Tom Boucher
8090456b66
feat(3555): QueryRuntimeBridge.executeForCjs synchronous primitive (Phase 5.0 of #3524 )
...
Phase 5.0 of the CJS↔SDK hard-seam migration (parent #3524 ).
Foundational PR. Ships ONLY the synchronous primitive on the SDK
runtime bridge plus pinning tests. Per-family CJS router migrations
(state.*, verify.*, init.*, phase.*, phases.*, validate.*,
roadmap.*, frontmatter.*, config.*) become follow-up enhancements
that each reuse this primitive.
## What landed
- sdk/src/runtime-bridge-sync/index.ts (155 lines) — public API.
Exports executeForCjs(input: RuntimeBridgeExecuteInput):
RuntimeBridgeSyncResult. Synchronous; lazily creates the
synckit sync function on first call.
- sdk/src/runtime-bridge-sync/worker.ts (167 lines) — synckit
worker. Constructs a native-only QueryRuntimeBridge (with
allowFallbackToSubprocess: false), awaits its async execute,
catches GSDToolsError / GSDError, maps classification to the
six ADR-0001 canonical error kinds plus exit code.
- sdk/src/runtime-bridge-sync/index.test.ts (197 lines, 8 vitest
pinning fixtures) — success path; unknown_command;
native_failure (shape); validation_error (shape); shape
invariants; idempotency.
- tests/runtime-bridge-sync-smoke.test.cjs (99 lines, 4
node:test cases) — proves the primitive works from CJS
callers via require().
## Decisions
1. Synchronous-bridging mechanism: synckit. Disqualified:
- deasync: stagnant (68 open issues, single maintainer,
last release Nov 2025), private Node API (process.binding('uv')),
untested on Node 22, documented deadlocks with modern
Promise chains.
- Sync-native SDK refactor: technically infeasible —
acquireStateLock in state-mutation.ts uses await setTimeout
for retry backoff; making that fully sync requires either
Atomics.wait (which IS synckit), busy-loop (degrades
responsiveness), or breaking 100+ SDK consumers.
Synckit (v0.11.12) is pure JS, actively maintained (last
push today), stable public APIs (Atomics.wait +
SharedArrayBuffer), Node 22 compatible, no native compile.
2. Native-only transport inside the worker. The sync bridge
uses allowFallbackToSubprocess: false. Unknown commands
surface as unknown_command instead of spawning gsd-sdk.
Keeps the worker self-contained and predictable.
3. Worker path resolution. resolveWorkerPath() navigates ../..
from the loaded module URL to land at
dist/runtime-bridge-sync/worker.js — works under both
vitest (loads src) and CJS consumers (load dist).
4. GSDError.Blocked → validation_error. ADR-0001's 6-kind
taxonomy has no `blocked` kind; Blocked classification is
mapped onto validation_error since the operational shape
matches (prerequisite missing).
## Numbers
- 8 SDK vitest pinning tests pass.
- 4 CJS smoke tests pass.
- Full suite: 9286/9286 pass (baseline 9282; +4 from the
new smoke test cases).
- SDK vitest unit: 1860/1860 pass.
- Performance: 80ms first-call cold latency (Worker startup +
bridge construction); 0.1ms steady-state per-call latency
(10-call average after warmup). Well within budget for CJS
dispatcher overhead.
## Canonical error kind coverage
- unknown_command: covered with pinning fixture
- native_failure: shape coverage (handler that throws)
- validation_error: shape coverage (GSDError.Validation +
GSDError.Blocked)
- internal_error: shape coverage only (eliciting TypeError
reliably from a registered handler requires elaborate fixture)
- native_timeout: NOT pinned (no registered handler genuinely
times out; classification logic present in worker)
- fallback_failure: NOT pinned (subprocess fallback disabled
by design in sync bridge)
The classification logic is in the worker regardless; per-family
migration PRs will exercise the unpinned kinds incidentally.
## Wiring
- sdk/package.json: synckit ^0.11.12 added as runtime
dependency (not devDependency — it's required at runtime
whenever a CJS caller invokes executeForCjs).
- sdk/package-lock.json: regenerated.
