docs(19-07): complete gap-closure unit tests plan

Named postgres tests lock teammate DM write-IDOR and creator-delete CASCADE; the phase gate requires those names. Plans 7/7.

Co-authored-by: Cursor <cursoragent@cursor.com>
This commit is contained in:
Jakub Zych
2026-10-17 22:37:47 +02:00
parent bd301a1696
commit 70682b4b27
2 changed files with 178 additions and 2 deletions

View File

@@ -1198,7 +1198,7 @@ Plans:
3. Golden tests show that the serializers (`Message.toApiArray` with attachments, thread summaries, channel, category, pref, pin and mention arrays) and every realtime event (name, channel and payload) match PHP output captured from Wavepath. Route-level parity of `/_wave` is checked at the Wavepath port.
4. The new code has unit tests, delivered in the phase's last plan.
**Plans:** 6/7 plans executed
**Plans:** 7/7 plans complete
Plans:
**Wave 1**
@@ -1218,7 +1218,7 @@ Plans:
- [x] 19-06-PLAN.md — Participant-only canSend (CR-01) and created_by reassignment on user.Deleting (CR-02)
**Wave 6** *(gap closure, tests last)*
- [ ] 19-07-PLAN.md — TestTeammateDMWriteIDOR, TestDeletingCascade creator path, check-phase19.sh names
- [x] 19-07-PLAN.md — TestTeammateDMWriteIDOR, TestDeletingCascade creator path, check-phase19.sh names
### Phase 19.1: Chat satellites

