docs(phase-19.7): update tracking after wave 4
This commit is contained in:
@@ -1454,7 +1454,7 @@ Plans:
|
||||
3. `tools/list` lists only the tools the session's principals may call (frontend permissions through the merged group/user permissions, backend permissions and token scope through cabana), and a call runs through the route's own middleware.
|
||||
4. An editor signs in once through `wristband` OAuth as a frontend user; with a verified link to a backend user, backend-guarded tools such as Journal's run as that admin, and removing the link or the grant removes them. The phase gets a security review; the MCP SDK dependency has a decision note before code lands; unit tests are the last plan.
|
||||
|
||||
**Plans:** 3/5 plans executed
|
||||
**Plans:** 4/5 plans executed
|
||||
|
||||
Plans:
|
||||
**Wave 1**
|
||||
@@ -1467,7 +1467,7 @@ Plans:
|
||||
- [x] 19.7-03-PLAN.md — sm-user-plugin: verified account link, Administrators-screen link actions, plugin frontend permission codes, the `user` MCP guard and `user_me` tool, plugin release and app pointer bumps
|
||||
|
||||
**Wave 4** *(blocked on Wave 3 completion)*
|
||||
- [ ] 19.7-04-PLAN.md — sm-oauthserver-plugin `backend` scope, `oas_at_` verifier and MCP consent JSON; Journal tools; vue-demo-app `/connect` and `/link-admin`; sm-demo-app wiring, e2e and deploy notes; plugin releases
|
||||
- [x] 19.7-04-PLAN.md — sm-oauthserver-plugin `backend` scope, `oas_at_` verifier and MCP consent JSON; Journal tools; vue-demo-app `/connect` and `/link-admin`; sm-demo-app wiring, e2e and deploy notes; plugin releases
|
||||
|
||||
**Wave 5** *(blocked on Wave 4 completion)*
|
||||
- [ ] 19.7-05-PLAN.md — Unit tests across six repos, `scripts/check-phase19.7.sh`, the filled validation map and the security review
|
||||
@@ -1607,7 +1607,7 @@ Phases execute in numeric order: 1 → 2 → 3 → 4 → 5 → 6 → 7 → 8 →
|
||||
| 19.5. Social login in sm-user-plugin | 5/5 | Complete | 2026-10-21 |
|
||||
| 19.6. Two-factor auth and device flow in sm-user-plugin | 0/TBD | Not started | - |
|
||||
| 19.6.1. Backend Administrators screen (INSERTED) | 5/5 | Complete | 2026-10-22 |
|
||||
| 19.7. Generic MCP module | 3/5 | In Progress| |
|
||||
| 19.7. Generic MCP module | 4/5 | In Progress| |
|
||||
| 19.8. Console commands overhaul (INSERTED) | 6/6 | In Progress| |
|
||||
| 20. Demo instance with every shared plugin | 0/TBD | Not started | - |
|
||||
| 30. Płytarium cutover | 0/TBD | Not started | - |
|
||||
|
||||
@@ -4,11 +4,11 @@ milestone: v1.0
|
||||
current_phase: "19.7"
|
||||
current_phase_name: Generic MCP module (INSERTED)
|
||||
status: executing
|
||||
stopped_at: Completed 19.7-03-PLAN.md
|
||||
last_updated: "2026-10-23T10:44:15.418Z"
|
||||
stopped_at: Completed 19.7-04-PLAN.md
|
||||
last_updated: "2026-10-23T11:18:15.153Z"
|
||||
last_activity: 2026-10-23
|
||||
last_activity_desc: "Completed 19.7-03: sm-user-plugin v0.1.10 released, five apps bumped"
|
||||
state_head: 7c43820afe1177230e0e07f08fcf222ecfdaad96
|
||||
last_activity_desc: "Completed 19.7-04: oauthserver v0.1.2, Journal v0.2.3, demo MCP wiring"
|
||||
state_head: 81266de77d84180e1158f477d9d6f3467f231303
|
||||
progress:
|
||||
total_phases: 45
|
||||
completed_phases: 37
|
||||
@@ -30,7 +30,7 @@ See: .planning/PROJECT.md (updated 2026-10-22)
|
||||
## Current Position
|
||||
|
||||
Phase: 19.7 (Generic MCP module (INSERTED)) — EXECUTING
|
||||
Plan: 4 of 5
|
||||
Plan: 5 of 5
|
||||
Status: Ready to execute
|
||||
Last activity: 2026-10-23 — Phase 19.7 execution started
|
||||
|
||||
@@ -1068,5 +1068,5 @@ Items acknowledged and carried forward from previous milestone close:
|
||||
## Session Continuity
|
||||
|
||||
Last session: 2026-10-22T22:22:57.128Z
|
||||
Stopped at: Completed 19.7-03-PLAN.md
|
||||
Stopped at: Completed 19.7-04-PLAN.md
|
||||
Resume file: None
|
||||
|
||||