docs(19.1-04): record plan progress after herald SUMMARY

Co-authored-by: Cursor <cursoragent@cursor.com>
This commit is contained in:
Jakub Zych
2026-10-18 13:50:31 +02:00
parent 0d3ba6517b
commit 4f58c8fc2a
3 changed files with 16 additions and 12 deletions

View File

@@ -1235,13 +1235,13 @@ Plans:
3. Already met: fonoteka's PHP userfriends tree equals Wavepath 182b514; fonoteka.go has no port and Wavepath's copy is the single source.
4. The new code has unit tests, delivered in the phase's last plan.
**Plans:** 2/6 plans executed
**Plans:** 3/6 plans executed
Plans:
**Wave 1**
- [x] 19.1-01-PLAN.md — userfriends repo, baseline, friends HTTP tracer, group events, soft chat adapter, GDPR
- [x] 19.1-03-PLAN.md — chatbots repo, bot_flags, slash-command dispatcher, /ping tracer (no AI-plugin import)
- [ ] 19.1-04-PLAN.md — webpush-go note, then herald subscriptions, PublicOnly send, rollback-sends-0 tracer
- [x] 19.1-04-PLAN.md — webpush-go note, then herald subscriptions, PublicOnly send, rollback-sends-0 tracer
**Wave 2** *(D-17 gate for forum; chatvideo after chat)*
- [ ] 19.1-02-PLAN.md — forum repo after D-17 Render/Purify, DeleteContext, GFM/XSS HTTP tracer
@@ -1434,7 +1434,7 @@ Phases execute in numeric order: 1 → 2 → 3 → 4 → 5 → 6 → 7 → 8 →
| 18. Payment Gateway | 8/8 | Complete | 2026-10-14 |
| 18.1. Payment Gateway Subscriptions | 9/9 | Complete | 2026-10-16 |
| 19. Chat and ChatChannels | 7/7 | Complete | 2026-10-17 |
| 19.1. Chat satellites | 2/6 | In Progress| |
| 19.1. Chat satellites | 3/6 | In Progress| |
| 19.2. Chat polish against WavePath clients | 0/TBD | Not started | - |
| 19.3. Framework transport and infrastructure for WavePath | 6/6 | In Progress| |
| 19.4. OIDC provider on wristband | 0/TBD | Not started | - |

View File

@@ -4,16 +4,16 @@ milestone: v1.0
current_phase: "19.1"
current_phase_name: Chat satellites
status: executing
stopped_at: Completed 19.1-03-PLAN.md
last_updated: "2026-10-18T11:36:12.092Z"
stopped_at: Completed 19.1-04-PLAN.md
last_updated: "2026-10-18T11:50:07.430Z"
last_activity: 2026-10-18
last_activity_desc: Phase 19.1 execution started
state_head: ceabc9ccbc6b6075b36e9efad3656edf9db05e44
state_head: 0d3ba6517b093c53593516fde5520ff569024071
progress:
total_phases: 41
completed_phases: 33
total_plans: 204
completed_plans: 200
completed_plans: 201
gsd_state_version: "1.0"
milestone_name: milestone
---
@@ -30,7 +30,7 @@ See: .planning/PROJECT.md (updated 2026-10-12)
## Current Position
Phase: 19.1 (Chat satellites) — EXECUTING
Plan: 2 of 6
Plan: 3 of 6
Status: Ready to execute
Last activity: 2026-10-18 — Phase 19.1 execution started
@@ -253,6 +253,7 @@ Progress: [████████░░] 80%
| Phase 19 P01 | 80min | 3 tasks | 34 files |
| Phase 19.1 P01 | 12min | 3 tasks | 37 files |
| Phase 19.1 P19.1-03 | 7 min | 3 tasks | 32 files |
| Phase 19.1-chat-satellites P19.1-04 | 11 | 4 tasks | 35 files |
## Accumulated Context
@@ -854,6 +855,9 @@ Recent decisions affecting current work:
- [Phase 19.1]: tea repos create --owner golem15 --name sm-userfriends-plugin succeeded; main pushed at 2480ff0 (never force). summercms.go was not pushed.
- [Phase 19.1]: Task 1 reply verbatim: proceed. Locked D-02 baseline 202610180001_create_golem15_chatbots_baseline and D-05 prefix /_chatbots/api/v1; remote follows plan 01 proceed-and-push.
- [Phase 19.1]: tea repos create --owner golem15 --name sm-chatbots-plugin succeeded; main pushed at c7d9108 (never force). summercms.go was not pushed.
- [Phase 19.1-chat-satellites]: Task 2 reply verbatim: proceed
- [Phase 19.1-chat-satellites]: Locked D-02 baseline id 202610180001_create_golem15_herald_baseline and D-05 prefix /_herald/api/v1; remote policy follows plan 01 proceed-and-push
- [Phase 19.1-chat-satellites]: tea repos create --owner golem15 --name sm-herald-plugin succeeded; main pushed at 46af07a (never force). summercms.go was not pushed.
### Pending Todos
@@ -937,6 +941,6 @@ Items acknowledged and carried forward from previous milestone close:
## Session Continuity
Last session: 2026-10-18T11:36:11.338Z
Stopped at: Completed 19.1-03-PLAN.md
Last session: 2026-10-18T11:50:06.707Z
Stopped at: Completed 19.1-04-PLAN.md
Resume file: None

View File

@@ -171,7 +171,7 @@
{
"number": "19.1",
"name": "Chat satellites",
"status": "pending"
"status": "in_progress"
},
{
"number": "19.2",
@@ -214,5 +214,5 @@
"label": "Advance to the next step",
"reason": "Phase 19.1 of 41 · executing"
},
"updated_at": "2026-10-18T11:21:49.771Z"
"updated_at": "2026-10-18T11:50:01.837Z"
}