View File

@@ -0,0 +1,176 @@
---
phase: 19-chat-and-chatchannels
plan: 07
subsystem: testing
tags: [chat, chatchannels, IDOR, GDPR, TestTeammateDMWriteIDOR, TestDeletingCascade, check-phase19]
requires:
- phase: 19-06
provides: participant-only SendMessage (HTTP 404) and ReassignCreatedBy on user.Deleting
provides:
- "CR-01 named postgres test: TestTeammateDMWriteIDOR (third teammate POST into pair DM is 404)"
- "CR-02 creator-delete assertions on TestDeletingCascade (FormAfterDelete sequence)"
- "scripts/check-phase19.sh PG_CHAT_TESTS requires TestTeammateDMWriteIDOR"
affects: [Wavepath port, 19.1]
actuals:
tokens: 1428
tasks: 3
commits: 2
plan_head_before: d1852f6cdafbeffc7599aebfbb2cef92316c27ab
plan_head_after: pending-summary-commit
tech-stack:
added: []
patterns:
- "Slash-free top-level postgres names so go_named -run regex stays valid"
- "FormAfterDelete in tests is Fire DeletingEvent then Unscoped delete of the user row"
key-files:
created: []
modified:
- ../sm-chat-plugin/http_tracer_test.go
- ../sm-chatchannels-plugin/http_tracer_test.go
- scripts/check-phase19.sh
- .planning/ROADMAP.md
key-decisions:
- "TestTeammateDMWriteIDOR is a top-level test, not a slash subtest"
- "TestDeletingCascade stays one function: Bob-as-member block then a second private channel for Alice-as-creator"
- "WR-01..WR-04 and IN-01..IN-02 stay open"
patterns-established:
- "Gap-closure HTTP IDOR cases reuse bootWeb/call/frontendToken and skip via TestMain -short"
- "Creator-delete GDPR cases match FormAfterDelete: Fire then Unscoped delete"
requirements-completed: [SC-19-1, D-08, D-13]
coverage:
- id: D1
description: "Two context members open a DM; a third teammate POSTing into that conversation id gets 404; the pair can still send (CR-01 / D-08 / SC-19-1)"
requirement: SC-19-1
verification:
- kind: integration
ref: "../sm-chat-plugin/http_tracer_test.go#TestTeammateDMWriteIDOR"
status: pass
- kind: other
ref: "bash scripts/check-phase19.sh --all"
status: pass
human_judgment: false
- id: D2
description: "Deleting Alice the creator (Fire DeletingEvent then Unscoped delete) leaves Bob's member row, the channel row, and the conversation with created_by = Bob (CR-02 / D-13)"
requirement: D-13
verification:
- kind: integration
ref: "../sm-chatchannels-plugin/http_tracer_test.go#TestDeletingCascade"
status: pass
- kind: other
ref: "bash scripts/check-phase19.sh --all"
status: pass
human_judgment: false
- id: D3
description: "check-phase19.sh requires TestTeammateDMWriteIDOR and TestDeletingCascade by name; --self-test and --all pass"
requirement: D-08
verification:
- kind: other
ref: "bash scripts/check-phase19.sh --self-test"
status: pass
- kind: other
ref: "bash scripts/check-phase19.sh --all"
status: pass
human_judgment: false
duration: 5min
completed: 2026-10-17
status: complete
---
# Phase 19 Plan 07: Chat/ChatChannels Gap-Closure Tests Summary
**Named postgres tests lock teammate DM write-IDOR as HTTP 404 and creator-delete CASCADE, and check-phase19.sh requires those names**
## Performance
- **Duration:** 5 min
- **Started:** 2026-10-17T20:31:59Z
- **Completed:** 2026-10-17T20:37:09Z
- **Tasks:** 3
- **Files modified:** 4
## Accomplishments
- `TestTeammateDMWriteIDOR` POSTs a two-person DM as A, counts exactly two participants (A and B), then C (same `acme.teams` host) POSTing `/conversations/{id}/messages` is 404 while A is 200 or 201. `TestChatHTTPTracer` is unchanged.
- `TestDeletingCascade` keeps the Bob-as-member block. Alice then creates a second private channel with Bob; Fire `DeletingEvent` for Alice and Unscoped-delete Alice like `FormAfterDelete`. Bob's member row, the channel row, and the conversation row remain; `created_by` is Bob, not Alice.
- `scripts/check-phase19.sh` `PG_CHAT_TESTS` includes `TestTeammateDMWriteIDOR` (slash-free); `TestDeletingCascade` stays in `PG_CHATCHANNELS_TESTS`. The self-test token loop greps the new name. `--self-test` and `--all` (plugins + docs + postgres) passed on Docker.
## Task Commits
Each task was committed atomically:
1. **Task 1 (sm-chat-plugin):** `f4aeb87` (test) — `TestTeammateDMWriteIDOR`
2. **Task 2 (sm-chatchannels-plugin):** `3738f45` (test) — `TestDeletingCascade` creator-delete path
3. **Task 3 (summercms.go):** `bd301a1` (test) — `PG_CHAT_TESTS` + self-test token `TestTeammateDMWriteIDOR`
**Plan metadata:** this commit (docs)
_Plugin SHAs are local only. No remotes were pushed. fonoteka submodule pointers were not bumped._
## Files Created/Modified
- `../sm-chat-plugin/http_tracer_test.go` — `TestTeammateDMWriteIDOR` (bootWeb/call/frontendToken)
- `../sm-chatchannels-plugin/http_tracer_test.go` — second private channel + Unscoped Alice delete + `created_by` assertions
- `scripts/check-phase19.sh` — `TestTeammateDMWriteIDOR` in `PG_CHAT_TESTS` and the self-test token loop
- `.planning/ROADMAP.md` — 19-07 checked; Plans 7/7
## Decisions Made
- Top-level `TestTeammateDMWriteIDOR` so `go_named` `-run` does not split on `/`. `TestChatHTTPTracer` remains a required postgres name.
- Extend `TestDeletingCascade` in place with a second channel so Bob-as-member cannot empty the only remaining participant set.
- WR-01, WR-02, WR-03, WR-04, IN-01 and IN-02 stay open.
## Deviations from Plan
None - plan executed exactly as written.
**Total deviations:** 0 auto-fixed
**Impact on plan:** None.
## Issues Encountered
None.
## User Setup Required
None - no external service configuration required.
## Verification Results
- `grep -n 'func TestTeammateDMWriteIDOR' ../sm-chat-plugin/http_tracer_test.go` — PASS (one line)
- `grep -n 'func TestChatHTTPTracer' ../sm-chat-plugin/http_tracer_test.go` — PASS (one line)
- `go -C ../sm-chat-plugin vet ./... && go -C ../sm-chat-plugin test -count=1 -short ./...` — PASS
- `go -C ../sm-chat-plugin test -count=1 -run '^TestTeammateDMWriteIDOR$' -v .` — PASS (`--- PASS: TestTeammateDMWriteIDOR (0.87s)`)
- `grep -n 'func TestDeletingCascade' ../sm-chatchannels-plugin/http_tracer_test.go` — PASS (one line)
- `grep -n 'Unscoped' ../sm-chatchannels-plugin/http_tracer_test.go` — PASS
- `grep -n 'created_by' ../sm-chatchannels-plugin/http_tracer_test.go` — PASS
- `go -C ../sm-chatchannels-plugin vet ./... && go -C ../sm-chatchannels-plugin test -count=1 -short ./...` — PASS
- `go -C ../sm-chatchannels-plugin test -count=1 -run '^TestDeletingCascade$' -v .` — PASS (`--- PASS: TestDeletingCascade (0.80s)`)
- `bash -n scripts/check-phase19.sh && bash scripts/check-phase19.sh --self-test` — PASS (`phase19 self-test passed`)
- `bash scripts/check-phase19.sh --all` — PASS (`phase19 postgres passed`; 6 chat + 4 chatchannels named tests; `Phase 19 gate passed`)
- No remotes pushed; `sm-chat-plugin` and `sm-chatchannels-plugin` remain local-ahead only
- WR-01..WR-04 and IN-01..IN-02 unread
## Next Phase Readiness
Phase 19 plans are 7/7. Ready for `/msd-verify-work 19` and Phase 19.1 (chat satellites). Unit tests were the last plan. WR-01..WR-04 and IN-01..IN-02 stay open.
---
*Phase: 19-chat-and-chatchannels*
*Completed: 2026-10-17*
## Self-Check: PASSED
- FOUND: `.planning/phases/19-chat-and-chatchannels/19-07-SUMMARY.md`
- FOUND: `../sm-chat-plugin/http_tracer_test.go` commit `f4aeb87`
- FOUND: `../sm-chatchannels-plugin/http_tracer_test.go` commit `3738f45`
- FOUND: `scripts/check-phase19.sh` commit `bd301a1`
- FOUND: ROADMAP 19-07 checked; Plans 7/7