- CONTEXT.md: new "Sync Runtime Bridge Module" entry added
after Dispatch Policy Module. Existing "CJS Command Router
Adapter Module" entry amended with one sentence pointing at
the primitive and the per-family migration roadmap.
No generator/freshness check needed for this phase — the
primitive IS the SDK (not a generated CJS mirror).
Closes #3555 .
2026-05-15 11:10:03 -04:00
..
2026-05-13 21:19:47 -04:00
2026-05-09 11:47:15 -04:00
2026-05-09 00:15:04 -04:00
2026-05-11 23:01:34 -04:00
2026-04-25 10:50:54 -04:00
2026-04-04 14:29:03 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-04-25 10:50:54 -04:00
2026-04-11 03:39:29 -07:00
2026-04-20 09:31:34 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-05-13 19:34:23 -04:00
2026-05-01 19:50:10 -04:00
2026-04-04 14:29:03 -04:00
2026-04-25 10:50:54 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-04-04 07:24:31 -04:00
2026-04-11 08:50:44 -04:00
2026-04-07 08:13:52 -04:00
2026-04-05 17:49:20 -04:00
2026-05-02 11:45:33 -04:00
2026-04-05 18:05:32 -04:00
2026-05-08 21:25:37 -04:00
2026-04-19 16:35:32 -05:00
2026-04-25 11:34:55 -04:00
2026-05-12 19:02:18 -04:00
2026-04-07 17:19:10 -04:00
2026-05-01 19:50:10 -04:00
2026-04-10 10:48:00 -04:00
2026-05-01 19:50:10 -04:00
2026-04-11 03:37:34 -07:00
2026-04-10 10:50:17 -04:00
2026-04-10 11:19:32 -04:00
2026-04-10 11:25:55 -04:00
2026-04-10 11:15:59 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-05-06 15:42:46 -04:00
2026-04-15 14:58:41 -04:00
2026-04-23 11:58:06 -04:00
2026-04-17 09:20:26 -04:00
2026-05-04 23:18:41 -04:00
2026-04-22 10:41:58 -04:00
2026-04-25 12:02:58 -04:00
2026-04-17 09:20:42 -04:00
2026-04-29 07:56:51 -04:00
2026-04-20 18:37:42 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-04-20 10:09:33 -04:00
2026-05-11 15:27:35 -04:00
2026-05-01 19:50:10 -04:00
2026-04-30 00:43:47 -04:00
2026-05-01 19:50:10 -04:00
2026-04-20 10:11:00 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-04-20 10:08:46 -04:00
2026-05-01 19:50:10 -04:00
2026-05-15 00:02:56 -04:00
2026-04-21 09:46:01 -04:00
2026-05-01 19:50:10 -04:00
2026-04-21 21:20:27 -04:00
2026-04-21 10:10:10 -04:00
2026-05-01 19:50:10 -04:00
2026-04-22 12:09:12 -04:00
2026-04-22 10:41:58 -04:00
2026-04-21 20:33:43 -04:00
2026-05-03 16:31:48 -04:00
2026-04-21 21:18:58 -04:00
2026-05-06 15:19:34 -04:00
2026-05-12 21:53:24 -04:00
2026-04-22 12:04:17 -04:00
2026-05-01 19:50:10 -04:00
2026-04-22 12:03:56 -04:00
2026-05-12 19:02:18 -04:00
2026-05-01 19:50:10 -04:00
2026-04-25 12:09:27 -04:00
2026-04-24 18:05:10 -04:00
2026-04-24 18:10:45 -04:00
2026-04-24 18:05:33 -04:00
2026-04-29 22:56:59 -04:00
2026-05-09 14:21:42 -04:00
2026-05-02 09:27:23 -04:00
2026-04-24 20:22:17 -04:00
2026-04-24 20:22:29 -04:00
2026-05-01 19:50:10 -04:00
2026-04-25 12:10:01 -04:00
2026-04-25 12:16:04 -04:00
