Files
msd-core/gsd-core/templates/state.md
Tom Boucher b7917882bb fix(#4398): render the pending-todo bullet link repo-relative (#4416)
* test(#4384): failing-first regression rows for the macOS long-base todo-cap failure

The 240-char pending-todo bullet cap must be deterministic w.r.t. where the
repo is checked out. Deterministic long-base-path fixtures (a single 110-char
segment, no real macOS dependency) reproduce next's own macos shard 3/3
failure (run 34038716700) on every OS: with an absolute link the bullet
exceeds the cap and the documented needs-first truncation drops the
'Needs <solution>' clause. Rows cover the determinism property (byte-identical
bullets under short and long bases), the CLI surface, relative-path stability,
legacy no-projectRoot behavior, drop-order preservation, and adversarial
edges (outside-root, path===root, non-string path).

* fix(#4384): render the pending-todo bullet link repo-relative

renderPendingTodosMarkdown gains an optional projectRoot; when given and the
todo's path is absolute, the bullet's [todo file](…) target becomes
toPosixPath(path.relative(projectRoot, path)) — the idiom already used for
project_exists. cmdInitTodos passes cwd.

The JSON todos[].path field stays absolute (#2376). Only the rendered display
link changes: embedding the machine-variable absolute base let macOS's
/private/var/folders/… temp paths consume the 240-char budget and drop the
'Needs' clause on long-path machines only — next's own macos-latest shard 3/3
went red on exactly this (run 34038716700), Linux's short /tmp passed. The
240-char whole-bullet cap and the needs→title→area drop order are unchanged;
this matches PR #4384's own canonical example, docs, and unit tests, which all
show repo-relative links. Docs updated at all three surfaces that describe the
bullet (COMMANDS.md, templates/state.md, reference/state-md.md — the last was
still pre-#4384 'count and reference' prose).

Fixes the macOS regression introduced by #4384; next is red on its own CI.

* test(#4384): fix substring false positive in the outside-root regression row

The ../-form relative link legitimately contains the absolute path as a
substring, so !line.includes(absolutePath) fired on correct output (caught by
the first remote verify run, linux-node24 44018/44019). Assert the property
itself instead: extract the link target and require it to be non-absolute and
not equal to the absolute path.

