Commands (15): audit-milestone, complete-milestone, debug, execute-phase, help, insert-phase, new-milestone, new-project, plan-milestone-gaps, plan-phase, progress, quick, remove-phase, research-phase, verify-work Workflows (22): execute-plan (69% reduction), verify-phase (55%), others Agents (14): All updated for new workflow structure Total token savings: ~22k chars (75.6% in affected sections) Ported from: get-shit-done-v2@d1fb2d5, 7f79a9b
235 lines
6.7 KiB
Markdown
235 lines
6.7 KiB
Markdown
<purpose>
|
|
Verify milestone achieved its definition of done by aggregating phase verifications, checking cross-phase integration, and assessing requirements coverage. Reads existing VERIFICATION.md files (phases already verified during execute-phase), aggregates tech debt and deferred gaps, then spawns integration checker for cross-phase wiring.
|
|
</purpose>
|
|
|
|
<required_reading>
|
|
Read all files referenced by the invoking prompt's execution_context before starting.
|
|
</required_reading>
|
|
|
|
<process>
|
|
|
|
## 0. Resolve Model Profile
|
|
|
|
```bash
|
|
CHECKER_MODEL=$(node ~/.claude/get-shit-done/bin/gsd-tools.js resolve-model gsd-integration-checker --raw)
|
|
```
|
|
|
|
## 1. Determine Milestone Scope
|
|
|
|
```bash
|
|
# Get phases in milestone
|
|
ls -d .planning/phases/*/ | sort -V
|
|
```
|
|
|
|
- Parse version from arguments or detect current from ROADMAP.md
|
|
- Identify all phase directories in scope
|
|
- Extract milestone definition of done from ROADMAP.md
|
|
- Extract requirements mapped to this milestone from REQUIREMENTS.md
|
|
|
|
## 2. Read All Phase Verifications
|
|
|
|
For each phase directory, read the VERIFICATION.md:
|
|
|
|
```bash
|
|
cat .planning/phases/01-*/*-VERIFICATION.md
|
|
cat .planning/phases/02-*/*-VERIFICATION.md
|
|
# etc.
|
|
```
|
|
|
|
From each VERIFICATION.md, extract:
|
|
- **Status:** passed | gaps_found
|
|
- **Critical gaps:** (if any — these are blockers)
|
|
- **Non-critical gaps:** tech debt, deferred items, warnings
|
|
- **Anti-patterns found:** TODOs, stubs, placeholders
|
|
- **Requirements coverage:** which requirements satisfied/blocked
|
|
|
|
If a phase is missing VERIFICATION.md, flag it as "unverified phase" — this is a blocker.
|
|
|
|
## 3. Spawn Integration Checker
|
|
|
|
With phase context collected:
|
|
|
|
```
|
|
Task(
|
|
prompt="Check cross-phase integration and E2E flows.
|
|
|
|
Phases: {phase_dirs}
|
|
Phase exports: {from SUMMARYs}
|
|
API routes: {routes created}
|
|
|
|
Verify cross-phase wiring and E2E user flows.",
|
|
subagent_type="gsd-integration-checker",
|
|
model="{integration_checker_model}"
|
|
)
|
|
```
|
|
|
|
## 4. Collect Results
|
|
|
|
Combine:
|
|
- Phase-level gaps and tech debt (from step 2)
|
|
- Integration checker's report (wiring gaps, broken flows)
|
|
|
|
## 5. Check Requirements Coverage
|
|
|
|
For each requirement in REQUIREMENTS.md mapped to this milestone:
|
|
- Find owning phase
|
|
- Check phase verification status
|
|
- Determine: satisfied | partial | unsatisfied
|
|
|
|
## 6. Aggregate into v{version}-MILESTONE-AUDIT.md
|
|
|
|
Create `.planning/v{version}-v{version}-MILESTONE-AUDIT.md` with:
|
|
|
|
```yaml
|
|
---
|
|
milestone: {version}
|
|
audited: {timestamp}
|
|
status: passed | gaps_found | tech_debt
|
|
scores:
|
|
requirements: N/M
|
|
phases: N/M
|
|
integration: N/M
|
|
flows: N/M
|
|
gaps: # Critical blockers
|
|
requirements: [...]
|
|
integration: [...]
|
|
flows: [...]
|
|
tech_debt: # Non-critical, deferred
|
|
- phase: 01-auth
|
|
items:
|
|
- "TODO: add rate limiting"
|
|
- "Warning: no password strength validation"
|
|
- phase: 03-dashboard
|
|
items:
|
|
- "Deferred: mobile responsive layout"
|
|
---
|
|
```
|
|
|
|
Plus full markdown report with tables for requirements, phases, integration, tech debt.