2026-04-25 12:10:01 -04:00
2026-04-25 12:15:39 -04:00
2026-05-02 09:27:23 -04:00
2026-05-14 13:52:55 -04:00
2026-05-14 13:17:39 -04:00
2026-04-27 12:31:43 -04:00
2026-04-27 12:31:49 -04:00
2026-05-01 19:50:10 -04:00
2026-05-11 14:36:14 -04:00
2026-05-01 19:50:10 -04:00
2026-04-27 12:31:26 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-04-28 20:37:47 -04:00
2026-04-28 20:22:59 -04:00
2026-04-28 20:23:32 -04:00
2026-04-28 20:16:27 -04:00
2026-05-02 09:27:23 -04:00
2026-04-28 20:21:44 -04:00
2026-04-29 21:52:20 -04:00
2026-04-28 20:21:48 -04:00
2026-04-28 20:23:29 -04:00
2026-05-01 19:50:10 -04:00
2026-04-29 07:59:30 -04:00
2026-05-01 19:50:10 -04:00
2026-04-29 08:00:17 -04:00
2026-05-02 09:27:23 -04:00
2026-04-29 07:56:32 -04:00
2026-04-29 21:52:20 -04:00
2026-04-29 21:51:58 -04:00
2026-04-29 23:27:27 -04:00
2026-04-30 17:30:19 -04:00
2026-04-30 21:08:26 -04:00
2026-04-30 21:57:27 -04:00
2026-05-01 09:23:02 -04:00
2026-05-01 09:22:13 -04:00
2026-05-02 09:27:23 -04:00
2026-05-12 21:53:24 -04:00
2026-05-12 21:53:24 -04:00
2026-05-12 21:53:24 -04:00
2026-05-12 21:53:24 -04:00
2026-05-01 13:04:39 -04:00
2026-05-01 16:10:30 -04:00
2026-05-01 17:25:20 -04:00
2026-05-01 15:15:20 -04:00
2026-05-01 15:15:20 -04:00
2026-05-02 00:29:34 -04:00
2026-05-02 00:29:45 -04:00
2026-05-12 17:32:50 -04:00
2026-05-01 17:25:20 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 17:25:20 -04:00
2026-05-01 21:13:25 -04:00
2026-05-01 17:39:35 -04:00
2026-05-02 00:29:43 -04:00
2026-05-02 00:29:31 -04:00
2026-05-02 00:29:34 -04:00
2026-05-02 00:29:34 -04:00
2026-05-01 21:14:14 -04:00
2026-05-02 09:30:58 -04:00
2026-05-12 18:16:36 -04:00
2026-05-02 11:45:36 -04:00
2026-05-02 11:45:33 -04:00
2026-05-02 11:45:39 -04:00
2026-05-11 14:36:14 -04:00
2026-05-02 17:44:52 -04:00
2026-05-04 22:06:22 -04:00
2026-05-04 23:34:57 -04:00
2026-05-04 23:30:35 -04:00
2026-05-04 23:28:52 -04:00
2026-05-04 22:52:30 -04:00
2026-05-14 12:06:36 -04:00
2026-05-05 15:02:03 -04:00
2026-05-04 23:18:41 -04:00
2026-05-05 15:02:23 -04:00
2026-05-05 15:02:26 -04:00
2026-05-05 15:02:19 -04:00
2026-05-05 15:02:11 -04:00
2026-05-05 15:02:30 -04:00
2026-05-09 11:39:31 -04:00
2026-05-05 15:02:15 -04:00
2026-05-05 15:01:59 -04:00
2026-05-05 15:02:38 -04:00
2026-05-05 18:53:35 -04:00
2026-05-06 21:51:38 -04:00
2026-05-06 21:51:38 -04:00
2026-05-06 15:38:53 -04:00
2026-05-06 11:56:27 -04:00
2026-05-06 15:00:08 -04:00
2026-05-06 22:06:56 -04:00
2026-05-06 21:51:32 -04:00
2026-05-06 21:51:42 -04:00
2026-05-09 02:49:19 -04:00
2026-05-15 00:02:56 -04:00
2026-05-08 08:40:53 -04:00
2026-05-08 09:39:33 -04:00
2026-05-08 08:40:41 -04:00
2026-05-09 14:21:42 -04:00
2026-05-08 08:40:36 -04:00
2026-05-08 10:25:59 -04:00
2026-05-08 09:26:35 -04:00
2026-05-08 09:06:37 -04:00
2026-05-08 23:53:21 -04:00