* chore(#4398): backfill PR number in changeset

---------

Co-authored-by: sim <sim@local>
2026-09-06 13:23:26 -04:00

206 lines
5.6 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
# State Template
Template for `.planning/STATE.md` — the project's living memory.
---
## File Template
The frontmatter block below is generated from `STATE_FIELD_SCHEMA`
(`src/state-md-schema.cts`, ADR-3473 §8.8) by `scripts/gen-state-md-docs.cjs
--write` — do not hand-edit the marked region; the body below it is
hand-authored.
<!-- STATE-MD-SCHEMA:START:frontmatter — generated by scripts/gen-state-md-docs.cjs from src/state-md-schema.cts; do not edit by hand -->
```markdown
---
gsd_state_version: '1.0' # placeholder; syncStateFrontmatter overwrites on first state.* call
status: planning
progress:
total_phases: 0
completed_phases: 0
total_plans: 0
completed_plans: 0
percent: 0
---
<!-- STATE-MD-SCHEMA:END:frontmatter -->
# Project State
## Project Reference
See: .planning/PROJECT.md (updated [date])
**Core value:** [One-liner from PROJECT.md Core Value section]
**Current focus:** [Current phase name]
## Current Position
Phase: [X] of [Y] ([Phase name])
Plan: [A] of [B] in current phase
Status: [Ready to plan / Planning / Ready to execute / In progress / Phase complete]
Last activity: [YYYY-MM-DD] — [What happened]
Progress: [░░░░░░░░░░] 0%
## Performance Metrics
**Velocity:**
- Total plans completed: [N]
- Average duration: [X] min
- Total execution time: [X.X] hours
**By Phase:**
| Phase | Plans | Total | Avg/Plan |
|-------|-------|-------|----------|
| - | - | - | - |
**Recent Trend:**
- Last 5 plans: [durations]
- Trend: [Improving / Stable / Degrading]
*Updated after each plan completion*
## Accumulated Context
### Decisions
Decisions are logged in PROJECT.md Key Decisions table.
Recent decisions affecting current work:
- [Phase X]: [Decision summary]
- [Phase Y]: [Decision summary]
### Pending Todos
[From .planning/todos/pending/ — ideas captured during sessions]
None yet.
### Blockers/Concerns
[Issues that affect future work]
None yet.
## Deferred Items
Items acknowledged and deferred at milestone close, most recent first:
| Category | Item | Status | Deferred At | Milestone |
|----------|------|--------|-------------|-----------|
| *(none)* | | | | |
## Session Continuity
Last session: [YYYY-MM-DD HH:MM]
Stopped at: [Description of last completed action]
Resume file: [Path to .continue-here*.md if exists, otherwise "None"]
```
<purpose>
STATE.md is the project's short-term memory spanning all phases and sessions.
**Problem it solves:** Information is captured in summaries, issues, and decisions but not systematically consumed. Sessions start without context.
**Solution:** A single, small file that's:
- Read first in every workflow
- Updated after every significant action
- Contains digest of accumulated context
- Enables instant session restoration
</purpose>
<lifecycle>
**Creation:** After ROADMAP.md is created (during init)
- Reference PROJECT.md (read it for current context)
- Initialize empty accumulated context sections
- Set position to "Phase 1 ready to plan"
**Reading:** First step of every workflow
- progress: Present status to user
- plan: Inform planning decisions
- execute: Know current position
- transition: Know what's complete
**Writing:** After every significant action
- execute: After SUMMARY.md created
- Update position (phase, plan, status)
- Note new decisions (detail in PROJECT.md)
- Add blockers/concerns
- transition: After phase marked complete
- Update progress bar
- Clear resolved blockers
- Refresh Project Reference date
</lifecycle>
<sections>
### Project Reference
Points to PROJECT.md for full context. Includes:
- Core value (the ONE thing that matters)
- Current focus (which phase)
- Last update date (triggers re-read if stale)
Claude reads PROJECT.md directly for requirements, constraints, and decisions.
### Current Position
Where we are right now:
- Phase X of Y — which phase
- Plan A of B — which plan within phase
- Status — current state
- Last activity — what happened most recently
- Progress bar — visual indicator of overall completion
Progress calculation: (completed plans) / (total plans across all phases) × 100%
### Performance Metrics
Track velocity to understand execution patterns:
- Total plans completed
- Average duration per plan
- Per-phase breakdown
- Recent trend (improving/stable/degrading)
Updated after each plan completion.
### Accumulated Context
**Decisions:** Reference to PROJECT.md Key Decisions table, plus recent decisions summary for quick access. Full decision log lives in PROJECT.md.
**Pending Todos:** Ideas captured via /gsd-add-todo
- One bullet per pending todo, rendered by `init.todos`'s `pending_todos_markdown`
(each bullet capped at 240 characters: `- [date] [area] title — [todo file](path) — Needs ...`;
the todo-file link is repo-relative, so the cap does not depend on checkout path length)
- `None yet.` when there are no pending todos
- No collapse-by-count fallback — every pending todo gets its own line, always
(see #2618 design doc for why a "count if many" fallback was rejected)
**Blockers/Concerns:** From "Next Phase Readiness" sections
- Issues that affect future work
- Prefix with originating phase
- Cleared when addressed
### Session Continuity
Enables instant resumption:
- When was last session
- What was last completed
- Is there a .continue-here file to resume from
</sections>
<size_constraint>
Keep STATE.md under 100 lines.
It's a DIGEST, not an archive. If accumulated context grows too large:
- Keep only 3-5 recent decisions in summary (full log in PROJECT.md)
- Keep only active blockers, remove resolved ones
The goal is "read once, know where we are" — if it's too long, that fails.
</size_constraint>