docs(19.1-06): record plan progress after maps and goldens SUMMARY

Co-authored-by: Cursor <cursoragent@cursor.com>
This commit is contained in:
Jakub Zych
2026-10-18 16:02:15 +02:00
parent 7e51959b14
commit 32617944a9
2 changed files with 14 additions and 10 deletions

View File

@@ -1235,7 +1235,7 @@ Plans:
3. Already met: fonoteka's PHP userfriends tree equals Wavepath 182b514; fonoteka.go has no port and Wavepath's copy is the single source. 3. Already met: fonoteka's PHP userfriends tree equals Wavepath 182b514; fonoteka.go has no port and Wavepath's copy is the single source.
4. The new code has unit tests, delivered in the phase's last plan. 4. The new code has unit tests, delivered in the phase's last plan.
**Plans:** 5/6 plans executed **Plans:** 6/6 plans executed
Plans: Plans:
**Wave 1** **Wave 1**
@@ -1248,7 +1248,7 @@ Plans:
- [x] 19.1-05-PLAN.md — LiveKit v2 note, then chatvideo sessions, authorizer, generic reconciler - [x] 19.1-05-PLAN.md — LiveKit v2 note, then chatvideo sessions, authorizer, generic reconciler
**Wave 3** *(blocked on Waves 1–2)* **Wave 3** *(blocked on Waves 1–2)*
- [ ] 19.1-06-PLAN.md — PHP method maps, goldens, scripts/check-phase19.1.sh - [x] 19.1-06-PLAN.md — PHP method maps, goldens, scripts/check-phase19.1.sh
### Phase 19.2: Chat polish against WavePath clients (INSERTED) ### Phase 19.2: Chat polish against WavePath clients (INSERTED)
@@ -1434,7 +1434,7 @@ Phases execute in numeric order: 1 → 2 → 3 → 4 → 5 → 6 → 7 → 8 →
| 18. Payment Gateway | 8/8 | Complete | 2026-10-14 | | 18. Payment Gateway | 8/8 | Complete | 2026-10-14 |
| 18.1. Payment Gateway Subscriptions | 9/9 | Complete | 2026-10-16 | | 18.1. Payment Gateway Subscriptions | 9/9 | Complete | 2026-10-16 |
| 19. Chat and ChatChannels | 7/7 | Complete | 2026-10-17 | | 19. Chat and ChatChannels | 7/7 | Complete | 2026-10-17 |
| 19.1. Chat satellites | 5/6 | In Progress| | | 19.1. Chat satellites | 6/6 | In Progress| |
| 19.2. Chat polish against WavePath clients | 0/TBD | Not started | - | | 19.2. Chat polish against WavePath clients | 0/TBD | Not started | - |
| 19.3. Framework transport and infrastructure for WavePath | 6/6 | In Progress| | | 19.3. Framework transport and infrastructure for WavePath | 6/6 | In Progress| |
| 19.4. OIDC provider on wristband | 0/TBD | Not started | - | | 19.4. OIDC provider on wristband | 0/TBD | Not started | - |