2026-05-13 18:33:32 -04:00
2026-05-09 07:42:22 -04:00
2026-05-09 07:40:56 -04:00
2026-05-09 07:32:31 -04:00
2026-05-09 07:40:17 -04:00
2026-05-09 11:39:15 -04:00
2026-05-09 11:47:15 -04:00
2026-05-09 19:27:36 -04:00
2026-05-10 17:37:55 -04:00
2026-05-14 12:59:38 -04:00
2026-05-14 13:17:39 -04:00
2026-05-10 17:40:39 -04:00
2026-05-10 17:38:36 -04:00
2026-05-10 20:25:42 -04:00
2026-05-10 19:48:28 -04:00
2026-05-13 18:33:32 -04:00
2026-05-12 20:15:43 -04:00
2026-05-11 22:09:59 -04:00
2026-05-12 18:50:50 -04:00
2026-05-14 13:30:59 -04:00
2026-05-12 18:50:35 -04:00
2026-05-12 18:50:19 -04:00
2026-05-12 19:19:04 -04:00
2026-05-12 20:15:43 -04:00
2026-05-12 20:49:43 -04:00
2026-05-12 21:20:54 -04:00
2026-05-13 13:54:30 -04:00
2026-05-14 07:47:18 -04:00
2026-05-14 09:11:59 -04:00
2026-05-14 12:49:48 -04:00
2026-05-14 19:00:32 -04:00
2026-05-14 17:40:45 -04:00
2026-05-14 19:02:06 -04:00
2026-05-14 19:47:48 -04:00
2026-05-14 23:17:38 -04:00
2026-05-15 09:16:41 -04:00
2026-05-15 08:16:26 -04:00
2026-05-01 19:50:10 -04:00
2026-04-23 08:36:03 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 18:12:20 -04:00
2026-05-10 19:23:22 -04:00
2026-05-01 18:12:20 -04:00
2026-05-01 18:12:20 -04:00
2026-05-01 18:12:20 -04:00
2026-05-01 18:12:20 -04:00
2026-05-01 18:12:20 -04:00
2026-05-01 19:50:10 -04:00
2026-04-11 09:15:36 -04:00
2026-05-12 21:53:24 -04:00
2026-05-01 19:50:10 -04:00
2026-04-20 09:31:34 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-05-08 23:53:32 -04:00
2026-04-12 08:10:30 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-05-14 20:01:32 -04:00
2026-05-05 16:06:29 -04:00
2026-05-09 02:49:19 -04:00
2026-05-14 20:01:32 -04:00
2026-04-05 17:02:20 -04:00
2026-04-10 10:56:09 -04:00
2026-05-13 20:46:02 -04:00
2026-04-25 11:34:55 -04:00
2026-04-07 17:25:11 -04:00
2026-05-01 19:50:10 -04:00
2026-05-15 08:14:28 -04:00
2026-04-15 16:46:10 -04:00
2026-05-15 00:02:56 -04:00
2026-05-15 00:02:56 -04:00
2026-05-01 19:50:10 -04:00
2026-04-30 01:04:41 -04:00
2026-05-09 11:39:24 -04:00
2026-05-06 15:34:29 -04:00
2026-05-13 20:46:02 -04:00
2026-04-11 09:20:27 -04:00
2026-04-04 14:29:03 -04:00
2026-05-01 19:50:10 -04:00
2026-05-13 14:11:02 -04:00
2026-04-05 09:15:41 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-04-25 11:34:55 -04:00
2026-05-01 19:50:10 -04:00
2026-05-14 12:43:48 -04:00
2026-05-09 02:49:19 -04:00
2026-04-01 08:47:31 -06:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-04-25 16:26:15 -04:00
2026-05-05 15:44:59 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-05-06 21:51:29 -04:00
2026-04-25 14:23:40 -04:00
2026-04-22 12:04:21 -04:00
2026-04-29 08:14:11 -04:00
2026-05-05 10:51:10 -04:00
2026-05-09 02:49:19 -04:00
2026-04-30 00:48:49 -04:00
2026-05-14 16:38:05 -04:00
2026-05-06 11:59:53 -04:00
2026-05-11 23:01:34 -04:00
2026-05-09 11:46:28 -04:00