|
|
|
|
**Status values:**
|
|
- `passed` — all requirements met, no critical gaps, minimal tech debt
|
|
- `gaps_found` — critical blockers exist
|
|
- `tech_debt` — no blockers but accumulated deferred items need review
|
|
|
|
## 7. Present Results
|
|
|
|
Route by status (see `<offer_next>`).
|
|
|
|
</process>
|
|
|
|
<offer_next>
|
|
Output this markdown directly (not as a code block). Route based on status:
|
|
|
|
---
|
|
|
|
**If passed:**
|
|
|
|
## ✓ Milestone {version} — Audit Passed
|
|
|
|
**Score:** {N}/{M} requirements satisfied
|
|
**Report:** .planning/v{version}-MILESTONE-AUDIT.md
|
|
|
|
All requirements covered. Cross-phase integration verified. E2E flows complete.
|
|
|
|
───────────────────────────────────────────────────────────────
|
|
|
|
## ▶ Next Up
|
|
|
|
**Complete milestone** — archive and tag
|
|
|
|
/gsd:complete-milestone {version}
|
|
|
|
<sub>/clear first → fresh context window</sub>
|
|
|
|
───────────────────────────────────────────────────────────────
|
|
|
|
---
|
|
|
|
**If gaps_found:**
|
|
|
|
## ⚠ Milestone {version} — Gaps Found
|
|
|
|
**Score:** {N}/{M} requirements satisfied
|
|
**Report:** .planning/v{version}-MILESTONE-AUDIT.md
|
|
|
|
### Unsatisfied Requirements
|
|
|
|
{For each unsatisfied requirement:}
|
|
- **{REQ-ID}: {description}** (Phase {X})
|
|
- {reason}
|
|
|
|
### Cross-Phase Issues
|
|
|
|
{For each integration gap:}
|
|
- **{from} → {to}:** {issue}
|
|
|
|
### Broken Flows
|
|
|
|
{For each flow gap:}
|
|
- **{flow name}:** breaks at {step}
|
|
|
|
───────────────────────────────────────────────────────────────
|
|
|
|
## ▶ Next Up
|
|
|
|
**Plan gap closure** — create phases to complete milestone
|
|
|
|
/gsd:plan-milestone-gaps
|
|
|
|
<sub>/clear first → fresh context window</sub>
|
|
|
|
───────────────────────────────────────────────────────────────
|
|
|
|
**Also available:**
|
|
- cat .planning/v{version}-MILESTONE-AUDIT.md — see full report
|
|
- /gsd:complete-milestone {version} — proceed anyway (accept tech debt)
|
|
|
|
───────────────────────────────────────────────────────────────
|
|
|
|
---
|
|
|
|
**If tech_debt (no blockers but accumulated debt):**
|
|
|
|
## ⚡ Milestone {version} — Tech Debt Review
|
|
|
|
**Score:** {N}/{M} requirements satisfied
|
|
**Report:** .planning/v{version}-MILESTONE-AUDIT.md
|
|
|
|
All requirements met. No critical blockers. Accumulated tech debt needs review.
|
|
|
|
### Tech Debt by Phase
|
|
|
|
{For each phase with debt:}
|
|
**Phase {X}: {name}**
|
|
- {item 1}
|
|
- {item 2}
|
|
|
|
### Total: {N} items across {M} phases
|
|
|
|
───────────────────────────────────────────────────────────────
|
|
|
|
## ▶ Options
|
|
|
|
**A. Complete milestone** — accept debt, track in backlog
|
|
|
|
/gsd:complete-milestone {version}
|
|
|
|
**B. Plan cleanup phase** — address debt before completing
|
|
|
|
/gsd:plan-milestone-gaps
|
|
|
|
<sub>/clear first → fresh context window</sub>
|
|
|
|
───────────────────────────────────────────────────────────────
|
|
</offer_next>
|
|
|
|
<success_criteria>
|
|
- [ ] Milestone scope identified
|
|
- [ ] All phase VERIFICATION.md files read
|
|
- [ ] Tech debt and deferred gaps aggregated
|
|
- [ ] Integration checker spawned for cross-phase wiring
|
|
- [ ] v{version}-MILESTONE-AUDIT.md created
|
|
- [ ] Results presented with actionable next steps
|
|
</success_criteria>
|