View File

@@ -4,16 +4,16 @@ milestone: v1.0
current_phase: "19.1" current_phase: "19.1"
current_phase_name: Chat satellites current_phase_name: Chat satellites
status: executing status: executing
stopped_at: Completed 19.1-02-PLAN.md stopped_at: Completed 19.1-06-PLAN.md
last_updated: "2026-10-18T13:42:14.977Z" last_updated: "2026-10-18T14:02:15.837Z"
last_activity: 2026-10-18 last_activity: 2026-10-18
last_activity_desc: "Completed quick task 261018-k9s: add the D-17 module in summercms.go (modules/breakwater); 19.1-02 forum plan unblocked" last_activity_desc: "Completed quick task 261018-k9s: add the D-17 module in summercms.go (modules/breakwater); 19.1-02 forum plan unblocked"
state_head: 1f204f5a6c2d2289d434105e0e22f94693ae5705 state_head: 7e51959b14b03ef5f1854e974b9927a5a73e57cb
progress: progress:
total_phases: 41 total_phases: 41
completed_phases: 33 completed_phases: 33
total_plans: 204 total_plans: 204
completed_plans: 203 completed_plans: 204
gsd_state_version: "1.0" gsd_state_version: "1.0"
milestone_name: milestone milestone_name: milestone
--- ---
@@ -30,7 +30,7 @@ See: .planning/PROJECT.md (updated 2026-10-12)
## Current Position ## Current Position
Phase: 19.1 (Chat satellites) — EXECUTING Phase: 19.1 (Chat satellites) — EXECUTING
Plan: 5 of 6 Plan: 6 of 6
Status: Ready to execute Status: Ready to execute
Last activity: 2026-10-18 — Completed quick task 261018-k9s: add the D-17 module in summercms.go (modules/breakwater); 19.1-02 forum plan unblocked Last activity: 2026-10-18 — Completed quick task 261018-k9s: add the D-17 module in summercms.go (modules/breakwater); 19.1-02 forum plan unblocked
@@ -256,6 +256,7 @@ Progress: [████████░░] 80%
| Phase 19.1-chat-satellites P19.1-04 | 11 | 4 tasks | 35 files | | Phase 19.1-chat-satellites P19.1-04 | 11 | 4 tasks | 35 files |
| Phase 19.1-chat-satellites P19.1-05 | 10min | 4 tasks | 37 files | | Phase 19.1-chat-satellites P19.1-05 | 10min | 4 tasks | 37 files |
| Phase 19.1 P19.1-02 | 9 min | 4 tasks | 36 files | | Phase 19.1 P19.1-02 | 9 min | 4 tasks | 36 files |
| Phase 19.1 P19.1-06 | 16 | 3 tasks | 46 files |
## Accumulated Context ## Accumulated Context
@@ -867,6 +868,9 @@ Recent decisions affecting current work:
- [Phase 19.1]: Task 2 reply verbatim: proceed — Human locked D-02 baseline id 202610180001_create_golem15_forum_baseline and D-05 prefix /_forum/api/v1 before the sibling repo existed. Remote policy follows plan 01 proceed-and-push. - [Phase 19.1]: Task 2 reply verbatim: proceed — Human locked D-02 baseline id 202610180001_create_golem15_forum_baseline and D-05 prefix /_forum/api/v1 before the sibling repo existed. Remote policy follows plan 01 proceed-and-push.
- [Phase 19.1]: Locked D-02 baseline id 202610180001_create_golem15_forum_baseline and D-05 prefix /_forum/api/v1; remote policy follows plan 01 proceed-and-push — Continuation recorded the lock from the human proceed reply; Task 1 and Task 2 were not re-asked. - [Phase 19.1]: Locked D-02 baseline id 202610180001_create_golem15_forum_baseline and D-05 prefix /_forum/api/v1; remote policy follows plan 01 proceed-and-push — Continuation recorded the lock from the human proceed reply; Task 1 and Task 2 were not re-asked.
- [Phase 19.1]: tea repos create --owner golem15 --name sm-forum-plugin succeeded; main pushed at 6a40030 (never force). summercms.go was not pushed. — Plan 01 remote policy proceed-and-push; tea-create only after Task 4 green. - [Phase 19.1]: tea repos create --owner golem15 --name sm-forum-plugin succeeded; main pushed at 6a40030 (never force). summercms.go was not pushed. — Plan 01 remote policy proceed-and-push; tea-create only after Task 4 green.
- [Phase 19.1]: Goldens from PHP fixtures; live capture NOT RUN — No live PHP Wavepath backend was reachable.
- [Phase 19.1]: Execute should now run the security-review agent; this execute did not spawn it — Five APIs, push sender, token issuer, sanitizer boundary, and GDPR cascades now exist.
- [Phase 19.1]: Gate named-short vs postgres split follows the skip detector — TestHTTPTracer and TestReconcileEmptyRoom skip under -short; a skip is refuse.
### Pending Todos ### Pending Todos
@@ -950,6 +954,6 @@ Items acknowledged and carried forward from previous milestone close:
## Session Continuity ## Session Continuity
Last session: 2026-10-18T13:41:50.737Z Last session: 2026-10-18T14:01:53.356Z
Stopped at: Completed 19.1-02-PLAN.md Stopped at: Completed 19.1-06-PLAN.md
Resume file: None Resume file: None