2026-05-06 21:51:38 -04:00
2026-05-01 19:50:10 -04:00
2026-05-10 19:48:28 -04:00
2026-05-09 00:25:05 -04:00
2026-05-01 19:50:10 -04:00
2026-05-06 21:51:38 -04:00
2026-05-01 19:50:10 -04:00
2026-05-05 16:06:29 -04:00
2026-04-22 20:49:52 -04:00
2026-05-12 21:53:24 -04:00
2026-05-02 23:12:50 -04:00
2026-05-02 13:19:15 -04:00
2026-05-02 14:26:35 -04:00
2026-05-02 15:24:26 -04:00
2026-05-11 15:27:40 -04:00
2026-05-15 00:02:56 -04:00
2026-05-13 21:19:47 -04:00
2026-05-09 11:46:40 -04:00
2026-05-09 11:46:34 -04:00
2026-05-09 11:39:31 -04:00
2026-05-09 23:29:11 -04:00
2026-05-09 13:54:06 -04:00
2026-04-05 18:33:17 -04:00
2026-05-01 19:50:10 -04:00
2026-05-14 12:43:48 -04:00
2026-04-26 21:40:38 -04:00
2026-05-01 19:50:10 -04:00
2026-05-10 17:39:06 -04:00
2026-05-06 21:51:38 -04:00
2026-05-02 09:27:23 -04:00
2026-05-01 19:50:10 -04:00
2026-05-06 21:01:25 -04:00
2026-05-06 21:51:38 -04:00
2026-05-12 21:53:24 -04:00
2026-05-05 18:34:42 -04:00
2026-04-15 22:46:31 -04:00
2026-04-04 14:37:54 -04:00
2026-04-04 14:29:03 -04:00
2026-05-02 11:45:33 -04:00
2026-04-30 22:48:08 -04:00
2026-05-01 19:50:10 -04:00
2026-04-04 14:29:03 -04:00
2026-04-20 09:31:34 -04:00
2026-05-02 09:27:23 -04:00
2026-05-01 19:50:10 -04:00
2026-05-06 20:27:33 -04:00
2026-04-15 14:59:07 -04:00
2026-05-04 23:03:10 -04:00
2026-04-27 12:31:49 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-05-14 13:27:12 -04:00
2026-05-13 17:12:53 -04:00
2026-05-13 17:12:53 -04:00
2026-05-12 20:15:43 -04:00
2026-05-13 12:45:16 -04:00
2026-05-13 12:45:16 -04:00
2026-05-13 17:12:53 -04:00
2026-05-13 12:45:16 -04:00
2026-05-13 12:45:16 -04:00
2026-05-11 14:36:14 -04:00
2026-05-14 13:27:12 -04:00
2026-05-15 08:16:28 -04:00
2026-05-11 15:07:50 -04:00
2026-04-15 14:59:24 -04:00
2026-05-01 19:50:10 -04:00
2026-04-20 09:39:05 -04:00
2026-04-20 09:39:05 -04:00
2026-05-01 19:50:10 -04:00
2026-04-26 13:33:54 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-04-05 19:09:14 -04:00
2026-05-13 12:45:16 -04:00
2026-04-30 11:38:13 -04:00
2026-04-14 17:57:38 -04:00
2026-05-01 19:50:10 -04:00
2026-04-04 14:29:03 -04:00
2026-05-01 19:50:10 -04:00
2026-04-25 11:34:55 -04:00
2026-05-01 19:50:10 -04:00
2026-05-12 21:53:24 -04:00
2026-04-26 11:48:47 -04:00
2026-05-09 00:15:04 -04:00
2026-05-08 21:25:37 -04:00
2026-04-30 22:48:08 -04:00
2026-05-06 21:51:38 -04:00
2026-05-06 21:51:38 -04:00
2026-05-06 21:51:38 -04:00
2026-04-05 18:05:32 -04:00
2026-05-06 21:51:38 -04:00
2026-04-07 08:13:46 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 16:10:30 -04:00
2026-05-01 19:50:10 -04:00
2026-05-09 00:15:04 -04:00
2026-05-01 19:50:10 -04:00
2026-05-08 09:08:06 -04:00
2026-04-06 15:13:23 -04:00
2026-05-01 19:50:10 -04:00
2026-05-14 10:21:11 -04:00
2026-04-16 17:15:29 -04:00
2026-04-04 14:29:03 -04:00
