Files
msd-core/get-shit-done/workflows/audit-milestone.md
TÂCHES d44c7dcc9b refactor: update commands, workflows, agents for gsd-tools integration
Commands (15): audit-milestone, complete-milestone, debug, execute-phase,
help, insert-phase, new-milestone, new-project, plan-milestone-gaps,
plan-phase, progress, quick, remove-phase, research-phase, verify-work

Workflows (22): execute-plan (69% reduction), verify-phase (55%), others
Agents (14): All updated for new workflow structure

Total token savings: ~22k chars (75.6% in affected sections)

Ported from: get-shit-done-v2@d1fb2d5, 7f79a9b
2026-02-07 11:25:35 -06:00

235 lines
6.7 KiB
Markdown

<purpose>
Verify milestone achieved its definition of done by aggregating phase verifications, checking cross-phase integration, and assessing requirements coverage. Reads existing VERIFICATION.md files (phases already verified during execute-phase), aggregates tech debt and deferred gaps, then spawns integration checker for cross-phase wiring.
</purpose>
<required_reading>
Read all files referenced by the invoking prompt's execution_context before starting.
</required_reading>
<process>
## 0. Resolve Model Profile
```bash
CHECKER_MODEL=$(node ~/.claude/get-shit-done/bin/gsd-tools.js resolve-model gsd-integration-checker --raw)
```
## 1. Determine Milestone Scope
```bash
# Get phases in milestone
ls -d .planning/phases/*/ | sort -V
```
- Parse version from arguments or detect current from ROADMAP.md
- Identify all phase directories in scope
- Extract milestone definition of done from ROADMAP.md
- Extract requirements mapped to this milestone from REQUIREMENTS.md
## 2. Read All Phase Verifications
For each phase directory, read the VERIFICATION.md:
```bash
cat .planning/phases/01-*/*-VERIFICATION.md
cat .planning/phases/02-*/*-VERIFICATION.md
# etc.
```
From each VERIFICATION.md, extract:
- **Status:** passed | gaps_found
- **Critical gaps:** (if any — these are blockers)
- **Non-critical gaps:** tech debt, deferred items, warnings
- **Anti-patterns found:** TODOs, stubs, placeholders
- **Requirements coverage:** which requirements satisfied/blocked
If a phase is missing VERIFICATION.md, flag it as "unverified phase" — this is a blocker.
## 3. Spawn Integration Checker
With phase context collected:
```
Task(
prompt="Check cross-phase integration and E2E flows.
Phases: {phase_dirs}
Phase exports: {from SUMMARYs}
API routes: {routes created}
Verify cross-phase wiring and E2E user flows.",
subagent_type="gsd-integration-checker",
model="{integration_checker_model}"
)
```
## 4. Collect Results
Combine:
- Phase-level gaps and tech debt (from step 2)
- Integration checker's report (wiring gaps, broken flows)
## 5. Check Requirements Coverage
For each requirement in REQUIREMENTS.md mapped to this milestone:
- Find owning phase
- Check phase verification status
- Determine: satisfied | partial | unsatisfied
## 6. Aggregate into v{version}-MILESTONE-AUDIT.md
Create `.planning/v{version}-v{version}-MILESTONE-AUDIT.md` with:
```yaml
---
milestone: {version}
audited: {timestamp}
status: passed | gaps_found | tech_debt
scores:
requirements: N/M
phases: N/M
integration: N/M
flows: N/M
gaps: # Critical blockers
requirements: [...]
integration: [...]
flows: [...]
tech_debt: # Non-critical, deferred
- phase: 01-auth
items:
- "TODO: add rate limiting"
- "Warning: no password strength validation"
- phase: 03-dashboard
items:
- "Deferred: mobile responsive layout"
---
```
Plus full markdown report with tables for requirements, phases, integration, tech debt.
**Status values:**
- `passed` — all requirements met, no critical gaps, minimal tech debt
- `gaps_found` — critical blockers exist
- `tech_debt` — no blockers but accumulated deferred items need review
## 7. Present Results
Route by status (see `<offer_next>`).
</process>
<offer_next>
Output this markdown directly (not as a code block). Route based on status:
---
**If passed:**
## ✓ Milestone {version} — Audit Passed
**Score:** {N}/{M} requirements satisfied
**Report:** .planning/v{version}-MILESTONE-AUDIT.md
All requirements covered. Cross-phase integration verified. E2E flows complete.
───────────────────────────────────────────────────────────────
## ▶ Next Up
**Complete milestone** — archive and tag
/gsd:complete-milestone {version}
<sub>/clear first → fresh context window</sub>
───────────────────────────────────────────────────────────────
---
**If gaps_found:**
## ⚠ Milestone {version} — Gaps Found
**Score:** {N}/{M} requirements satisfied
**Report:** .planning/v{version}-MILESTONE-AUDIT.md
### Unsatisfied Requirements
{For each unsatisfied requirement:}
- **{REQ-ID}: {description}** (Phase {X})
- {reason}
### Cross-Phase Issues
{For each integration gap:}
- **{from} → {to}:** {issue}
### Broken Flows
{For each flow gap:}
- **{flow name}:** breaks at {step}
───────────────────────────────────────────────────────────────
## ▶ Next Up
**Plan gap closure** — create phases to complete milestone
/gsd:plan-milestone-gaps
<sub>/clear first → fresh context window</sub>
───────────────────────────────────────────────────────────────
**Also available:**
- cat .planning/v{version}-MILESTONE-AUDIT.md — see full report
- /gsd:complete-milestone {version} — proceed anyway (accept tech debt)
───────────────────────────────────────────────────────────────
---
**If tech_debt (no blockers but accumulated debt):**
## ⚡ Milestone {version} — Tech Debt Review
**Score:** {N}/{M} requirements satisfied
**Report:** .planning/v{version}-MILESTONE-AUDIT.md
All requirements met. No critical blockers. Accumulated tech debt needs review.
### Tech Debt by Phase
{For each phase with debt:}
**Phase {X}: {name}**
- {item 1}
- {item 2}
### Total: {N} items across {M} phases
───────────────────────────────────────────────────────────────
## ▶ Options
**A. Complete milestone** — accept debt, track in backlog
/gsd:complete-milestone {version}
**B. Plan cleanup phase** — address debt before completing
/gsd:plan-milestone-gaps
<sub>/clear first → fresh context window</sub>
───────────────────────────────────────────────────────────────
</offer_next>
<success_criteria>
- [ ] Milestone scope identified
- [ ] All phase VERIFICATION.md files read
- [ ] Tech debt and deferred gaps aggregated
- [ ] Integration checker spawned for cross-phase wiring
- [ ] v{version}-MILESTONE-AUDIT.md created
- [ ] Results presented with actionable next steps
</success_criteria>