- Delete the phase directory
- Remove the entry from ROADMAP.md `## Backlog` section
6. **Commit changes:**
```bash
gsd-tools query commit "docs: review backlog — promoted N, removed M" --files .planning/ROADMAP.md
```
7. **Report summary:**
```
## 📋 Backlog Review Complete
Promoted: {list of promoted items with new phase numbers}
Kept: {list of items remaining in backlog}
Removed: {list of deleted items}
```
</process>