2026-04-11 15:02:55 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-05-11 21:13:07 -04:00
2026-04-30 14:10:28 -04:00
2026-04-04 14:29:03 -04:00
2026-04-25 12:02:58 -04:00
2026-05-06 21:51:38 -04:00
2026-05-01 19:50:10 -04:00
2026-05-15 00:02:56 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-05-06 21:51:38 -04:00
2026-04-30 11:38:13 -04:00
2026-05-01 19:50:10 -04:00
2026-04-30 12:13:55 -04:00
2026-05-11 22:45:33 -04:00
2026-04-30 14:19:46 -04:00
2026-04-30 14:19:46 -04:00
2026-05-01 19:50:10 -04:00
2026-05-09 14:21:42 -04:00
2026-05-14 12:43:48 -04:00
2026-05-01 19:50:10 -04:00
2026-05-06 21:51:38 -04:00
2026-05-15 10:07:10 -04:00
2026-05-14 09:11:59 -04:00
2026-05-01 19:50:10 -04:00
2026-05-04 23:28:20 -04:00
2026-04-30 21:57:27 -04:00
2026-04-04 14:29:03 -04:00
2026-04-05 10:23:41 -04:00
2026-05-01 19:50:10 -04:00
2026-04-11 11:19:47 -04:00
2026-05-01 19:50:10 -04:00
2026-04-04 14:29:03 -04:00
2026-05-01 19:50:10 -04:00
2026-04-16 17:22:31 -04:00
2026-04-30 00:43:47 -04:00
2026-04-30 00:43:47 -04:00
2026-05-13 14:10:15 -04:00
2026-05-13 14:10:15 -04:00
2026-05-13 14:10:15 -04:00
2026-04-26 13:33:45 -04:00
2026-04-30 14:10:28 -04:00
2026-05-06 21:51:38 -04:00
2026-04-23 11:53:20 -04:00
2026-05-10 14:43:53 -05:00
2026-05-15 11:10:03 -04:00
2026-05-10 17:39:06 -04:00
2026-05-01 19:50:10 -04:00
2026-04-01 16:53:20 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-05-02 09:27:23 -04:00
2026-04-20 10:08:18 -04:00
2026-05-01 19:50:10 -04:00
2026-04-04 07:10:21 -04:00
2026-05-12 21:53:24 -04:00
2026-05-01 19:50:10 -04:00
2026-04-10 13:55:27 -04:00
2026-05-13 17:12:53 -04:00
2026-05-09 02:49:19 -04:00
2026-05-08 09:06:43 -04:00
2026-05-14 22:17:20 -04:00
2026-04-11 15:02:55 -04:00
2026-05-08 23:53:21 -04:00
2026-05-06 21:51:38 -04:00
2026-05-01 19:50:10 -04:00
2026-05-13 12:45:16 -04:00
2026-05-13 12:45:16 -04:00
2026-05-13 12:45:16 -04:00
2026-05-13 12:45:16 -04:00
2026-05-13 12:45:16 -04:00
2026-04-11 15:39:50 -04:00
2026-04-11 09:15:00 -04:00
2026-05-01 19:50:10 -04:00
2026-04-05 17:49:20 -04:00
2026-05-01 19:50:10 -04:00
2026-05-05 15:44:59 -04:00
2026-05-02 16:33:16 -04:00
2026-04-20 10:08:18 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 09:22:13 -04:00
2026-05-12 21:53:24 -04:00
2026-04-12 17:56:19 -04:00
2026-04-25 16:26:15 -04:00
2026-05-06 21:51:38 -04:00
2026-05-01 19:50:10 -04:00
2026-05-06 21:51:38 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-04-04 14:29:03 -04:00
2026-05-01 19:50:10 -04:00
2026-04-04 14:29:03 -04:00
2026-04-06 08:40:37 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-05-06 21:51:38 -04:00
2026-04-30 00:43:47 -04:00
2026-05-15 09:35:02 -04:00
2026-05-09 14:21:42 -04:00
2026-05-01 19:50:10 -04:00
2026-05-01 19:50:10 -04:00
2026-05-13 18:33:32 -04:00
2026-05-01 19:50:10 -04:00
2026-04-04 14:29:03 -04:00