docs(19.1-06): record plan progress after maps and goldens SUMMARY

Co-authored-by: Cursor <cursoragent@cursor.com>
This commit is contained in:
Jakub Zych
2026-10-18 16:02:15 +02:00
parent 7e51959b14
commit 32617944a9
2 changed files with 14 additions and 10 deletions

View File

@@ -1235,7 +1235,7 @@ Plans:
3. Already met: fonoteka's PHP userfriends tree equals Wavepath 182b514; fonoteka.go has no port and Wavepath's copy is the single source.
4. The new code has unit tests, delivered in the phase's last plan.
**Plans:** 5/6 plans executed
**Plans:** 6/6 plans executed
Plans:
**Wave 1**
@@ -1248,7 +1248,7 @@ Plans:
- [x] 19.1-05-PLAN.md — LiveKit v2 note, then chatvideo sessions, authorizer, generic reconciler
**Wave 3** *(blocked on Waves 1–2)*
- [ ] 19.1-06-PLAN.md — PHP method maps, goldens, scripts/check-phase19.1.sh
- [x] 19.1-06-PLAN.md — PHP method maps, goldens, scripts/check-phase19.1.sh
### Phase 19.2: Chat polish against WavePath clients (INSERTED)
@@ -1434,7 +1434,7 @@ Phases execute in numeric order: 1 → 2 → 3 → 4 → 5 → 6 → 7 → 8 →
| 18. Payment Gateway | 8/8 | Complete | 2026-10-14 |
| 18.1. Payment Gateway Subscriptions | 9/9 | Complete | 2026-10-16 |
| 19. Chat and ChatChannels | 7/7 | Complete | 2026-10-17 |
| 19.1. Chat satellites | 5/6 | In Progress| |
| 19.1. Chat satellites | 6/6 | In Progress| |
| 19.2. Chat polish against WavePath clients | 0/TBD | Not started | - |
| 19.3. Framework transport and infrastructure for WavePath | 6/6 | In Progress| |
| 19.4. OIDC provider on wristband | 0/TBD | Not started | - |

View File

@@ -4,16 +4,16 @@ milestone: v1.0
current_phase: "19.1"
current_phase_name: Chat satellites
status: executing
stopped_at: Completed 19.1-02-PLAN.md
last_updated: "2026-10-18T13:42:14.977Z"
stopped_at: Completed 19.1-06-PLAN.md
last_updated: "2026-10-18T14:02:15.837Z"
last_activity: 2026-10-18
last_activity_desc: "Completed quick task 261018-k9s: add the D-17 module in summercms.go (modules/breakwater); 19.1-02 forum plan unblocked"
state_head: 1f204f5a6c2d2289d434105e0e22f94693ae5705
state_head: 7e51959b14b03ef5f1854e974b9927a5a73e57cb
progress:
total_phases: 41
completed_phases: 33
total_plans: 204
completed_plans: 203
completed_plans: 204
gsd_state_version: "1.0"
milestone_name: milestone
---
@@ -30,7 +30,7 @@ See: .planning/PROJECT.md (updated 2026-10-12)
## Current Position
Phase: 19.1 (Chat satellites) — EXECUTING
Plan: 5 of 6
Plan: 6 of 6
Status: Ready to execute
Last activity: 2026-10-18 — Completed quick task 261018-k9s: add the D-17 module in summercms.go (modules/breakwater); 19.1-02 forum plan unblocked
@@ -256,6 +256,7 @@ Progress: [████████░░] 80%
| Phase 19.1-chat-satellites P19.1-04 | 11 | 4 tasks | 35 files |
| Phase 19.1-chat-satellites P19.1-05 | 10min | 4 tasks | 37 files |
| Phase 19.1 P19.1-02 | 9 min | 4 tasks | 36 files |
| Phase 19.1 P19.1-06 | 16 | 3 tasks | 46 files |
## Accumulated Context
@@ -867,6 +868,9 @@ Recent decisions affecting current work:
- [Phase 19.1]: Task 2 reply verbatim: proceed — Human locked D-02 baseline id 202610180001_create_golem15_forum_baseline and D-05 prefix /_forum/api/v1 before the sibling repo existed. Remote policy follows plan 01 proceed-and-push.
- [Phase 19.1]: Locked D-02 baseline id 202610180001_create_golem15_forum_baseline and D-05 prefix /_forum/api/v1; remote policy follows plan 01 proceed-and-push — Continuation recorded the lock from the human proceed reply; Task 1 and Task 2 were not re-asked.
- [Phase 19.1]: tea repos create --owner golem15 --name sm-forum-plugin succeeded; main pushed at 6a40030 (never force). summercms.go was not pushed. — Plan 01 remote policy proceed-and-push; tea-create only after Task 4 green.
- [Phase 19.1]: Goldens from PHP fixtures; live capture NOT RUN — No live PHP Wavepath backend was reachable.
- [Phase 19.1]: Execute should now run the security-review agent; this execute did not spawn it — Five APIs, push sender, token issuer, sanitizer boundary, and GDPR cascades now exist.
- [Phase 19.1]: Gate named-short vs postgres split follows the skip detector — TestHTTPTracer and TestReconcileEmptyRoom skip under -short; a skip is refuse.
### Pending Todos
@@ -950,6 +954,6 @@ Items acknowledged and carried forward from previous milestone close:
## Session Continuity
Last session: 2026-10-18T13:41:50.737Z
Stopped at: Completed 19.1-02-PLAN.md
Last session: 2026-10-18T14:01:53.356Z
Stopped at: Completed 19.1-06-PLAN.md
Resume file: None